221 garage, shed and shade structure permits were issued in New Braunfels, October 2024 through September 2026: about 110 a year and 2% of all permits. 105 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 9% fewer than the 116 in the 12 months before. The busiest month is April. The usual one took 65 days from issue to the city's final. 78130 has the most, 109.

221permits issued
105last 12 months
Aprbusiest month
65days, usual issue to final
60%finished
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 13Oct2024Nov 2024: 9Dec 2024: 10Jan 2025: 5Jan2025Feb 2025: 8Mar 2025: 7Apr 2025: 13May 2025: 6Jun 2025: 14Jul 2025: 14JulAug 2025: 7Sep 2025: 10Oct 2025: 10Nov 2025: 4Dec 2025: 6Jan 2026: 11Jan2026Feb 2026: 12Mar 2026: 12Apr 2026: 12May 2026: 8Jun 2026: 5Jul 2026: 10JulAug 2026: 10Sep 2026: 5
The same numbers as a table
MonthPermits
Oct 202413
Nov 20249
Dec 202410
Jan 20255
Feb 20258
Mar 20257
Apr 202513
May 20256
Jun 202514
Jul 202514
Aug 20257
Sep 202510
Oct 202510
Nov 20254
Dec 20256
Jan 202611
Feb 202612
Mar 202612
Apr 202612
May 20268
Jun 20265
Jul 202610
Aug 202610
Sep 20265

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (136), November the quietest (71). A busy month at the permit counter usually means a longer wait for a contractor.

January: 87 (100 = an average month)February: 109 (100 = an average month)March: 103 (100 = an average month)April: 136 (100 = an average month)136May: 76 (100 = an average month)June: 103 (100 = an average month)July: 130 (100 = an average month)August: 92 (100 = an average month)September: 81 (100 = an average month)October: 125 (100 = an average month)November: 71 (100 = an average month)December: 87 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January87
February109
March103
April136
May76
June103
July130
August92
September81
October125
November71
December87

Download this table (CSV)

How long a garage, shed and shade structure permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 69 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025116
Finished59.5%
Expired0.0%
Usual days, issue to final65
Middle half, days29–147

Download this table (CSV)

ZIP codes with the most garage, shed and shade structure permits

Counted at the property's ZIP code. Share is the part of the city's 221 garage, shed and shade structure permits.

ZIP codePermitsShare
7813010949%
781322712%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential - Deck-Patio14164%
Residential - Accessory Building4420%
Residential - Garage/Carport3616%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most garage, shed and shade structure permits in the City of New Braunfels Open Data file, October 2024 through September 2026, with 5 or more each. Share is the part of all 221 garage, shed and shade structure permits; 74% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Paradise Decks & Spas105%
Serview Home Pros84%
Tuff Shed Inc84%
Dos Gringos Enterprises LLC73%
Hill Country Homeworks63%
Diamond Decks LLC52%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Austin and San Antonio. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of New Braunfels Open Data, OpenData/PlanningZoning MapServer layer 10 (Permits), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical, irrigation, roofing and other construction permits the City of New Braunfels Development Services issues inside city limits, in both Comal and Guadalupe counties. Planning, platting, engineering, floodplain and inspection-request records are not counted.

  • The city's file lists the contractor on most permits. The contractor table counts permits filed per firm; it does not rate, rank or compare their work, and there are no firm pages for New Braunfels.
  • The file has no declared job value, so we show no costs.
  • A final date is the date the city closed the permit. A permit the city left at Issued counts as open.
  • Lawn-irrigation permits, driveways, flatwork and signs count as other. Foundation repairs count as remodels and repairs.
  • The file has no ZIP column; ZIP codes come from the address where it ends in one (about 60% of permits).

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in New Braunfels, TX", https://contractorrecords.com/new-braunfels/accessory-permits, data through September 2026, from City of New Braunfels Development Services building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types · Most active contractors by permits filed.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: days to final · Garages, sheds & shade structures permits by ZIP code · Garages, sheds & shade structures permits by permit type · Most active contractors by permits filed.

Common questions

  • How many garage, shed and shade structure permits does New Braunfels issue a year?About 110 a year in New Braunfels: 221 permits issued October 2024 through September 2026, 105 of them in the last 12 months.
  • How long does a garage, shed and shade structure permit take in New Braunfels?The usual one took 65 days from issue to the city's final inspection, and the middle half took 29 to 147 days (69 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in New Braunfels file the most garage, shed and shade structure permits?April (136 against an average month of 100); November is the quietest (71). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most garage, shed and shade structure permits in New Braunfels?78130, with 109 of the 221 (49%); then 78132 (27).