How much does EV charger installation cost in Burlington, VT? The usual EV charger job filed with Burlington, VT is $1,600, from 268 priced permits (April 2023 through March 2026); the middle half of firms file between $1,000 and $2,250. A filed value is what the contractor wrote on the permit, not a quote or the final bill.
The usual EV charger job filed with Burlington, VT is $1,600, from 268 priced permits, April 2023 through March 2026. The middle half of firms usually file between $1,000 and $2,250. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. An EV charger permit here usually takes 49 days from issue to final inspection. How long permits take →
Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 268 priced permits across 56 firms, pooled into one. Half of Burlington, VT EV charger permits were filed between $1,100 and $3,000.
| Percentile | Filed value | Reads as |
|---|---|---|
| 10th | $830 | 1 in 10 permits filed below |
| 25th | $1,100 | 1 in 4 filed below |
| 50th | $1,800 | the middle permit |
| 75th | $3,000 | 1 in 4 filed above |
| 90th | $4,600 | 1 in 10 filed above |
Firms split into thirds by the usual value of the homes they work on, with each third's usual filed value weighted by permits. Home values: City of Burlington 2026 assessed values.
| Firms working on | Usual home value | Usual filed value | Firms | Permits |
|---|---|---|---|---|
| Lower third | under $418,000 | $2,750 | 18 | 87 |
| Middle third | $418,000–$516,400 | $1,500 | 18 | 129 |
| Upper third | $517,600 and up | $1,800 | 18 | 50 |
Top 10 by permits in the last 12 months on file (Apr 2025–Mar 2026). Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.
| Firm | Permits | Last 12 mo | Usual | Middle half | Finished |
|---|---|---|---|---|---|
| New England Electric | 39 | 19 | $1,800 | $1,600–$2,000 | 85.6% |
| Lakeside Electric Inc | 56 | 8 | $2,750 | $1,150–$3,799 | 81.9% |
| Current Electric | 22 | 8 | $1,000 | $900–$1,200 | 67.4% |
| Village Voltage | 7 | 7 | $1,200 | $905–$5,445 | — |
| Cummings Electric | 12 | 6 | $1,000 | $975–$1,277 | 5 of 6 |
| Kiehl Electric | 12 | 3 | $1,000 | $825–$3,375 | 9 of 9 |
| Provost Son and Daughters Electric | 7 | 3 | $2,000 | $1,650–$4,000 | — |
| Michael Myers Electric LLC | 6 | 3 | $2,250 | $1,850–$2,875 | 2 of 5 |
| Jacob Kirchner, Electrician | 10 | 2 | $1,225 | $975–$2,650 | 6 of 8 |
| Rylas Electric | 9 | 2 | $1,600 | $800–$3,500 | 1 of 7 |
Line your quote up against the file. In Burlington, VT, 1 in 10 EV charger filed values sit under $830, the middle half between $1,100 and $3,000, and 1 in 10 over $4,600.
Burlington, VT files the fewest EV charger permits in June (63 against an average month of 100) and the most in September (148). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Burlington, VT →
Source: City of Burlington permits on 1–4 family homes, condos and mobile homes (the city's OpenGov permit feed). The window is April 2023 through March 2026; a permit filed after that isn't here yet.
Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.
The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.
Nobody paid to be on this page and nobody can. How the records work in Burlington, VT →
EV Charger cost in other cities: Cary Naperville Elk Grove Marin County (unincorporated) Sacramento County (unincorporated)
Other job costs in Burlington, VT: Electrical · Heat Pump · Remodel & Repair · Windows & Doors · Roofing & Siding · Deck & Porch