Contractor Records
Home › Asheville › Additions

Home addition permits in Asheville, NC

Data through September 2026 · updated 19 Oct 2026

342 home addition permits were issued in Asheville, October 2024 through September 2026: about 171 a year and 10% of all permits. 179 home addition permits in the last 12 months (Oct 2025–Sep 2026), 10% more than the 163 in the 12 months before. The busiest month is June. 28806 has the most, 92.

342permits issued
179last 12 months
Junbusiest month
77%finished
Sep 2026records through

Home addition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 6Oct2024Nov 2024: 13Dec 2024: 12Jan 2025: 11Jan2025Feb 2025: 9Mar 2025: 17Apr 2025: 17May 2025: 12Jun 2025: 23Jul 2025: 18JulAug 2025: 9Sep 2025: 16Oct 2025: 19Nov 2025: 10Dec 2025: 16Jan 2026: 18Jan2026Feb 2026: 12Mar 2026: 9Apr 2026: 14May 2026: 18Jun 2026: 21Jul 2026: 17JulAug 2026: 11Sep 2026: 14
The same numbers as a table
MonthPermits
Oct 20246
Nov 202413
Dec 202412
Jan 202511
Feb 20259
Mar 202517
Apr 202517
May 202512
Jun 202523
Jul 202518
Aug 20259
Sep 202516
Oct 202519
Nov 202510
Dec 202516
Jan 202618
Feb 202612
Mar 20269
Apr 202614
May 202618
Jun 202621
Jul 202617
Aug 202611
Sep 202614

Download this table (CSV)

When home addition permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (154), August the quietest (70). A busy month at the permit counter usually means a longer wait for a contractor.

January: 102 (100 = an average month)February: 74 (100 = an average month)March: 91 (100 = an average month)April: 109 (100 = an average month)May: 105 (100 = an average month)June: 154 (100 = an average month)154July: 123 (100 = an average month)August: 70 (100 = an average month)September: 105 (100 = an average month)October: 88 (100 = an average month)November: 81 (100 = an average month)December: 98 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January102
February74
March91
April109
May105
June154
July123
August70
September105
October88
November81
December98

Download this table (CSV)

How many home addition permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025163
Finished76.7%
Expired6.7%

Download this table (CSV)

ZIP codes with the most home addition permits

Counted at the property's ZIP code. Share is the part of the city's 342 home addition permits.

ZIP codePermitsShare
288069227%
288049026%
288035416%
288015215%
288054814%
287153under 1%
287043under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Res: Alter & Add19457%
Res:Addition11333%
Res: Alterations329%
Res: Bldg Repair-Replace3under 1%

Download this table (CSV)

How these numbers are made

Source: City of Asheville, Accela Permits View (ArcGIS layer Permits/AccelaPermitsView, layer 2), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Asheville Development Services Department issues inside city limits: new houses, townhomes, duplexes and ADUs, alterations, additions and repairs, re-roofs, trade permits, solar, decks, sheds, retaining walls, pools and demolition. Commercial permits, fire, sign, event, stormwater and right-of-way records in the same file are not counted. Unincorporated Buncombe County, Weaverville, Black Mountain, Woodfin and the other towns issue their own permits and are not in this file.

  • The city's file lists a contractor on most permits, but these pages show permit counts only: there are no contractor lists, rankings or firm pages for Asheville.
  • The file has no issue date, so a permit is dated by the day its application was opened; applications still in review or waiting on the applicant are not counted.
  • The job value column is blank on almost every permit, so we show no costs.
  • Hurricane Helene struck at the end of September 2024, so the first months of the window carry a wave of storm-repair permits.
  • Because permits are dated by application, we don't show how long they take from issue to final: the file can't separate the wait for approval from the work. The finished share comes from the city's status (finaled, certificate of completion or occupancy issued, closed).

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Home addition permits in Asheville, NC", https://contractorrecords.com/asheville/addition-permits, data through September 2026, from the City of Asheville Development Services Department building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.

Download the tables (CSV): Additions permits by month · Additions permits by calendar month (index) · Additions permits: finished share · Additions permits by ZIP code · Additions permits by permit type.

Common questions

  • How many home addition permits does Asheville issue a year?About 171 a year in Asheville: 342 permits issued October 2024 through September 2026, 179 of them in the last 12 months.
  • When do people in Asheville file the most home addition permits?June (154 against an average month of 100); August is the quietest (70). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most home addition permits in Asheville?28806, with 92 of the 342 (27%); then 28804 (90).