Contractor Records
Home › Richmond › Remodels & repairs

Remodel and repair permits in Richmond, CA

Data through April 2025 · updated 21 Oct 2026

1,159 remodel and repair permits were issued in Richmond, May 2023 through April 2025: about 580 a year and 17% of all permits. 531 remodel and repair permits in the last 12 months on file (May 2024–Apr 2025), 15% fewer than the 628 in the 12 months before. The busiest month is August. The usual one took 68 days from issue to the city's final. 94804 has the most, 474.

1,159permits issued
531last 12 months on file
Augbusiest month
68days, usual issue to final
81%finished
$12,620usual declared value
Apr 2025records through

Remodel and repair permits by month

Permits issued each month, May 2023 through April 2025.

May 2023: 50May2023Jun 2023: 61Jul 2023: 46JulAug 2023: 61Sep 2023: 55Oct 2023: 55Nov 2023: 57Dec 2023: 38Jan 2024: 56Jan2024Feb 2024: 49Mar 2024: 52Apr 2024: 48May 2024: 50Jun 2024: 51Jul 2024: 37JulAug 2024: 64Sep 2024: 37Oct 2024: 62Nov 2024: 25Dec 2024: 40Jan 2025: 41Jan2025Feb 2025: 39Mar 2025: 50Apr 2025: 35
The same numbers as a table
MonthPermits
May 202350
Jun 202361
Jul 202346
Aug 202361
Sep 202355
Oct 202355
Nov 202357
Dec 202338
Jan 202456
Feb 202449
Mar 202452
Apr 202448
May 202450
Jun 202451
Jul 202437
Aug 202464
Sep 202437
Oct 202462
Nov 202425
Dec 202440
Jan 202541
Feb 202539
Mar 202550
Apr 202535

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (129), December the quietest (81). A busy month at the permit counter usually means a longer wait for a contractor.

January: 100 (100 = an average month)February: 91 (100 = an average month)March: 106 (100 = an average month)April: 86 (100 = an average month)May: 104 (100 = an average month)June: 116 (100 = an average month)July: 86 (100 = an average month)August: 129 (100 = an average month)129September: 95 (100 = an average month)October: 121 (100 = an average month)November: 85 (100 = an average month)December: 81 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January100
February91
March106
April86
May104
June116
July86
August129
September95
October121
November85
December81

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued May 2023–Apr 2024, at least 12 months before the file ends. Usual days is the middle permit among the 507 with a final date.

MeasureValue
Permits issued May 2023–Apr 2024628
Finished80.9%
Expired6.8%
Usual days, issue to final68
Middle half, days37–146

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 1,150 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$12,620
Middle half$6,250–$25,106

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 1,159 remodel and repair permits.

ZIP codePermitsShare
9480447441%
9480124221%
9480317215%
9480514913%
9480612110%
945301under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
BLD RESIDENTIAL: ALTERATION/REPAIR1,03990%
BLD RESIDENTIAL: SEISMIC RETROFIT - PLAN A958%
BLD RESIDENTIAL: SEISMIC RETROFIT - FEMA PLAN SET6under 1%
BLD RESIDENTIAL: BOARD-UP5under 1%
BLD RESIDENTIAL: ROOF/TRUSS3under 1%
BLD RESIDENTIAL: REMODEL/REPAIR2under 1%
BLD RESIDENTIAL: EQUIP NEW2under 1%
BLD RESIDENTIAL: NEW ADD DWELLING UNIT1under 1%
BLD RESIDENTIAL: EQUIP UPGRADE1under 1%
BLD RESIDENTIAL: BLD EQUIP NEW1under 1%

Download this table (CSV)

How Richmond compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in the Bay Area. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Transparent Richmond, PermitTrak (Socrata dataset qg2r-652v), read 21 Oct 2026. We count permits issued May 2023 through April 2025; denied and withdrawn permits are left out.

Building and trade permits the City of Richmond issued inside the city limits, including SolarAPP+ solar permits; a few city parcels carry an El Sobrante or San Pablo mailing address. Encroachment, fire, wastewater, rent-control and business permits, plan-check records and revisions of earlier permits are left out. Unincorporated North Richmond and El Sobrante are permitted by Contra Costa County and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Richmond.
  • The city's published file holds no building permit issued after April 2025, although it is still updated for other permit kinds, so these pages end with April 2025.
  • Finished means the city's status is Finaled or Closed; a final date comes from the city's finaled date. Expired permits lapsed without a final inspection; cancelled permits are not counted.
  • The value is the job value declared on the permit.
  • Homes are the permits the city files as residential (building, electrical, plumbing and mechanical) plus SolarAPP+ rooftop solar permits.
  • Solar battery (Powerwall) permits without panels count as electrical; seismic retrofits and alteration or repair permits count as remodels.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Richmond, CA", https://contractorrecords.com/richmond-ca/remodel-permits, data through April 2025, from City of Richmond Building Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits: declared value · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Richmond issue a year?About 580 a year in Richmond: 1,159 permits issued May 2023 through April 2025, 531 of them in the last 12 months on file (to April 2025).
  • How long does a remodel and repair permit take in Richmond?The usual one took 68 days from issue to the city's final inspection, and the middle half took 37 to 146 days (507 permits issued May 2023–Apr 2024 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Richmond file the most remodel and repair permits?August (129 against an average month of 100); December is the quietest (81). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Richmond?94804, with 474 of the 1,159 (41%); then 94801 (242).