Contractor Records
Home › Edina › ZIP 55435

Building permits in 55435, Edina

Data through September 2026 · updated 19 Oct 2026

1,418 building permits were issued in ZIP code 55435 by the City of Edina Building Inspections, October 2024 through September 2026: 13% of the 11,087 in Edina, the 4th busiest ZIP code. Plumbing permits lead with 544. 706 permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 712 in the 12 months before. Permits from a city that runs its own permit office are not counted.

1,418permits in 55435
706last 12 months
100%for homes
43days, usual issue to final
Sep 2026records through

Permits in 55435 by kind of work

Share here is the part of the 1,418 permits in 55435; citywide is the same for all of Edina.

Kind of workPermitsShare hereCitywide
Plumbing54438%36%
HVAC35025%26%
Remodels & repairs34324%24%
Roofing645%6%
New homes11under 1%1%
Additions11under 1%under 1%
Demolition9under 1%1%
Pools & spas7under 1%under 1%
Garages, sheds & shade structures4under 1%under 1%
Other755%5%

Download this table (CSV)

Permits in 55435 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)3180720
202512716716
2026 (through September)9522696

Download this table (CSV)

How permits in 55435 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure55435Citywide
Permits issued Oct 2024–Sep 20257125,629
Finished73.7%72.4%
Expired0.1%0.1%
Usual days, issue to final4343

Download this table (CSV)

How these numbers are made

Source: City of Edina Permit Finder, PIMS Permits table (ArcGIS Building/Permit_Finder FeatureServer layer 5), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Edina issues for houses, townhouses and two-family homes inside the city: building, remodel, reroof, siding, deck and addition permits, mechanical and plumbing permits, home sewer and water work, and solar. Commercial, institutional and apartment (3+ unit) permits, signs, driveways, grading and tree escrows in the same table are not counted. Minneapolis, Bloomington, Richfield and the other Hennepin County cities run their own permit offices and are not in this file.

  • The city's permit table names no contractor, so there are no contractor lists, rankings or firm pages for Edina.
  • The table has no electrical permits, so there are no electrical counts here.
  • The table has no status column. A permit with a final date counts as finished, one with a dead date as expired and one with a cancelled date is left out; all others are open.
  • The city files most furnace, air conditioner, water heater, softener and gas piping permits under one broad residential type. We sort them into HVAC and plumbing by their work description; a permit that names both counts under the trade it names first.
  • The value is the valuation on the permit. The ZIP code comes from the Metropolitan Council's 2025 parcel points for the permit's parcel.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 55435, Edina", https://contractorrecords.com/edina/zip/55435, data through September 2026, from the City of Edina Building Inspections building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 55435 by kind of work · Permits in 55435 by year · Permits in 55435: finished and days to final.

Common questions

  • How many building permits were issued in 55435?1,418 permits issued by the city in ZIP code 55435, October 2024 through September 2026: 544 plumbing, 350 HVAC, 343 remodels & repairs. 706 were in the last 12 months.
  • What is built most in 55435?Plumbing: 544 of the 1,418 permits (38%), against 36% citywide.
  • How long does a permit take in 55435?The usual permit issued here Oct 2024–Sep 2025 took 43 days from issue to final (525 permits with a final date), against 43 days citywide.
  • Who did the work in 55435?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.