Contractor Records
Home › Asheville › Garages, sheds & shade structures

Garage, shed and shade structure permits in Asheville, NC

Data through September 2026 · updated 19 Oct 2026

308 garage, shed and shade structure permits were issued in Asheville, October 2024 through September 2026: about 154 a year and 9% of all permits. 148 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 8% fewer than the 160 in the 12 months before. The busiest month is July. 28806 has the most, 94.

308permits issued
148last 12 months
Julbusiest month
71%finished
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 6Oct2024Nov 2024: 11Dec 2024: 12Jan 2025: 13Jan2025Feb 2025: 13Mar 2025: 16Apr 2025: 9May 2025: 10Jun 2025: 11Jul 2025: 24JulAug 2025: 10Sep 2025: 25Oct 2025: 19Nov 2025: 9Dec 2025: 4Jan 2026: 5Jan2026Feb 2026: 11Mar 2026: 18Apr 2026: 19May 2026: 13Jun 2026: 16Jul 2026: 15JulAug 2026: 12Sep 2026: 7
The same numbers as a table
MonthPermits
Oct 20246
Nov 202411
Dec 202412
Jan 202513
Feb 202513
Mar 202516
Apr 20259
May 202510
Jun 202511
Jul 202524
Aug 202510
Sep 202525
Oct 202519
Nov 20259
Dec 20254
Jan 20265
Feb 202611
Mar 202618
Apr 202619
May 202613
Jun 202616
Jul 202615
Aug 202612
Sep 20267

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (152), December the quietest (62). A busy month at the permit counter usually means a longer wait for a contractor.

January: 70 (100 = an average month)February: 94 (100 = an average month)March: 132 (100 = an average month)April: 109 (100 = an average month)May: 90 (100 = an average month)June: 105 (100 = an average month)July: 152 (100 = an average month)152August: 86 (100 = an average month)September: 125 (100 = an average month)October: 97 (100 = an average month)November: 78 (100 = an average month)December: 62 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January70
February94
March132
April109
May90
June105
July152
August86
September125
October97
November78
December62

Download this table (CSV)

How many garage, shed and shade structure permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025160
Finished70.6%
Expired10.6%

Download this table (CSV)

ZIP codes with the most garage, shed and shade structure permits

Counted at the property's ZIP code. Share is the part of the city's 308 garage, shed and shade structure permits.

ZIP codePermitsShare
288069431%
288037023%
288046822%
288053411%
28801299%
2870483%
2871552%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Res: Deck19864%
Res: Detached Bldg11036%

Download this table (CSV)

How these numbers are made

Source: City of Asheville, Accela Permits View (ArcGIS layer Permits/AccelaPermitsView, layer 2), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Asheville Development Services Department issues inside city limits: new houses, townhomes, duplexes and ADUs, alterations, additions and repairs, re-roofs, trade permits, solar, decks, sheds, retaining walls, pools and demolition. Commercial permits, fire, sign, event, stormwater and right-of-way records in the same file are not counted. Unincorporated Buncombe County, Weaverville, Black Mountain, Woodfin and the other towns issue their own permits and are not in this file.

  • The city's file lists a contractor on most permits, but these pages show permit counts only: there are no contractor lists, rankings or firm pages for Asheville.
  • The file has no issue date, so a permit is dated by the day its application was opened; applications still in review or waiting on the applicant are not counted.
  • The job value column is blank on almost every permit, so we show no costs.
  • Hurricane Helene struck at the end of September 2024, so the first months of the window carry a wave of storm-repair permits.
  • Because permits are dated by application, we don't show how long they take from issue to final: the file can't separate the wait for approval from the work. The finished share comes from the city's status (finaled, certificate of completion or occupancy issued, closed).

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in Asheville, NC", https://contractorrecords.com/asheville/accessory-permits, data through September 2026, from the City of Asheville Development Services Department building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: finished share · Garages, sheds & shade structures permits by ZIP code · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Asheville issue a year?About 154 a year in Asheville: 308 permits issued October 2024 through September 2026, 148 of them in the last 12 months.
  • When do people in Asheville file the most garage, shed and shade structure permits?July (152 against an average month of 100); December is the quietest (62). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most garage, shed and shade structure permits in Asheville?28806, with 94 of the 308 (31%); then 28803 (70).