HVAC permits in Asheville, NC

Data through September 2026 · updated 19 Oct 2026

282 HVAC permits were issued in Asheville, October 2024 through September 2026: about 141 a year and 8% of all permits. 61 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 72% fewer than the 221 in the 12 months before. The busiest month is October. 28806 has the most, 81.

282permits issued
61last 12 months
Octbusiest month
69%finished
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 78Oct2024Nov 2024: 25Dec 2024: 19Jan 2025: 39Jan2025Feb 2025: 9Mar 2025: 7Apr 2025: 13May 2025: 8Jun 2025: 9Jul 2025: 4JulAug 2025: 5Sep 2025: 5Oct 2025: 9Nov 2025: 8Dec 2025: 4Jan 2026: 4Jan2026Feb 2026: 5Mar 2026: 4Apr 2026: 9May 2026: 3Jun 2026: 2Jul 2026: 6JulAug 2026: 3Sep 2026: 4
The same numbers as a table
MonthPermits
Oct 202478
Nov 202425
Dec 202419
Jan 202539
Feb 20259
Mar 20257
Apr 202513
May 20258
Jun 20259
Jul 20254
Aug 20255
Sep 20255
Oct 20259
Nov 20258
Dec 20254
Jan 20264
Feb 20265
Mar 20264
Apr 20269
May 20263
Jun 20262
Jul 20266
Aug 20263
Sep 20264

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (370), August the quietest (34). A busy month at the permit counter usually means a longer wait for a contractor.

January: 183 (100 = an average month)February: 60 (100 = an average month)March: 47 (100 = an average month)April: 94 (100 = an average month)May: 47 (100 = an average month)June: 47 (100 = an average month)July: 43 (100 = an average month)August: 34 (100 = an average month)September: 38 (100 = an average month)October: 370 (100 = an average month)370November: 140 (100 = an average month)December: 98 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January183
February60
March47
April94
May47
June47
July43
August34
September38
October370
November140
December98

Download this table (CSV)

How many HVAC permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025221
Finished68.8%
Expired29.4%

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 282 HVAC permits.

ZIP codePermitsShare
288068129%
288046021%
288035218%
288014416%
288053211%
2871572%
2870462%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Res: Multi-Trade Heating26694%
Res: Mechanical166%

Download this table (CSV)

How Asheville compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Asheville, Accela Permits View (ArcGIS layer Permits/AccelaPermitsView, layer 2), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Asheville Development Services Department issues inside city limits: new houses, townhomes, duplexes and ADUs, alterations, additions and repairs, re-roofs, trade permits, solar, decks, sheds, retaining walls, pools and demolition. Commercial permits, fire, sign, event, stormwater and right-of-way records in the same file are not counted. Unincorporated Buncombe County, Weaverville, Black Mountain, Woodfin and the other towns issue their own permits and are not in this file.

  • The city's file lists a contractor on most permits, but these pages show permit counts only: there are no contractor lists, rankings or firm pages for Asheville.
  • The file has no issue date, so a permit is dated by the day its application was opened; applications still in review or waiting on the applicant are not counted.
  • The job value column is blank on almost every permit, so we show no costs.
  • Hurricane Helene struck at the end of September 2024, so the first months of the window carry a wave of storm-repair permits.
  • Because permits are dated by application, we don't show how long they take from issue to final: the file can't separate the wait for approval from the work. The finished share comes from the city's status (finaled, certificate of completion or occupancy issued, closed).

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in Asheville, NC", https://contractorrecords.com/asheville/hvac-permits, data through September 2026, from the City of Asheville Development Services Department building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: finished share · HVAC permits by ZIP code · HVAC permits by permit type.

Common questions

  • How many HVAC permits does Asheville issue a year?About 141 a year in Asheville: 282 permits issued October 2024 through September 2026, 61 of them in the last 12 months.
  • When do people in Asheville file the most HVAC permits?October (370 against an average month of 100); August is the quietest (34). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Asheville?28806, with 81 of the 282 (29%); then 28804 (60).