Contractor Records
Home › Edina › ZIP 55343

Building permits in 55343, Edina

Data through September 2026 · updated 19 Oct 2026

431 building permits were issued in ZIP code 55343 by the City of Edina Building Inspections, October 2024 through September 2026: 4% of the 11,087 in Edina, the 6th busiest ZIP code. Plumbing permits lead with 238. 180 permits in the last 12 months (Oct 2025–Sep 2026), 28% fewer than the 251 in the 12 months before. Permits from a city that runs its own permit office are not counted.

431permits in 55343
180last 12 months
100%for homes
20days, usual issue to final
Sep 2026records through

Permits in 55343 by kind of work

Share here is the part of the 431 permits in 55343; citywide is the same for all of Edina.

Kind of workPermitsShare hereCitywide
Plumbing23855%36%
HVAC7718%26%
Remodels & repairs7116%24%
Roofing358%6%
Garages, sheds & shade structures3under 1%under 1%
Other72%5%

Download this table (CSV)

Permits in 55343 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)338152
202512255255
2026 (through September)9138184

Download this table (CSV)

How permits in 55343 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure55343Citywide
Permits issued Oct 2024–Sep 20252515,629
Finished46.2%72.4%
Expired0.4%0.1%
Usual days, issue to final2043

Download this table (CSV)

How these numbers are made

Source: City of Edina Permit Finder, PIMS Permits table (ArcGIS Building/Permit_Finder FeatureServer layer 5), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Edina issues for houses, townhouses and two-family homes inside the city: building, remodel, reroof, siding, deck and addition permits, mechanical and plumbing permits, home sewer and water work, and solar. Commercial, institutional and apartment (3+ unit) permits, signs, driveways, grading and tree escrows in the same table are not counted. Minneapolis, Bloomington, Richfield and the other Hennepin County cities run their own permit offices and are not in this file.

  • The city's permit table names no contractor, so there are no contractor lists, rankings or firm pages for Edina.
  • The table has no electrical permits, so there are no electrical counts here.
  • The table has no status column. A permit with a final date counts as finished, one with a dead date as expired and one with a cancelled date is left out; all others are open.
  • The city files most furnace, air conditioner, water heater, softener and gas piping permits under one broad residential type. We sort them into HVAC and plumbing by their work description; a permit that names both counts under the trade it names first.
  • The value is the valuation on the permit. The ZIP code comes from the Metropolitan Council's 2025 parcel points for the permit's parcel.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 55343, Edina", https://contractorrecords.com/edina/zip/55343, data through September 2026, from the City of Edina Building Inspections building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 55343 by kind of work · Permits in 55343 by year · Permits in 55343: finished and days to final.

Common questions

  • How many building permits were issued in 55343?431 permits issued by the city in ZIP code 55343, October 2024 through September 2026: 238 plumbing, 77 HVAC, 71 remodels & repairs. 180 were in the last 12 months.
  • What is built most in 55343?Plumbing: 238 of the 431 permits (55%), against 36% citywide.
  • How long does a permit take in 55343?The usual permit issued here Oct 2024–Sep 2025 took 20 days from issue to final (116 permits with a final date), against 43 days citywide.
  • Who did the work in 55343?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.