Plumbing permits in Corona, CA

Data through September 2026 · updated 23 Oct 2026

1,252 plumbing permits were issued in Corona, October 2024 through September 2026: about 626 a year and 16% of all permits. 636 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 3% more than the 616 in the 12 months before. The busiest month is February. The usual one took 16 days from issue to the city's final. 92882 has the most, 427.

1,252permits issued
636last 12 months
Febbusiest month
16days, usual issue to final
81%finished
$3,000usual declared value
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 60Oct2024Nov 2024: 86Dec 2024: 44Jan 2025: 66Jan2025Feb 2025: 50Mar 2025: 47Apr 2025: 48May 2025: 42Jun 2025: 45Jul 2025: 43JulAug 2025: 41Sep 2025: 44Oct 2025: 42Nov 2025: 35Dec 2025: 53Jan 2026: 61Jan2026Feb 2026: 79Mar 2026: 76Apr 2026: 53May 2026: 31Jun 2026: 76Jul 2026: 48JulAug 2026: 36Sep 2026: 46
The same numbers as a table
MonthPermits
Oct 202460
Nov 202486
Dec 202444
Jan 202566
Feb 202550
Mar 202547
Apr 202548
May 202542
Jun 202545
Jul 202543
Aug 202541
Sep 202544
Oct 202542
Nov 202535
Dec 202553
Jan 202661
Feb 202679
Mar 202676
Apr 202653
May 202631
Jun 202676
Jul 202648
Aug 202636
Sep 202646

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). February is the busiest (124), May the quietest (70). A busy month at the permit counter usually means a longer wait for a contractor.

January: 122 (100 = an average month)February: 124 (100 = an average month)124March: 118 (100 = an average month)April: 97 (100 = an average month)May: 70 (100 = an average month)June: 116 (100 = an average month)July: 87 (100 = an average month)August: 74 (100 = an average month)September: 86 (100 = an average month)October: 98 (100 = an average month)November: 116 (100 = an average month)December: 93 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January122
February124
March118
April97
May70
June116
July87
August74
September86
October98
November116
December93

Download this table (CSV)

How long a plumbing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 497 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025616
Finished81.2%
Usual days, issue to final16
Middle half, days8–41

Download this table (CSV)

What a plumbing permit is declared at

The value written on the permit at application, from 192 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$3,000
Middle half$2,000–$3,200

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the city's 1,252 plumbing permits.

ZIP codePermitsShare
9288242734%
9287935829%
9288128022%
92883847%
92880696%
928605under 1%
928783under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Plumbing98979%
Water Heater Same Location26321%

Download this table (CSV)

How Corona compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in Los Angeles and the Inland Empire. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: CorStat (City of Corona open data), Building Permits dataset 2agx-camz, read 23 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical, solar, re-roof, fence, pool and fire-sprinkler permits the City of Corona Building Division issues inside city limits. Unincorporated neighbors such as Temescal Valley, El Cerrito, Home Gardens and Coronita get their permits from Riverside County and are not in this file (they are on the Riverside County pages). Public-works encroachment and utility permits and planning or fire-prevention reviews are not counted.

  • The city's permit file names no contractor, so there are no contractor lists, rankings or firm pages for Corona.
  • The job value is filled on about half of permits: almost always on re-roofs, fences, home additions, ADUs, new homes and commercial work, but most electrical, solar, HVAC and plumbing permits carry $0, which we treat as no value.
  • Solar counts both the city's standard solar permits and those issued through its automated online solar review (listed in the file as Symbium Solar); many include battery storage.
  • A final date is the city's finaled date. A permit marked with a certificate of occupancy counts as finished. Water-heater replacements count as plumbing; fire sprinklers, alarms and signs count as other.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in Corona, CA", https://contractorrecords.com/corona/plumbing-permits, data through September 2026, from City of Corona Building Division building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits: declared value · Plumbing permits by ZIP code · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Corona issue a year?About 626 a year in Corona: 1,252 permits issued October 2024 through September 2026, 636 of them in the last 12 months.
  • How long does a plumbing permit take in Corona?The usual one took 16 days from issue to the city's final inspection, and the middle half took 8 to 41 days (497 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Corona file the most plumbing permits?February (124 against an average month of 100); May is the quietest (70). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in Corona?92882, with 427 of the 1,252 (34%); then 92879 (358).