House Demolition Cost in Sacramento County (unincorporated), CA: what the permits say

How much does house demolition cost in Sacramento County? The usual demolition job filed with Sacramento County is $10,000, from 146 priced permits (October 2023 through September 2026); the middle half of firms file between $8,700 and $14,000. A filed value is what the contractor wrote on the permit, not a quote or the final bill. The file does not say which Sacramento County (unincorporated) demolition permits were whole-house teardowns and which were garages, sheds or partial demolition, so every figure here covers all of them.

$10,000usual filed value
$8,700–$14,000middle half of firms' usual jobs
146priced permits (99% of 147)
105firms on file
115days, permit issue to final
Sep 2026records through

How much does it cost to tear down a house in Sacramento County (unincorporated)?

The usual Sacramento County (unincorporated) demolition permit is filed at $10,000, from 146 priced permits, October 2023 through September 2026. Half were filed for less, half for more. The file does not separate whole-house teardowns from garages, sheds or partial demolition, so read it as the middle of all demolition jobs, not a house-only price. A filed value is what the contractor wrote on the permit, not a quote or the final bill. A demolition permit here usually takes 115 days from issue to final inspection. How long permits take →

What the spread looks like

Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 146 priced permits across 104 firms, pooled into one. Half of Sacramento County (unincorporated) demolition permits were filed between $5,000 and $15,900.

PercentileFiled valueReads as
10th$2,0001 in 10 permits filed below
25th$5,0001 in 4 filed below
50th$10,000the middle permit
75th$15,9001 in 4 filed above
90th$25,8001 in 10 filed above

Busiest firms and what they usually charge

Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in; both are shown for firms with 5 or more priced permits. Busy is not the same as careful: pick what you value to build a list.

FirmPermitsLast 12 moUsualMiddle half
Junk Patrol LLC54$7,000$5,000–$15,000
Legacy Demolition LLC33——
Empire Demolition & Haul Inc22——
Next Demolition LLC22——
Double B Demolition Inc51$9,500$8,500–$10,000
Lassiter Excavating Inc41——
Dyer Construction Inc41——
Raya Engineering31——
Thompson's Demolition & Hauling21——
Daniel Cardenas Construction Inc21——

Why filed values run low or high

  • The 10 busiest firms usually file $7,000; the 104 firms with fewer than 10 permits usually file $10,000.
  • One permit type covers small and large jobs: 1 in 10 demolition permits is filed under $2,000 and 1 in 10 over $25,800, 13 times as much.
  • 99.3% of the 147 permits carry a value; the 1 without one are left out of every figure here.

Is your quote normal? Compare it with 146 filed values

Line your quote up against the file. In Sacramento County (unincorporated), 1 in 10 demolition filed values sit under $2,000, the middle half between $5,000 and $15,900, and 1 in 10 over $25,800.

  • $33,500Above $25,800: higher than 9 in 10 filed values for this work in Sacramento County (unincorporated).
  • $10,000Right at the usual $10,000: in the middle of the file.
  • $1,400Below $2,000: lower than 9 in 10. Ask what the quote leaves out.

When to schedule demolition in Sacramento County

Sacramento County files the fewest demolition permits in December (33 against an average month of 100) and the most in April (139). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Sacramento County →

How these numbers are made

Source: Sacramento County building permits on single-family, duplex and townhouse homes in the unincorporated county (the County's Accela permit layer). The window is October 2023 through September 2026; a permit filed after that isn't here yet.

Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.

The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.

Nobody paid to be on this page and nobody can. How the records work in Sacramento County (unincorporated) →

Common questions

  • How many quotes should I get for a demolition job in Sacramento County (unincorporated)?At least three. In the permit record the middle half of Sacramento County (unincorporated) demolition firms usually file between $8,700 and $14,000 a job, so two ordinary firms can sit 1.6 times apart and both be normal for Sacramento County (unincorporated). A third quote shows which one is the outlier. Filed values are what contractors wrote on permits, not quotes, so use them to judge the spread, not to price your own job.
  • What range is normal for demolition jobs in Sacramento County (unincorporated)?Half of permits were filed between $5,000 and $15,900; 8 in 10 between $2,000 and $25,800. These are approximate, pooled from each firm's own spread.
  • How much do demolition contractors charge in Sacramento County?The usual demolition job is filed at $10,000; the middle half of firms usually file between $8,700 and $14,000. The 10 firms with the most permits in the last 12 months usually file $7,000, less than the usual. See every firm's usual job →
  • How much is the demolition permit fee in Sacramento County?Sacramento County sets permit fees in Sacramento County Code chapter 16.90, Construction Permit Fees (read October 2026). The chapter sets the fee schedule (last amended May 2026); it names no flat fee per trade, so we don't compute one. Ask the permit office for the fee on a job filed at about $10,000, the usual demolition value here.
  • How many demolition firms work in Sacramento County (unincorporated)?105 firms appear on the file; 43 pulled at least one permit in the last 12 months.
  • Where does this data come from?Sacramento County building permits on single-family, duplex and townhouse homes in the unincorporated county (the County's Accela permit layer), read October 2026. How the records work in Sacramento County (unincorporated) →

Demolition cost in other cities: Nashville New York City Cleveland Pittsburgh Miami Minneapolis Denver Honolulu Greensboro Cambridge Cary Cape Coral Palo Alto Columbus, OH

Other job costs in Sacramento County (unincorporated): HVAC · Roofing · Electrical & Panel · Water Heater · Remodel, Addition & Repair · New Home · Solar & Battery · Windows & Doors · Plumbing & Sewer · EV Charger · Patio Cover & Accessory Structure · Pool & Spa · ADU