New home permits in Portland, OR

Data through September 2026 · updated 18 Oct 2026

2,203 new home permits were issued in Portland, October 2024 through September 2026: about 1,102 a year and 3% of all permits. 1,097 new home permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 1,106 in the 12 months before. The busiest month is October. The usual one took 252 days from issue to the city's final. 97206 has the most, 212.

2,203permits issued
1,097last 12 months
Octbusiest month
252days, usual issue to final
93%finished
$100,000usual declared value
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 157Oct2024Nov 2024: 67Dec 2024: 88Jan 2025: 58Jan2025Feb 2025: 101Mar 2025: 88Apr 2025: 115May 2025: 71Jun 2025: 94Jul 2025: 87JulAug 2025: 90Sep 2025: 90Oct 2025: 98Nov 2025: 50Dec 2025: 78Jan 2026: 96Jan2026Feb 2026: 98Mar 2026: 144Apr 2026: 77May 2026: 64Jun 2026: 127Jul 2026: 85JulAug 2026: 73Sep 2026: 107
The same numbers as a table
MonthPermits
Oct 2024157
Nov 202467
Dec 202488
Jan 202558
Feb 2025101
Mar 202588
Apr 2025115
May 202571
Jun 202594
Jul 202587
Aug 202590
Sep 202590
Oct 202598
Nov 202550
Dec 202578
Jan 202696
Feb 202698
Mar 2026144
Apr 202677
May 202664
Jun 2026127
Jul 202685
Aug 202673
Sep 2026107

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (139), November the quietest (64). A busy month at the permit counter usually means a longer wait for a contractor.

January: 84 (100 = an average month)February: 108 (100 = an average month)March: 126 (100 = an average month)April: 105 (100 = an average month)May: 74 (100 = an average month)June: 120 (100 = an average month)July: 94 (100 = an average month)August: 89 (100 = an average month)September: 107 (100 = an average month)October: 139 (100 = an average month)139November: 64 (100 = an average month)December: 90 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January84
February108
March126
April105
May74
June120
July94
August89
September107
October139
November64
December90

Download this table (CSV)

How long a new home permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,023 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,106
Finished93.2%
Expired1.7%
Usual days, issue to final252
Middle half, days194–324

Download this table (CSV)

What a new home permit is declared at

The value written on the permit at application, from 1,916 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$100,000
Middle half$35,000–$100,000

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the city's 2,203 new home permits.

ZIP codePermitsShare
9720621210%
972191868%
97217904%
97202874%
97218844%
97266763%
97203733%
97213693%
97215472%
97211462%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential 1 & 2 Family Permit / Single Family Dwelling1,07649%
Residential 1 & 2 Family Permit / Townhouse (3 or more units)1,00145%
Residential 1 & 2 Family Permit / Townhouse (2 Units)854%
Residential 1 & 2 Family Permit / Duplex/Two Family Dwelling281%
Manufactured Home in Park Permit / Single Family Dwelling5under 1%
Manufactured Home on Indiv. Lot Permit / Accessory Dwelling Unit4under 1%
Manufactured Home on Indiv. Lot Permit / Single Family Dwelling3under 1%
Residential 1 & 2 Family Permit / Floating Home1under 1%

Download this table (CSV)

How Portland compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

New home permits for other places in Portland. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Portland, PortlandMaps Public/BDS_Permit FeatureServer layer 22 (All Permits), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Portland Permitting & Development (formerly the Bureau of Development Services) issued for property inside the City of Portland. Permits the bureau handles for places outside the city limits, and tree, nuisance, noise, land-use and right-of-way cases in the same file, are not counted. Gresham, Beaverton, Lake Oswego and the rest of the metro area run their own permit offices.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Portland.
  • Electrical, mechanical and plumbing permits are trade permits filed on their own, so one job (a remodel, say) can show up as a building permit plus several trade permits.
  • Job value is the value declared on building permits only; electrical, mechanical and plumbing permits carry no value, so costs are shown only for kinds of work filed as building permits.
  • A final date is the city's finaled date. A permit that expired or was cancelled is not counted as finished even when the file gives it a closing date.
  • The ZIP code comes from the county tax lot the permit is filed on; permits not tied to a tax lot have no ZIP code.
  • Roofing and solar jobs are picked out of residential building permits by their descriptions; a reroof that needs no structural work needs no permit in Portland, so roofing counts are low.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in Portland, OR", https://contractorrecords.com/portland/new-home-permits, data through September 2026, from Portland Permitting & Development building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: days to final · New homes permits: declared value · New homes permits by ZIP code · New homes permits by permit type.

Common questions

  • How many new home permits does Portland issue a year?About 1,102 a year in Portland: 2,203 permits issued October 2024 through September 2026, 1,097 of them in the last 12 months.
  • How long does a new home permit take in Portland?The usual one took 252 days from issue to the city's final inspection, and the middle half took 194 to 324 days (1,023 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Portland file the most new home permits?October (139 against an average month of 100); November is the quietest (64). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Portland?97206, with 212 of the 2,203 (10%); then 97219 (186).