Data through April 2025 · updated 21 Oct 2026

1,001 solar permits were issued in Richmond, May 2023 through April 2025: about 500 a year and 15% of all permits. 497 solar permits in the last 12 months on file (May 2024–Apr 2025), about the same as the 504 in the 12 months before. The busiest month is May. The usual one took 63 days from issue to the city's final. 94804 has the most, 364.

1,001permits issued
497last 12 months on file
Maybusiest month
63days, usual issue to final
80%finished
$18,820usual declared value
Apr 2025records through

Solar permits by month

Permits issued each month, May 2023 through April 2025.

May 2023: 104May2023Jun 2023: 46Jul 2023: 28JulAug 2023: 45Sep 2023: 54Oct 2023: 33Nov 2023: 25Dec 2023: 24Jan 2024: 21Jan2024Feb 2024: 45Mar 2024: 40Apr 2024: 39May 2024: 28Jun 2024: 29Jul 2024: 50JulAug 2024: 45Sep 2024: 70Oct 2024: 57Nov 2024: 35Dec 2024: 18Jan 2025: 22Jan2025Feb 2025: 51Mar 2025: 32Apr 2025: 60
The same numbers as a table
MonthPermits
May 2023104
Jun 202346
Jul 202328
Aug 202345
Sep 202354
Oct 202333
Nov 202325
Dec 202324
Jan 202421
Feb 202445
Mar 202440
Apr 202439
May 202428
Jun 202429
Jul 202450
Aug 202445
Sep 202470
Oct 202457
Nov 202435
Dec 202418
Jan 202522
Feb 202551
Mar 202532
Apr 202560

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). May is the busiest (158), December the quietest (50). A busy month at the permit counter usually means a longer wait for a contractor.

January: 52 (100 = an average month)February: 115 (100 = an average month)March: 86 (100 = an average month)April: 119 (100 = an average month)May: 158 (100 = an average month)158June: 90 (100 = an average month)July: 94 (100 = an average month)August: 108 (100 = an average month)September: 149 (100 = an average month)October: 108 (100 = an average month)November: 72 (100 = an average month)December: 50 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January52
February115
March86
April119
May158
June90
July94
August108
September149
October108
November72
December50

Download this table (CSV)

How long a solar permit takes

Permits issued May 2023–Apr 2024, at least 12 months before the file ends. Usual days is the middle permit among the 401 with a final date.

MeasureValue
Permits issued May 2023–Apr 2024504
Finished79.8%
Expired15.9%
Usual days, issue to final63
Middle half, days35–123

Download this table (CSV)

What a solar permit is declared at

The value written on the permit at application, from 994 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$18,820
Middle half$12,888–$26,250

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the city's 1,001 solar permits.

ZIP codePermitsShare
9480436436%
9480320621%
9480617017%
9480116917%
94805899%
945303under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
BLD ELC RESIDENTIAL: SOLAR92392%
BLD ELC COMMERCIAL: SOLAR252%
ONLINE SOLARAPP+ APPLICATION: BLD RESIDENTIAL202%
BLD RESIDENTIAL: SOLAR151%
ONLINE SOLARAPP+ APPLICATION: SOLAR8under 1%
BLD ELC INDUSTRIAL: SOLAR6under 1%
BLD INDUSTRIAL: SOLAR3under 1%
BLD COMMERCIAL: SOLAR1under 1%

Download this table (CSV)

How Richmond compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Solar permits for other places in the Bay Area. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Transparent Richmond, PermitTrak (Socrata dataset qg2r-652v), read 21 Oct 2026. We count permits issued May 2023 through April 2025; denied and withdrawn permits are left out.

Building and trade permits the City of Richmond issued inside the city limits, including SolarAPP+ solar permits; a few city parcels carry an El Sobrante or San Pablo mailing address. Encroachment, fire, wastewater, rent-control and business permits, plan-check records and revisions of earlier permits are left out. Unincorporated North Richmond and El Sobrante are permitted by Contra Costa County and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Richmond.
  • The city's published file holds no building permit issued after April 2025, although it is still updated for other permit kinds, so these pages end with April 2025.
  • Finished means the city's status is Finaled or Closed; a final date comes from the city's finaled date. Expired permits lapsed without a final inspection; cancelled permits are not counted.
  • The value is the job value declared on the permit.
  • Homes are the permits the city files as residential (building, electrical, plumbing and mechanical) plus SolarAPP+ rooftop solar permits.
  • Solar battery (Powerwall) permits without panels count as electrical; seismic retrofits and alteration or repair permits count as remodels.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in Richmond, CA", https://contractorrecords.com/richmond-ca/solar-permits, data through April 2025, from City of Richmond Building Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: days to final · Solar permits: declared value · Solar permits by ZIP code · Solar permits by permit type.

Common questions

  • How many solar permits does Richmond issue a year?About 500 a year in Richmond: 1,001 permits issued May 2023 through April 2025, 497 of them in the last 12 months on file (to April 2025).
  • How long does a solar permit take in Richmond?The usual one took 63 days from issue to the city's final inspection, and the middle half took 35 to 123 days (401 permits issued May 2023–Apr 2024 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Richmond file the most solar permits?May (158 against an average month of 100); December is the quietest (50). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Richmond?94804, with 364 of the 1,001 (36%); then 94803 (206).