Which addresses this covers
The City of Asheville Development Services Department permits property inside city limits only. Unincorporated Buncombe County, Weaverville, Black Mountain, Woodfin and the other towns issue their own permits, so an address there will not be in SimpliCity.
| Tool | Search by | What it shows |
|---|---|---|
| SimpliCity permit search | Address or permit number | The permits on a property and their status |
| SimpliCity address search and permits map | Address, or a spot on the map | Permits near a location; the City's records page also lists SimpliCity for zoning and appraised value |
| Accela Permits View (open data) | Any field | The City's Accela permit export, our source |
The City's permit page does not describe a search by contractor name.
How to look up the permits on an Asheville address
- Open simplicity.ashevillenc.gov/permits/search.
- Type the street address, or the permit number from your paperwork.
- Open each permit on the property. Trade work (electrical, plumbing, mechanical, gas piping) is filed as its own permit, so a remodel usually shows several.
- Read the status of each one. Finaled, CC Issued or CO Issued means the City signed it off; Issued means work is still open.
- If the address does not come up, check that it is inside city limits, then call Development Services at (828) 259-5846, the number on the City's permit page.
What the statuses mean
These are the statuses in the City's permit file and how our pages count them:
| Status in the City file | What it means | How we count it |
|---|---|---|
| Finaled, CC Issued, CO Issued, Closed | Signed off: final passed, certificate of completion or occupancy issued, or closed | Finished |
| Issued, Reissued, Active, Pending Inspection, TCO / TCC Issued | Permit live; work under way or not yet finaled | Open |
| Expired | Lapsed before a final | Expired |
| Revoked, Denied, Withdrawn, Void | Did not go ahead | Left out |
Of the home permits opened October 2024 to September 2025, 74.2% had finished, 12.2% were still open and 13.6% had expired by our 19 October 2026 snapshot. One in eight expiring is the number to remember: an Expired permit on work that was done means it never got its final inspection.
When the record is not online
For anything the online tools do not show, the City's public records page says to "visit the Public Records Portal to submit a request" at cityofashevillenc.justfoia.com. It says people "may obtain copies of their public records and public information free or at minimal cost unless otherwise specifically provided by law", and cites G.S. 132-6 for the point that the City does not have to create records that do not already exist (read 24 October 2026). Name the address and the years you want.
What our Asheville pages add
SimpliCity answers "what was permitted at this address". Our Asheville page answers "what gets built here, and how much of it gets signed off", from the City's file, October 2024 to September 2026:
| Kind of work | Permits (Oct 2024–Sep 2026) | Last 12 months (Oct 2025–Sep 2026) |
|---|---|---|
| Remodels and repairs | 887 | 344 |
| Electrical | 388 | 61 |
| New homes | 382 | 151 |
| Additions | 342 | 179 |
| Garages, sheds and shade structures | 308 | 148 |
| HVAC | 282 | 61 |
| Solar | 255 | 112 |
| Roofing | 185 | 34 |
| Plumbing | 172 | 41 |
| Demolition | 136 | 61 |
Hurricane Helene struck at the end of September 2024, so the first months of the window carry a wave of storm-repair permits: 769 in October to December 2024 alone, against 1,797 in all of 2025. Electrical permits fell from 327 to 61 and roofing from 151 to 34 between the two 12-month halves. The permit statistics page has the year, month and season breakdown, permits by ZIP code shows where the work is (28806 led with 949 permits, October 2024 to September 2026), and browse permits lists the rows without owner names or street addresses. To check the license of the firm on a permit, use How to check a contractor's license in North Carolina.
What this does not tell you
The City's file has no issue date, so we date a permit by the day its application was opened, and we do not show time to final. The job value is blank on almost every permit, so we show no costs. The file names a contractor on most permits, but we have not matched those names to state license records, so our pages show counts, not firm rankings.
How we know this
The search options are quoted from the City of Asheville's "look up information about a permit" page and the records process from its Legal Department public records page, both read 24 October 2026. Our counts are the City's Accela Permits View layer, read 19 October 2026: residential permits opened October 2024 to September 2026, inside city limits only.
Numbers come from public permit records in 57 cities, data through October 19, 2026. Nobody paid to be on this page and nobody can.
Questions
- How do I find out if a permit was pulled on my house in Asheville?
Use the City's SimpliCity permit search at simplicity.ashevillenc.gov/permits/search. The City's 'look up information about a permit' page says it lets you look up a permit by address or permit number. Open each permit on the address and read its status.
- Does the City of Asheville handle permits for Buncombe County?
No. The City's Development Services Department permits property inside city limits. Unincorporated Buncombe County, Weaverville, Black Mountain, Woodfin and the other towns issue their own permits, so an address outside the city will not be in the City's search.
- How do I get an old Asheville permit file?
Use the City's Public Records Portal (cityofashevillenc.justfoia.com) for anything the online tools do not show. The City's public records page says copies are free or at minimal cost unless the law says otherwise. Development Services answers permit questions at (828) 259-5846.
- Can I search Asheville permits by contractor?
The City's permit page describes searching by address or permit number, not by contractor. The City's permit file does name a contractor on most permits, but we have not matched those names to North Carolina license records, so we do not rank firms.
- What does CC Issued or CO Issued mean on an Asheville permit?
A certificate of completion (CC) or certificate of occupancy (CO) was issued at the end of the job. We count both, plus Finaled and Closed, as finished. Of the permits opened October 2024 to September 2025, 74.2% had finished by our 19 October 2026 snapshot.
Build your own list
Pick your city and the kind of work. Every firm with a permit on record, sorted by what you value.
Related guides
- Adams County, CO building permit search: the e-Permit Center, statuses and CORA
- Alachua County building permit search: Citizenserve, statuses and old records
- Anaheim building permit search: Anaheim NEXT and the Building Permit Report
- Arlington, VA building permit search: Permit Arlington lookups and FOIA requests
- Baton Rouge building permit search: how to look up permits in East Baton Rouge Parish
- Benton County, WA building permit search: Civic Access, statuses and old records
- Look up information about a permit — City of Asheville (2026-10-24)
- SimpliCity permit search — City of Asheville (2026-10-24)
- Public Records — City of Asheville Legal Department (2026-10-24)
- City of Asheville Public Records Portal (2026-10-24)
- Accela Permits View — City of Asheville GIS (2026-10-19)