Data through September 2026 · updated 19 Oct 2026
388 electrical permits were issued in Asheville, October 2024 through September 2026: about 194 a year and 11% of all permits. 61 electrical permits in the last 12 months (Oct 2025–Sep 2026), 81% fewer than the 327 in the 12 months before. The busiest month is October. 28804 has the most, 100.
Permits issued each month, October 2024 through September 2026.
| Month | Permits |
|---|---|
| Oct 2024 | 145 |
| Nov 2024 | 32 |
| Dec 2024 | 24 |
| Jan 2025 | 52 |
| Feb 2025 | 16 |
| Mar 2025 | 4 |
| Apr 2025 | 11 |
| May 2025 | 15 |
| Jun 2025 | 10 |
| Jul 2025 | 7 |
| Aug 2025 | 4 |
| Sep 2025 | 7 |
| Oct 2025 | 13 |
| Nov 2025 | 5 |
| Dec 2025 | 7 |
| Jan 2026 | 7 |
| Feb 2026 | 3 |
| Mar 2026 | 5 |
| Apr 2026 | 5 |
| May 2026 | 3 |
| Jun 2026 | 6 |
| Jul 2026 | 2 |
| Aug 2026 | 3 |
| Sep 2026 | 2 |
By calendar month, 100 = an average month (the thin line). October is the busiest (489), August the quietest (22). A busy month at the permit counter usually means a longer wait for a contractor.
| Month | Index |
|---|---|
| January | 182 |
| February | 59 |
| March | 28 |
| April | 49 |
| May | 56 |
| June | 49 |
| July | 28 |
| August | 22 |
| September | 28 |
| October | 489 |
| November | 114 |
| December | 96 |
Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.
| Measure | Value |
|---|---|
| Permits issued Oct 2024–Sep 2025 | 327 |
| Finished | 83.2% |
| Expired | 16.8% |
Counted at the property's ZIP code. Share is the part of the city's 388 electrical permits.
How the city filed these permits. We group its types into kinds of work; this is the split.
| Permit type | Permits | Share |
|---|---|---|
| Res: Electrical | 316 | 81% |
| Res: Multi-Trade Heating | 72 | 19% |
Remodels & repairs (887)New homes (382)Additions (342)Garages, sheds & shade structures (308)HVAC (282)Solar (255)
From our cross-city data studies: the same measure, read the same way, for every city we cover.
Source: City of Asheville, Accela Permits View (ArcGIS layer Permits/AccelaPermitsView, layer 2), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.
Residential permits the City of Asheville Development Services Department issues inside city limits: new houses, townhomes, duplexes and ADUs, alterations, additions and repairs, re-roofs, trade permits, solar, decks, sheds, retaining walls, pools and demolition. Commercial permits, fire, sign, event, stormwater and right-of-way records in the same file are not counted. Unincorporated Buncombe County, Weaverville, Black Mountain, Woodfin and the other towns issue their own permits and are not in this file.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "Electrical permits in Asheville, NC", https://contractorrecords.com/asheville/electrical-permits, data through September 2026, from the City of Asheville Development Services Department building-permit records.Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.
Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: finished share · Electrical permits by ZIP code · Electrical permits by permit type.