Home addition permits in Portland, OR

Data through September 2026 · updated 18 Oct 2026

792 home addition permits were issued in Portland, October 2024 through September 2026: about 396 a year and 1% of all permits. 400 home addition permits in the last 12 months (Oct 2025–Sep 2026), 2% more than the 392 in the 12 months before. The busiest month is April. The usual one took 195 days from issue to the city's final. 97219 has the most, 93.

792permits issued
400last 12 months
Aprbusiest month
195days, usual issue to final
79%finished
$65,000usual declared value
Sep 2026records through

Home addition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 36Oct2024Nov 2024: 26Dec 2024: 29Jan 2025: 20Jan2025Feb 2025: 32Mar 2025: 32Apr 2025: 37May 2025: 34Jun 2025: 38Jul 2025: 40JulAug 2025: 39Sep 2025: 29Oct 2025: 41Nov 2025: 26Dec 2025: 27Jan 2026: 29Jan2026Feb 2026: 21Mar 2026: 33Apr 2026: 44May 2026: 27Jun 2026: 38Jul 2026: 38JulAug 2026: 37Sep 2026: 39
The same numbers as a table
MonthPermits
Oct 202436
Nov 202426
Dec 202429
Jan 202520
Feb 202532
Mar 202532
Apr 202537
May 202534
Jun 202538
Jul 202540
Aug 202539
Sep 202529
Oct 202541
Nov 202526
Dec 202527
Jan 202629
Feb 202621
Mar 202633
Apr 202644
May 202627
Jun 202638
Jul 202638
Aug 202637
Sep 202639

Download this table (CSV)

When home addition permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (123), January the quietest (74). A busy month at the permit counter usually means a longer wait for a contractor.

January: 74 (100 = an average month)February: 80 (100 = an average month)March: 98 (100 = an average month)April: 123 (100 = an average month)123May: 92 (100 = an average month)June: 115 (100 = an average month)July: 118 (100 = an average month)August: 115 (100 = an average month)September: 103 (100 = an average month)October: 117 (100 = an average month)November: 79 (100 = an average month)December: 85 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January74
February80
March98
April123
May92
June115
July118
August115
September103
October117
November79
December85

Download this table (CSV)

How long a home addition permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 306 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025392
Finished78.6%
Expired4.3%
Usual days, issue to final195
Middle half, days113–300

Download this table (CSV)

What a home addition permit is declared at

The value written on the permit at application, from 688 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$65,000
Middle half$22,232–$137,000

Download this table (CSV)

ZIP codes with the most home addition permits

Counted at the property's ZIP code. Share is the part of the city's 792 home addition permits.

ZIP codePermitsShare
972199312%
97206628%
97212547%
97202537%
97211516%
97213496%
97203476%
97217466%
97215425%
97221354%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential 1 & 2 Family Permit / Single Family Dwelling77097%
Residential 1 & 2 Family Permit / Duplex/Two Family Dwelling142%
Residential 1 & 2 Family Permit / Townhouse (3 or more units)6under 1%
Residential 1 & 2 Family Permit / Floating Home2under 1%

Download this table (CSV)

Nearby permit data

Home addition permits for other places in Portland. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Portland, PortlandMaps Public/BDS_Permit FeatureServer layer 22 (All Permits), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Portland Permitting & Development (formerly the Bureau of Development Services) issued for property inside the City of Portland. Permits the bureau handles for places outside the city limits, and tree, nuisance, noise, land-use and right-of-way cases in the same file, are not counted. Gresham, Beaverton, Lake Oswego and the rest of the metro area run their own permit offices.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Portland.
  • Electrical, mechanical and plumbing permits are trade permits filed on their own, so one job (a remodel, say) can show up as a building permit plus several trade permits.
  • Job value is the value declared on building permits only; electrical, mechanical and plumbing permits carry no value, so costs are shown only for kinds of work filed as building permits.
  • A final date is the city's finaled date. A permit that expired or was cancelled is not counted as finished even when the file gives it a closing date.
  • The ZIP code comes from the county tax lot the permit is filed on; permits not tied to a tax lot have no ZIP code.
  • Roofing and solar jobs are picked out of residential building permits by their descriptions; a reroof that needs no structural work needs no permit in Portland, so roofing counts are low.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Home addition permits in Portland, OR", https://contractorrecords.com/portland/addition-permits, data through September 2026, from Portland Permitting & Development building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Additions permits by month · Additions permits by calendar month (index) · Additions permits: days to final · Additions permits: declared value · Additions permits by ZIP code · Additions permits by permit type.

Common questions

  • How many home addition permits does Portland issue a year?About 396 a year in Portland: 792 permits issued October 2024 through September 2026, 400 of them in the last 12 months.
  • How long does a home addition permit take in Portland?The usual one took 195 days from issue to the city's final inspection, and the middle half took 113 to 300 days (306 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Portland file the most home addition permits?April (123 against an average month of 100); January is the quietest (74). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most home addition permits in Portland?97219, with 93 of the 792 (12%); then 97206 (62).