Contractor Records
Home › Edina › Remodels & repairs

Remodel and repair permits in Edina, MN

Data through September 2026 · updated 19 Oct 2026

2,612 remodel and repair permits were issued in Edina, October 2024 through September 2026: about 1,306 a year and 24% of all permits. 1,314 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 1,298 in the 12 months before. The busiest month is August. The usual one took 85 days from issue to the city's final. 55436 has the most, 851.

2,612permits issued
1,314last 12 months
Augbusiest month
85days, usual issue to final
71%finished
$12,000usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 120Oct2024Nov 2024: 75Dec 2024: 61Jan 2025: 108Jan2025Feb 2025: 100Mar 2025: 117Apr 2025: 110May 2025: 108Jun 2025: 113Jul 2025: 122JulAug 2025: 138Sep 2025: 126Oct 2025: 140Nov 2025: 89Dec 2025: 83Jan 2026: 72Jan2026Feb 2026: 77Mar 2026: 117Apr 2026: 103May 2026: 106Jun 2026: 137Jul 2026: 137JulAug 2026: 125Sep 2026: 128
The same numbers as a table
MonthPermits
Oct 2024120
Nov 202475
Dec 202461
Jan 2025108
Feb 2025100
Mar 2025117
Apr 2025110
May 2025108
Jun 2025113
Jul 2025122
Aug 2025138
Sep 2025126
Oct 2025140
Nov 202589
Dec 202583
Jan 202672
Feb 202677
Mar 2026117
Apr 2026103
May 2026106
Jun 2026137
Jul 2026137
Aug 2026125
Sep 2026128

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (121), December the quietest (66). A busy month at the permit counter usually means a longer wait for a contractor.

January: 83 (100 = an average month)February: 81 (100 = an average month)March: 108 (100 = an average month)April: 98 (100 = an average month)May: 98 (100 = an average month)June: 115 (100 = an average month)July: 119 (100 = an average month)August: 121 (100 = an average month)121September: 117 (100 = an average month)October: 119 (100 = an average month)November: 75 (100 = an average month)December: 66 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January83
February81
March108
April98
May98
June115
July119
August121
September117
October119
November75
December66

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 921 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,298
Finished71.0%
Expired0.0%
Usual days, issue to final85
Middle half, days42–146

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 2,612 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$12,000
Middle half$5,000–$30,000

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 2,612 remodel and repair permits.

ZIP codePermitsShare
5543685133%
5542456922%
5543952320%
5543534313%
554101707%
55343713%
55416713%
554232under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Maintenance/Repair/Replace: Int Remodel, Bsmt Finish (434)92936%
Alteration/Remodel: Int Remodel, Bsmt Finish (434)81331%
Alteration/Remodel: Residential43517%
Maintenance/Repair/Replace: Siding (434)1988%
Maintenance/Repair/Replace: Single Family Detached (101or434)572%
Alteration/Remodel: Single Family Detached (101or434)402%
Interior Demolition (000): Int Remodel, Bsmt Finish (434)391%
Maintenance/Repair/Replace: Deck,Addn,Porch,Shed (434)351%
Alteration/Remodel: Single Family Attached (102or434)23under 1%
Maintenance/Repair/Replace: Single Family Attached (102or434)11under 1%

Download this table (CSV)

How Edina compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in the Twin Cities. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Edina Permit Finder, PIMS Permits table (ArcGIS Building/Permit_Finder FeatureServer layer 5), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Edina issues for houses, townhouses and two-family homes inside the city: building, remodel, reroof, siding, deck and addition permits, mechanical and plumbing permits, home sewer and water work, and solar. Commercial, institutional and apartment (3+ unit) permits, signs, driveways, grading and tree escrows in the same table are not counted. Minneapolis, Bloomington, Richfield and the other Hennepin County cities run their own permit offices and are not in this file.

  • The city's permit table names no contractor, so there are no contractor lists, rankings or firm pages for Edina.
  • The table has no electrical permits, so there are no electrical counts here.
  • The table has no status column. A permit with a final date counts as finished, one with a dead date as expired and one with a cancelled date is left out; all others are open.
  • The city files most furnace, air conditioner, water heater, softener and gas piping permits under one broad residential type. We sort them into HVAC and plumbing by their work description; a permit that names both counts under the trade it names first.
  • The value is the valuation on the permit. The ZIP code comes from the Metropolitan Council's 2025 parcel points for the permit's parcel.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Edina, MN", https://contractorrecords.com/edina/remodel-permits, data through September 2026, from the City of Edina Building Inspections building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits: declared value · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Edina issue a year?About 1,306 a year in Edina: 2,612 permits issued October 2024 through September 2026, 1,314 of them in the last 12 months.
  • How long does a remodel and repair permit take in Edina?The usual one took 85 days from issue to the city's final inspection, and the middle half took 42 to 146 days (921 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Edina file the most remodel and repair permits?August (121 against an average month of 100); December is the quietest (66). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Edina?55436, with 851 of the 2,612 (33%); then 55424 (569).