Contractor Records
Home › Asheville › Remodels & repairs

Remodel and repair permits in Asheville, NC

Data through September 2026 · updated 19 Oct 2026

887 remodel and repair permits were issued in Asheville, October 2024 through September 2026: about 444 a year and 25% of all permits. 344 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 37% fewer than the 543 in the 12 months before. The busiest month is January. 28804 has the most, 237.

887permits issued
344last 12 months
Janbusiest month
74%finished
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 49Oct2024Nov 2024: 60Dec 2024: 47Jan 2025: 57Jan2025Feb 2025: 44Mar 2025: 33Apr 2025: 49May 2025: 46Jun 2025: 36Jul 2025: 40JulAug 2025: 41Sep 2025: 41Oct 2025: 22Nov 2025: 22Dec 2025: 27Jan 2026: 30Jan2026Feb 2026: 28Mar 2026: 35Apr 2026: 27May 2026: 32Jun 2026: 25Jul 2026: 34JulAug 2026: 28Sep 2026: 34
The same numbers as a table
MonthPermits
Oct 202449
Nov 202460
Dec 202447
Jan 202557
Feb 202544
Mar 202533
Apr 202549
May 202546
Jun 202536
Jul 202540
Aug 202541
Sep 202541
Oct 202522
Nov 202522
Dec 202527
Jan 202630
Feb 202628
Mar 202635
Apr 202627
May 202632
Jun 202625
Jul 202634
Aug 202628
Sep 202634

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). January is the busiest (118), June the quietest (83). A busy month at the permit counter usually means a longer wait for a contractor.

January: 118 (100 = an average month)118February: 97 (100 = an average month)March: 92 (100 = an average month)April: 103 (100 = an average month)May: 106 (100 = an average month)June: 83 (100 = an average month)July: 100 (100 = an average month)August: 93 (100 = an average month)September: 101 (100 = an average month)October: 96 (100 = an average month)November: 111 (100 = an average month)December: 100 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January118
February97
March92
April103
May106
June83
July100
August93
September101
October96
November111
December100

Download this table (CSV)

How many remodel and repair permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025543
Finished73.7%
Expired9.8%

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 887 remodel and repair permits.

ZIP codePermitsShare
2880423727%
2880619122%
2880318721%
2880112814%
2880511613%
28715142%
28704142%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Res: Alterations70279%
Res: Bldg Repair-Replace18521%

Download this table (CSV)

How Asheville compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Asheville, Accela Permits View (ArcGIS layer Permits/AccelaPermitsView, layer 2), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Asheville Development Services Department issues inside city limits: new houses, townhomes, duplexes and ADUs, alterations, additions and repairs, re-roofs, trade permits, solar, decks, sheds, retaining walls, pools and demolition. Commercial permits, fire, sign, event, stormwater and right-of-way records in the same file are not counted. Unincorporated Buncombe County, Weaverville, Black Mountain, Woodfin and the other towns issue their own permits and are not in this file.

  • The city's file lists a contractor on most permits, but these pages show permit counts only: there are no contractor lists, rankings or firm pages for Asheville.
  • The file has no issue date, so a permit is dated by the day its application was opened; applications still in review or waiting on the applicant are not counted.
  • The job value column is blank on almost every permit, so we show no costs.
  • Hurricane Helene struck at the end of September 2024, so the first months of the window carry a wave of storm-repair permits.
  • Because permits are dated by application, we don't show how long they take from issue to final: the file can't separate the wait for approval from the work. The finished share comes from the city's status (finaled, certificate of completion or occupancy issued, closed).

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Asheville, NC", https://contractorrecords.com/asheville/remodel-permits, data through September 2026, from the City of Asheville Development Services Department building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: finished share · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Asheville issue a year?About 444 a year in Asheville: 887 permits issued October 2024 through September 2026, 344 of them in the last 12 months.
  • When do people in Asheville file the most remodel and repair permits?January (118 against an average month of 100); June is the quietest (83). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Asheville?28804, with 237 of the 887 (27%); then 28806 (191).