Contractor Records
Home › Columbia

Columbia, MO building permits

Data through September 2026 · updated 19 Oct 2026

6,252 building permits were issued in Columbia from October 2024 to September 2026, about 3,126 a year. HVAC permits lead with 1,759, then electrical (1,016) and roofing (968). 72% were for homes. The city's file doesn't name contractors, so we can't rank, compare or profile firms here: these pages show what was built, where, when and how fast the city signed it off.

6,252permits issued
3,126a year
72%for homes
56%finished (Oct 2024–Sep 2025 permits)
22days, usual issue to final
Sep 2026records through

What gets built here

What this page can and can't show

  • ✓Permits the city issued, by kind of work, month and ZIP code.
  • ✓How long a permit takes from issue to the city's final inspection.
  • ✓Which permits finished, are still open or expired.
  • ✓What the job was declared at on the permit.
  • Who did the work. The city's file doesn't name contractors, so we can't rank, compare or profile firms here.
  • Street addresses or owners. We publish counts and permit rows without them.

Building and trade permits the City of Columbia issues inside city limits for homes and other non-commercial work: new houses, duplexes and townhouses, home alterations and additions, re-roofs, heating and cooling, electrical, plumbing and gas, residential solar, decks and foundation repair. Commercial building permits, right-of-way and utility permits, fire systems, signs and grading in the same file are not counted, and neither is unincorporated Boone County, which issues its own permits.

Permits by kind of work

Permits issued October 2024 through September 2026, every kind of work with 100 or more. Last 12 months is Oct 2025–Sep 2026. Homes is the share issued as residential permits.

Kind of workPermitsShareLast 12 mo
HVAC1,75928%899
Electrical1,01616%516
Roofing96815%616
New homes74312%364
Remodels & repairs60510%320
Plumbing5359%276
Solar2474%90
Garages, sheds & shade structures1573%91
Additions1172%59

Fewer than 100 permits, so no row: demolition (38), pools & spas (28), ADUs & casitas (16), fences & walls (11), other (12).

Download this table (CSV)

Guides for Columbia

Local permit rules and lookups, each with Columbia's own permit numbers.

How these numbers are made

Source: City of Columbia GIS, Building Permit Application Status (ArcGIS layer behind the city's Development Permits Viewer), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Columbia issues inside city limits for homes and other non-commercial work: new houses, duplexes and townhouses, home alterations and additions, re-roofs, heating and cooling, electrical, plumbing and gas, residential solar, decks and foundation repair. Commercial building permits, right-of-way and utility permits, fire systems, signs and grading in the same file are not counted, and neither is unincorporated Boone County, which issues its own permits.

  • The city's file names no contractor on permits issued since its 2018 system change, so there are no contractor lists, rankings or firm pages for Columbia.
  • The city doesn't split trade and re-roof permits into homes and businesses; we count one as a home permit when the lot is zoned for one- or two-family homes or manufactured homes, or the permit's description names a house.
  • A new house gets separate electrical, mechanical and plumbing sub-permits, so one project can count several times, once under each kind of work.
  • The value is the valuation on the permit; many trade permits carry none.
  • A final date is the city's finaled date. Trade sub-permits under a building permit add no days, because the file dates most of them on the day they closed; permits that expired carry no final date even where the file shows one.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Columbia, MO building permits", https://contractorrecords.com/columbia-mo/, data through September 2026, from the City of Columbia Community Development Department building-permit records.

Link to a table: By kind of work · Browse the permits · Permits each month.

Download the tables (CSV): Permits by kind of work · Permits in the last 12 months.

Common questions

  • How many building permits does Columbia issue a year?About 3,126 a year in Columbia: 6,252 permits issued October 2024 through September 2026, 3,296 of them in the last 12 months. That counts the permits the city issued, homes and commercial, not denied or withdrawn applications.
  • Can I find a contractor's permits in Columbia?Not from this file: the city publishes its permits without the contractor's name, so we can't list or rank firms. Ask the contractor for the permit number of a past job.
  • What do people build most in Columbia?HVAC: 1,759 of the 6,252 permits (28%), then electrical (1,016), roofing (968), October 2024 through September 2026.
  • How long does a building permit take in Columbia?The usual permit took 22 days from issue to the city's final (middle half: 6 to 188 days), from 1,239 permits issued Oct 2024–Sep 2025 that reached a final. Each kind of work →
  • How do I look up a building permit in Columbia?Filter the permit list on this page by month, kind of work and ZIP code to see what was issued. For one property's permits, search the city's own records by address or permit number; we don't publish addresses. How to look up a permit in Columbia →
  • How many permits were issued in Columbia last month?241 in September 2026, the last full month on file; 3,296 over the last 12 months.

Browse the permits

Browse 6,252 permits

Every permit in the file issued October 2024 through September 2026, newest first. Pick a month, a kind of work, a ZIP code or a status. Each row is one permit: no street address, no names.

The list loads as you reach it (6,252 permits).

IssuedKind of workCity permit typeStatusZIP

Permits each month, the last 12 months

Permits issued each month and the kind of work with the most. A month opens its permits in the list above.

MonthPermitsTop kind of work
Sep 2026241HVAC (63)
Aug 2026297HVAC (68)
Jul 2026329HVAC (102)
Jun 2026331HVAC (103)
May 2026290HVAC (82)
Apr 2026300HVAC (95)
Mar 2026326Roofing (78)
Feb 2026250Roofing (55)
Jan 2026204HVAC (66)
Dec 2025232HVAC (63)
Nov 2025225HVAC (67)
Oct 2025271HVAC (70)

Download this table (CSV)