Contractor Records
Home › Richmond › ZIP 94803

Building permits in 94803, Richmond

Data through April 2025 · updated 21 Oct 2026

917 building permits were issued in ZIP code 94803 by City of Richmond Building Services, May 2023 through April 2025: 14% of the 6,783 in Richmond, the 4th busiest ZIP code. Solar permits lead with 206. 497 permits in the last 12 months on file (May 2024–Apr 2025), 18% more than the 420 in the 12 months before. Permits from a city that runs its own permit office are not counted.

917permits in 94803
497last 12 months on file
97%for homes
50days, usual issue to final
Apr 2025records through

Permits in 94803 by kind of work

Share here is the part of the 917 permits in 94803; citywide is the same for all of Richmond.

Kind of workPermitsShare hereCitywide
Solar20622%15%
Remodels & repairs17219%17%
Roofing16418%16%
HVAC14015%8%
Electrical10812%17%
Plumbing9210%11%
ADUs & casitas7under 1%2%
Additions5under 1%under 1%
New homes4under 1%2%
Fences & walls2under 1%under 1%
Pools & spas2under 1%under 1%
Demolition1under 1%under 1%
Other142%11%

Download this table (CSV)

Permits in 94803 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2023 (from May)8313470
202412440440
2025 (through April)4164492

Download this table (CSV)

How permits in 94803 finish

Permits issued May 2023–Apr 2024, at least 12 months before the file ends.

Measure94803Citywide
Permits issued May 2023–Apr 20244203,485
Finished78.1%76.0%
Expired10.7%11.1%
Usual days, issue to final5060

Download this table (CSV)

How these numbers are made

Source: Transparent Richmond, PermitTrak (Socrata dataset qg2r-652v), read 21 Oct 2026. We count permits issued May 2023 through April 2025; denied and withdrawn permits are left out.

Building and trade permits the City of Richmond issued inside the city limits, including SolarAPP+ solar permits; a few city parcels carry an El Sobrante or San Pablo mailing address. Encroachment, fire, wastewater, rent-control and business permits, plan-check records and revisions of earlier permits are left out. Unincorporated North Richmond and El Sobrante are permitted by Contra Costa County and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Richmond.
  • The city's published file holds no building permit issued after April 2025, although it is still updated for other permit kinds, so these pages end with April 2025.
  • Finished means the city's status is Finaled or Closed; a final date comes from the city's finaled date. Expired permits lapsed without a final inspection; cancelled permits are not counted.
  • The value is the job value declared on the permit.
  • Homes are the permits the city files as residential (building, electrical, plumbing and mechanical) plus SolarAPP+ rooftop solar permits.
  • Solar battery (Powerwall) permits without panels count as electrical; seismic retrofits and alteration or repair permits count as remodels.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 94803, Richmond", https://contractorrecords.com/richmond-ca/zip/94803, data through April 2025, from City of Richmond Building Services building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 94803 by kind of work · Permits in 94803 by year · Permits in 94803: finished and days to final.

Common questions

  • How many building permits were issued in 94803?917 permits issued by the city in ZIP code 94803, May 2023 through April 2025: 206 solar, 172 remodels & repairs, 164 roofing. 497 were in the last 12 months on file (to April 2025).
  • What is built most in 94803?Solar: 206 of the 917 permits (22%), against 15% citywide.
  • How long does a permit take in 94803?The usual permit issued here May 2023–Apr 2024 took 50 days from issue to final (326 permits with a final date), against 60 days citywide.
  • Who did the work in 94803?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.