Building permits in 55416, Edina

Data through September 2026 · updated 19 Oct 2026

289 building permits were issued in ZIP code 55416 by the City of Edina Building Inspections, October 2024 through September 2026: 3% of the 11,087 in Edina, the 7th busiest ZIP code. HVAC permits lead with 90. 139 permits in the last 12 months (Oct 2025–Sep 2026), 7% fewer than the 150 in the 12 months before. Permits from a city that runs its own permit office are not counted.

289permits in 55416
139last 12 months
100%for homes
46days, usual issue to final
Sep 2026records through

Permits in 55416 by kind of work

Share here is the part of the 289 permits in 55416; citywide is the same for all of Edina.

Kind of workPermitsShare hereCitywide
HVAC9031%26%
Plumbing7727%36%
Remodels & repairs7125%24%
Roofing248%6%
New homes41%1%
Additions41%under 1%
Demolition31%1%
Garages, sheds & shade structures2under 1%under 1%
ADUs & casitas1under 1%under 1%
Pools & spas1under 1%under 1%
Other124%5%

Download this table (CSV)

Permits in 55416 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)346184
202512141141
2026 (through September)9102136

Download this table (CSV)

How permits in 55416 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure55416Citywide
Permits issued Oct 2024–Sep 20251505,629
Finished67.3%72.4%
Expired0.0%0.1%
Usual days, issue to final4643

Download this table (CSV)

How these numbers are made

Source: City of Edina Permit Finder, PIMS Permits table (ArcGIS Building/Permit_Finder FeatureServer layer 5), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Edina issues for houses, townhouses and two-family homes inside the city: building, remodel, reroof, siding, deck and addition permits, mechanical and plumbing permits, home sewer and water work, and solar. Commercial, institutional and apartment (3+ unit) permits, signs, driveways, grading and tree escrows in the same table are not counted. Minneapolis, Bloomington, Richfield and the other Hennepin County cities run their own permit offices and are not in this file.

  • The city's permit table names no contractor, so there are no contractor lists, rankings or firm pages for Edina.
  • The table has no electrical permits, so there are no electrical counts here.
  • The table has no status column. A permit with a final date counts as finished, one with a dead date as expired and one with a cancelled date is left out; all others are open.
  • The city files most furnace, air conditioner, water heater, softener and gas piping permits under one broad residential type. We sort them into HVAC and plumbing by their work description; a permit that names both counts under the trade it names first.
  • The value is the valuation on the permit. The ZIP code comes from the Metropolitan Council's 2025 parcel points for the permit's parcel.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 55416, Edina", https://contractorrecords.com/edina/zip/55416, data through September 2026, from the City of Edina Building Inspections building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 55416 by kind of work · Permits in 55416 by year · Permits in 55416: finished and days to final.

Common questions

  • How many building permits were issued in 55416?289 permits issued by the city in ZIP code 55416, October 2024 through September 2026: 90 HVAC, 77 plumbing, 71 remodels & repairs. 139 were in the last 12 months.
  • What is built most in 55416?HVAC: 90 of the 289 permits (31%), against 26% citywide.
  • How long does a permit take in 55416?The usual permit issued here Oct 2024–Sep 2025 took 46 days from issue to final (101 permits with a final date), against 43 days citywide.
  • Who did the work in 55416?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.