Solar permits in Asheville, NC

Data through September 2026 · updated 19 Oct 2026

255 solar permits were issued in Asheville, October 2024 through September 2026: about 128 a year and 7% of all permits. 112 solar permits in the last 12 months (Oct 2025–Sep 2026), 22% fewer than the 143 in the 12 months before. The busiest month is September. 28806 has the most, 74.

255permits issued
112last 12 months
Sepbusiest month
91%finished
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 4Oct2024Nov 2024: 7Dec 2024: 6Jan 2025: 12Jan2025Feb 2025: 8Mar 2025: 9Apr 2025: 11May 2025: 20Jun 2025: 16Jul 2025: 11JulAug 2025: 17Sep 2025: 22Oct 2025: 19Nov 2025: 17Dec 2025: 10Jan 2026: 9Jan2026Feb 2026: 9Mar 2026: 11Apr 2026: 7May 2026: 8Jun 2026: 4Jul 2026: 5JulAug 2026: 6Sep 2026: 7
The same numbers as a table
MonthPermits
Oct 20244
Nov 20247
Dec 20246
Jan 202512
Feb 20258
Mar 20259
Apr 202511
May 202520
Jun 202516
Jul 202511
Aug 202517
Sep 202522
Oct 202519
Nov 202517
Dec 202510
Jan 20269
Feb 20269
Mar 202611
Apr 20267
May 20268
Jun 20264
Jul 20265
Aug 20266
Sep 20267

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (136), July the quietest (75). A busy month at the permit counter usually means a longer wait for a contractor.

January: 99 (100 = an average month)February: 80 (100 = an average month)March: 94 (100 = an average month)April: 85 (100 = an average month)May: 132 (100 = an average month)June: 94 (100 = an average month)July: 75 (100 = an average month)August: 108 (100 = an average month)September: 136 (100 = an average month)136October: 108 (100 = an average month)November: 113 (100 = an average month)December: 75 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January99
February80
March94
April85
May132
June94
July75
August108
September136
October108
November113
December75

Download this table (CSV)

How many solar permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025143
Finished90.9%
Expired2.8%

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the city's 255 solar permits.

ZIP codePermitsShare
288067429%
288046124%
288054016%
288013815%
288033715%
2871531%
287042under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Res: Solar24596%
Res: Electrical83%
Res: Bldg Repair-Replace1under 1%
Res: Alterations1under 1%

Download this table (CSV)

How Asheville compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Asheville, Accela Permits View (ArcGIS layer Permits/AccelaPermitsView, layer 2), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Asheville Development Services Department issues inside city limits: new houses, townhomes, duplexes and ADUs, alterations, additions and repairs, re-roofs, trade permits, solar, decks, sheds, retaining walls, pools and demolition. Commercial permits, fire, sign, event, stormwater and right-of-way records in the same file are not counted. Unincorporated Buncombe County, Weaverville, Black Mountain, Woodfin and the other towns issue their own permits and are not in this file.

  • The city's file lists a contractor on most permits, but these pages show permit counts only: there are no contractor lists, rankings or firm pages for Asheville.
  • The file has no issue date, so a permit is dated by the day its application was opened; applications still in review or waiting on the applicant are not counted.
  • The job value column is blank on almost every permit, so we show no costs.
  • Hurricane Helene struck at the end of September 2024, so the first months of the window carry a wave of storm-repair permits.
  • Because permits are dated by application, we don't show how long they take from issue to final: the file can't separate the wait for approval from the work. The finished share comes from the city's status (finaled, certificate of completion or occupancy issued, closed).

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in Asheville, NC", https://contractorrecords.com/asheville/solar-permits, data through September 2026, from the City of Asheville Development Services Department building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: finished share · Solar permits by ZIP code · Solar permits by permit type.

Common questions

  • How many solar permits does Asheville issue a year?About 128 a year in Asheville: 255 permits issued October 2024 through September 2026, 112 of them in the last 12 months.
  • When do people in Asheville file the most solar permits?September (136 against an average month of 100); July is the quietest (75). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Asheville?28806, with 74 of the 255 (29%); then 28804 (61).