Fence and wall permits in Corona, CA

Data through September 2026 · updated 23 Oct 2026

474 fence and wall permits were issued in Corona, October 2024 through September 2026: about 237 a year and 6% of all permits. 155 fence and wall permits in the last 12 months (Oct 2025–Sep 2026), 51% fewer than the 319 in the 12 months before. The busiest month is August. The usual one took 120 days from issue to the city's final. 92883 has the most, 177.

474permits issued
155last 12 months
Augbusiest month
120days, usual issue to final
79%finished
$2,769usual declared value
Sep 2026records through

Fence and wall permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 10Oct2024Nov 2024: 23Dec 2024: 16Jan 2025: 9Jan2025Feb 2025: 13Mar 2025: 61Apr 2025: 39May 2025: 30Jun 2025: 32Jul 2025: 41JulAug 2025: 34Sep 2025: 11Oct 2025: 12Nov 2025: 9Dec 2025: 5Jan 2026: 7Jan2026Feb 2026: 5Mar 2026: 12Apr 2026: 12May 2026: 14Jun 2026: 22Jul 2026: 7JulAug 2026: 42Sep 2026: 8
The same numbers as a table
MonthPermits
Oct 202410
Nov 202423
Dec 202416
Jan 20259
Feb 202513
Mar 202561
Apr 202539
May 202530
Jun 202532
Jul 202541
Aug 202534
Sep 202511
Oct 202512
Nov 20259
Dec 20255
Jan 20267
Feb 20265
Mar 202612
Apr 202612
May 202614
Jun 202622
Jul 20267
Aug 202642
Sep 20268

Download this table (CSV)

When fence and wall permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (192), January the quietest (41). A busy month at the permit counter usually means a longer wait for a contractor.

January: 41 (100 = an average month)February: 46 (100 = an average month)March: 185 (100 = an average month)April: 129 (100 = an average month)May: 111 (100 = an average month)June: 137 (100 = an average month)July: 122 (100 = an average month)August: 192 (100 = an average month)192September: 48 (100 = an average month)October: 56 (100 = an average month)November: 81 (100 = an average month)December: 53 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January41
February46
March185
April129
May111
June137
July122
August192
September48
October56
November81
December53

Download this table (CSV)

How long a fence and wall permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 251 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025319
Finished78.7%
Usual days, issue to final120
Middle half, days75–219

Download this table (CSV)

What a fence and wall permit is declared at

The value written on the permit at application, from 469 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$2,769
Middle half$1,092–$5,733

Download this table (CSV)

ZIP codes with the most fence and wall permits

Counted at the property's ZIP code. Share is the part of the city's 474 fence and wall permits.

ZIP codePermitsShare
9288317737%
928817716%
928827115%
92879388%
92880133%

Download this table (CSV)

Nearby permit data

Fence and wall permits for other places in Los Angeles and the Inland Empire. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: CorStat (City of Corona open data), Building Permits dataset 2agx-camz, read 23 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical, solar, re-roof, fence, pool and fire-sprinkler permits the City of Corona Building Division issues inside city limits. Unincorporated neighbors such as Temescal Valley, El Cerrito, Home Gardens and Coronita get their permits from Riverside County and are not in this file (they are on the Riverside County pages). Public-works encroachment and utility permits and planning or fire-prevention reviews are not counted.

  • The city's permit file names no contractor, so there are no contractor lists, rankings or firm pages for Corona.
  • The job value is filled on about half of permits: almost always on re-roofs, fences, home additions, ADUs, new homes and commercial work, but most electrical, solar, HVAC and plumbing permits carry $0, which we treat as no value.
  • Solar counts both the city's standard solar permits and those issued through its automated online solar review (listed in the file as Symbium Solar); many include battery storage.
  • A final date is the city's finaled date. A permit marked with a certificate of occupancy counts as finished. Water-heater replacements count as plumbing; fire sprinklers, alarms and signs count as other.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Fence and wall permits in Corona, CA", https://contractorrecords.com/corona/fence-permits, data through September 2026, from City of Corona Building Division building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code.

Download the tables (CSV): Fences & walls permits by month · Fences & walls permits by calendar month (index) · Fences & walls permits: days to final · Fences & walls permits: declared value · Fences & walls permits by ZIP code.

Common questions

  • How many fence and wall permits does Corona issue a year?About 237 a year in Corona: 474 permits issued October 2024 through September 2026, 155 of them in the last 12 months.
  • How long does a fence and wall permit take in Corona?The usual one took 120 days from issue to the city's final inspection, and the middle half took 75 to 219 days (251 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Corona file the most fence and wall permits?August (192 against an average month of 100); January is the quietest (41). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most fence and wall permits in Corona?92883, with 177 of the 474 (37%); then 92881 (77).