Plumbing permits in Edina, MN

Data through September 2026 · updated 19 Oct 2026

3,939 plumbing permits were issued in Edina, October 2024 through September 2026: about 1,970 a year and 36% of all permits. 1,866 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 10% fewer than the 2,073 in the 12 months before. The busiest month is June. The usual one took 23 days from issue to the city's final. 55436 has the most, 1,143.

3,939permits issued
1,866last 12 months
Junbusiest month
23days, usual issue to final
70%finished
$2,000usual declared value
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 217Oct2024Nov 2024: 149Dec 2024: 132Jan 2025: 133Jan2025Feb 2025: 130Mar 2025: 161Apr 2025: 166May 2025: 182Jun 2025: 225Jul 2025: 243JulAug 2025: 174Sep 2025: 161Oct 2025: 164Nov 2025: 128Dec 2025: 128Jan 2026: 114Jan2026Feb 2026: 120Mar 2026: 154Apr 2026: 147May 2026: 152Jun 2026: 217Jul 2026: 179JulAug 2026: 167Sep 2026: 196
The same numbers as a table
MonthPermits
Oct 2024217
Nov 2024149
Dec 2024132
Jan 2025133
Feb 2025130
Mar 2025161
Apr 2025166
May 2025182
Jun 2025225
Jul 2025243
Aug 2025174
Sep 2025161
Oct 2025164
Nov 2025128
Dec 2025128
Jan 2026114
Feb 2026120
Mar 2026154
Apr 2026147
May 2026152
Jun 2026217
Jul 2026179
Aug 2026167
Sep 2026196

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (135), January the quietest (75). A busy month at the permit counter usually means a longer wait for a contractor.

January: 75 (100 = an average month)February: 76 (100 = an average month)March: 96 (100 = an average month)April: 95 (100 = an average month)May: 102 (100 = an average month)June: 135 (100 = an average month)135July: 129 (100 = an average month)August: 104 (100 = an average month)September: 109 (100 = an average month)October: 116 (100 = an average month)November: 84 (100 = an average month)December: 79 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January75
February76
March96
April95
May102
June135
July129
August104
September109
October116
November84
December79

Download this table (CSV)

How long a plumbing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,442 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20252,073
Finished69.6%
Expired0.0%
Usual days, issue to final23
Middle half, days8–87

Download this table (CSV)

What a plumbing permit is declared at

The value written on the permit at application, from 3,772 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$2,000
Middle half$1,000–$4,500

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the city's 3,939 plumbing permits.

ZIP codePermitsShare
554361,14329%
5542487622%
5543975419%
5543554414%
554102927%
553432386%
55416772%
554233under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Maintenance/Repair/Replace: Residential2,65267%
Alteration/Remodel: Residential51413%
Maintenance/Repair/Replace: Residential Sewer Only2516%
New: Residential2216%
New: Residential Sewer and Water662%
Maintenance/Repair/Replace: Residential Water Only591%
New: Sump pump connection to city storm sewer411%
Maintenance/Repair/Replace: Residential Sewer and Water33under 1%
Maintenance/Repair/Replace (In Street/ROW): Residential Sewer and Water24under 1%
New (In Street): Residential Sewer and Water24under 1%

Download this table (CSV)

How Edina compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in the Twin Cities. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Edina Permit Finder, PIMS Permits table (ArcGIS Building/Permit_Finder FeatureServer layer 5), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Edina issues for houses, townhouses and two-family homes inside the city: building, remodel, reroof, siding, deck and addition permits, mechanical and plumbing permits, home sewer and water work, and solar. Commercial, institutional and apartment (3+ unit) permits, signs, driveways, grading and tree escrows in the same table are not counted. Minneapolis, Bloomington, Richfield and the other Hennepin County cities run their own permit offices and are not in this file.

  • The city's permit table names no contractor, so there are no contractor lists, rankings or firm pages for Edina.
  • The table has no electrical permits, so there are no electrical counts here.
  • The table has no status column. A permit with a final date counts as finished, one with a dead date as expired and one with a cancelled date is left out; all others are open.
  • The city files most furnace, air conditioner, water heater, softener and gas piping permits under one broad residential type. We sort them into HVAC and plumbing by their work description; a permit that names both counts under the trade it names first.
  • The value is the valuation on the permit. The ZIP code comes from the Metropolitan Council's 2025 parcel points for the permit's parcel.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in Edina, MN", https://contractorrecords.com/edina/plumbing-permits, data through September 2026, from the City of Edina Building Inspections building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits: declared value · Plumbing permits by ZIP code · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Edina issue a year?About 1,970 a year in Edina: 3,939 permits issued October 2024 through September 2026, 1,866 of them in the last 12 months.
  • How long does a plumbing permit take in Edina?The usual one took 23 days from issue to the city's final inspection, and the middle half took 8 to 87 days (1,442 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Edina file the most plumbing permits?June (135 against an average month of 100); January is the quietest (75). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in Edina?55436, with 1,143 of the 3,939 (29%); then 55424 (876).