Solar Panel Installation Cost in Sacramento County (unincorporated), CA: what the permits say

How much does solar panel installation cost in Sacramento County? The usual solar & battery job filed with Sacramento County is $25,200, from 1,986 priced permits (October 2023 through September 2026); the middle half of firms file between $14,505 and $32,507. A filed value is what the contractor wrote on the permit, not a quote or the final bill.

$25,200usual filed value
$14,505–$32,507middle half of firms' usual jobs
1,986priced permits (99% of 2,001)
236firms on file
50days, permit issue to final
Sep 2026records through

How much does solar panel installation cost in Sacramento County?

The usual solar & battery job filed with Sacramento County is $25,200, from 1,986 priced permits, October 2023 through September 2026. The middle half of firms usually file between $14,505 and $32,507. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. A solar & battery permit here usually takes 50 days from issue to final inspection. How long permits take →

What the spread looks like

Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 1,986 priced permits across 233 firms, pooled into one. Half of Sacramento County (unincorporated) solar & battery permits were filed between $15,400 and $35,700.

PercentileFiled valueReads as
10th$6,6001 in 10 permits filed below
25th$15,4001 in 4 filed below
50th$26,000the middle permit
75th$35,7001 in 4 filed above
90th$50,0001 in 10 filed above

Busiest firms and what they usually charge

Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.

FirmPermitsLast 12 moUsualMiddle halfFinished
ES Solar LLC496398$28,500$20,000–$34,50086.5%
Ilum Solar239234$29,225$23,323–$38,0655 of 5
Axia Solar Corp9569$33,824$25,639–$41,46381.9%
Nanofy California LLC6161$24,000$22,000–$29,100—
North Valley LLC4540$29,000$29,000–$35,6924 of 5
Aztec Solar Inc8034$15,500$8,398–$28,86789.1%
Gigawatt California LLC3030$47,278$39,490–$53,630—
Haven Energy Services Inc2724$17,000$6,000–$29,250—
Complete Solar Inc dba Sunpower2019$8,138$7,040–$15,373—
ACR Solar International Corp3714$28,311$12,761–$36,86891.3%

Why filed values run low or high

  • The 10 busiest firms usually file $28,500; the 203 firms with fewer than 10 permits usually file $23,742.
  • One permit type covers small and large jobs: 1 in 10 solar & battery permits is filed under $6,600 and 1 in 10 over $50,000, 8 times as much.
  • 99.3% of the 2,001 permits carry a value; the 15 without one are left out of every figure here.

Is your quote normal? Compare it with 1,986 filed values

Line your quote up against the file. In Sacramento County (unincorporated), 1 in 10 solar & battery filed values sit under $6,600, the middle half between $15,400 and $35,700, and 1 in 10 over $50,000.

  • $65,000Above $50,000: higher than 9 in 10 filed values for this work in Sacramento County (unincorporated).
  • $25,200Right at the usual $25,200: in the middle of the file.
  • $4,600Below $6,600: lower than 9 in 10. Ask what the quote leaves out.

When to schedule solar installation in Sacramento County

Sacramento County files the fewest solar & battery permits in February (56 against an average month of 100) and the most in September (216). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Sacramento County →

How these numbers are made

Source: Sacramento County building permits on single-family, duplex and townhouse homes in the unincorporated county (the County's Accela permit layer). The window is October 2023 through September 2026; a permit filed after that isn't here yet.

Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.

The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.

Nobody paid to be on this page and nobody can. How the records work in Sacramento County (unincorporated) →

Common questions

  • How many quotes should I get for a solar & battery job in Sacramento County (unincorporated)?At least three. In the permit record the middle half of Sacramento County (unincorporated) solar & battery firms usually file between $14,505 and $32,507 a job, so two ordinary firms can sit 2.2 times apart and both be normal for Sacramento County (unincorporated). A third quote shows which one is the outlier. Filed values are what contractors wrote on permits, not quotes, so use them to judge the spread, not to price your own job.
  • What range is normal for solar & battery jobs in Sacramento County (unincorporated)?Half of permits were filed between $15,400 and $35,700; 8 in 10 between $6,600 and $50,000. These are approximate, pooled from each firm's own spread.
  • How much do solar installers charge in Sacramento County?The usual solar & battery job is filed at $25,200; the middle half of firms usually file between $14,505 and $32,507. The 10 firms with the most permits in the last 12 months usually file $28,500, more than the usual. See every firm's usual job →
  • Why is this different from the per-watt prices I see online?Online prices are quoted per watt. A filed value is one number for the whole job on one permit, often many watts plus the work around them, and the Sacramento County file does not record how many each job covered, so we can't turn $25,200 into a price per watt.
  • How much is the solar & battery permit fee in Sacramento County?Sacramento County sets permit fees in Sacramento County Code chapter 16.90, Construction Permit Fees (read October 2026). The chapter sets the fee schedule (last amended May 2026); it names no flat fee per trade, so we don't compute one. Ask the permit office for the fee on a job filed at about $25,200, the usual solar & battery value here.
  • How many solar & battery firms work in Sacramento County (unincorporated)?236 firms appear on the file; 124 pulled at least one permit in the last 12 months.
  • Where does this data come from?Sacramento County building permits on single-family, duplex and townhouse homes in the unincorporated county (the County's Accela permit layer), read October 2026. How the records work in Sacramento County (unincorporated) →

Solar & Battery cost in other cities: Orlando New York City Chicago Cleveland Pittsburgh Miami Minneapolis St. Louis Colorado Springs Honolulu Albuquerque Boulder Greensboro Saint Paul Arlington, VA Cambridge Somerville Cary Mesa Cape Coral Provo Palo Alto Denton Seattle San Francisco Medford Anaheim Elk Grove Tyler, TX Marin County (unincorporated) Citrus Heights, CA