Data through September 2026 · updated 19 Oct 2026
382 new home permits were issued in Asheville, October 2024 through September 2026: about 191 a year and 11% of all permits. 151 new home permits in the last 12 months (Oct 2025–Sep 2026), 35% fewer than the 231 in the 12 months before. The busiest month is May. 28806 has the most, 171.
Permits issued each month, October 2024 through September 2026.
| Month | Permits |
|---|---|
| Oct 2024 | 7 |
| Nov 2024 | 19 |
| Dec 2024 | 23 |
| Jan 2025 | 25 |
| Feb 2025 | 20 |
| Mar 2025 | 12 |
| Apr 2025 | 26 |
| May 2025 | 33 |
| Jun 2025 | 25 |
| Jul 2025 | 5 |
| Aug 2025 | 9 |
| Sep 2025 | 27 |
| Oct 2025 | 21 |
| Nov 2025 | 13 |
| Dec 2025 | 5 |
| Jan 2026 | 16 |
| Feb 2026 | 13 |
| Mar 2026 | 15 |
| Apr 2026 | 16 |
| May 2026 | 11 |
| Jun 2026 | 17 |
| Jul 2026 | 11 |
| Aug 2026 | 7 |
| Sep 2026 | 6 |
By calendar month, 100 = an average month (the thin line). May is the busiest (138), July the quietest (50). A busy month at the permit counter usually means a longer wait for a contractor.
| Month | Index |
|---|---|
| January | 129 |
| February | 104 |
| March | 85 |
| April | 132 |
| May | 138 |
| June | 132 |
| July | 50 |
| August | 50 |
| September | 104 |
| October | 88 |
| November | 101 |
| December | 88 |
Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.
| Measure | Value |
|---|---|
| Permits issued Oct 2024–Sep 2025 | 231 |
| Finished | 74.5% |
| Expired | 0.4% |
Counted at the property's ZIP code. Share is the part of the city's 382 new home permits.
How the city filed these permits. We group its types into kinds of work; this is the split.
| Permit type | Permits | Share |
|---|---|---|
| Res: New SFD | 153 | 40% |
| Res: SFD Waiver | 108 | 28% |
| Res: Duplex | 46 | 12% |
| Mfg. Home in Park | 38 | 10% |
| Res: Townhome | 37 | 10% |
Remodels & repairs (887)Electrical (388)Additions (342)Garages, sheds & shade structures (308)HVAC (282)Solar (255)
From our cross-city data studies: the same measure, read the same way, for every city we cover.
Source: City of Asheville, Accela Permits View (ArcGIS layer Permits/AccelaPermitsView, layer 2), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.
Residential permits the City of Asheville Development Services Department issues inside city limits: new houses, townhomes, duplexes and ADUs, alterations, additions and repairs, re-roofs, trade permits, solar, decks, sheds, retaining walls, pools and demolition. Commercial permits, fire, sign, event, stormwater and right-of-way records in the same file are not counted. Unincorporated Buncombe County, Weaverville, Black Mountain, Woodfin and the other towns issue their own permits and are not in this file.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "New home permits in Asheville, NC", https://contractorrecords.com/asheville/new-home-permits, data through September 2026, from the City of Asheville Development Services Department building-permit records.Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.
Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: finished share · New homes permits by ZIP code · New homes permits by permit type.