Roofing permits in Edina, MN

Data through September 2026 · updated 19 Oct 2026

689 roofing permits were issued in Edina, October 2024 through September 2026: about 344 a year and 6% of all permits. 328 roofing permits in the last 12 months (Oct 2025–Sep 2026), 9% fewer than the 361 in the 12 months before. The busiest month is October. The usual one took 41 days from issue to the city's final. 55424 has the most, 176.

689permits issued
328last 12 months
Octbusiest month
41days, usual issue to final
79%finished
$15,000usual declared value
Sep 2026records through

Roofing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 72Oct2024Nov 2024: 24Dec 2024: 16Jan 2025: 9Jan2025Feb 2025: 3Mar 2025: 15Apr 2025: 26May 2025: 60Jun 2025: 31Jul 2025: 30JulAug 2025: 31Sep 2025: 44Oct 2025: 47Nov 2025: 26Dec 2025: 3Jan 2026: 0Jan2026Feb 2026: 5Mar 2026: 12Apr 2026: 23May 2026: 38Jun 2026: 60Jul 2026: 31JulAug 2026: 34Sep 2026: 49
The same numbers as a table
MonthPermits
Oct 202472
Nov 202424
Dec 202416
Jan 20259
Feb 20253
Mar 202515
Apr 202526
May 202560
Jun 202531
Jul 202530
Aug 202531
Sep 202544
Oct 202547
Nov 202526
Dec 20253
Jan 20260
Feb 20265
Mar 202612
Apr 202623
May 202638
Jun 202660
Jul 202631
Aug 202634
Sep 202649

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (207), February the quietest (14). A busy month at the permit counter usually means a longer wait for a contractor.

January: 16 (100 = an average month)February: 14 (100 = an average month)March: 47 (100 = an average month)April: 85 (100 = an average month)May: 171 (100 = an average month)June: 158 (100 = an average month)July: 106 (100 = an average month)August: 113 (100 = an average month)September: 162 (100 = an average month)October: 207 (100 = an average month)207November: 87 (100 = an average month)December: 33 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January16
February14
March47
April85
May171
June158
July106
August113
September162
October207
November87
December33

Download this table (CSV)

How long a roofing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 286 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025361
Finished79.2%
Expired0.0%
Usual days, issue to final41
Middle half, days16–91

Download this table (CSV)

What a roofing permit is declared at

The value written on the permit at application, from 689 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$15,000
Middle half$10,000–$24,573

Download this table (CSV)

ZIP codes with the most roofing permits

Counted at the property's ZIP code. Share is the part of the city's 689 roofing permits.

ZIP codePermitsShare
5542417626%
5543617626%
5543914421%
55435649%
55410629%
55343355%
55416243%
554235under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Maintenance/Repair/Replace: Reroof (434or437)65795%
Maintenance/Repair/Replace: Reroof and Siding (434)304%
Alteration/Remodel: Reroof (434or437)1under 1%
New: Reroof (434or437)1under 1%

Download this table (CSV)

How Edina compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Roofing permits for other places in the Twin Cities. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Edina Permit Finder, PIMS Permits table (ArcGIS Building/Permit_Finder FeatureServer layer 5), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Edina issues for houses, townhouses and two-family homes inside the city: building, remodel, reroof, siding, deck and addition permits, mechanical and plumbing permits, home sewer and water work, and solar. Commercial, institutional and apartment (3+ unit) permits, signs, driveways, grading and tree escrows in the same table are not counted. Minneapolis, Bloomington, Richfield and the other Hennepin County cities run their own permit offices and are not in this file.

  • The city's permit table names no contractor, so there are no contractor lists, rankings or firm pages for Edina.
  • The table has no electrical permits, so there are no electrical counts here.
  • The table has no status column. A permit with a final date counts as finished, one with a dead date as expired and one with a cancelled date is left out; all others are open.
  • The city files most furnace, air conditioner, water heater, softener and gas piping permits under one broad residential type. We sort them into HVAC and plumbing by their work description; a permit that names both counts under the trade it names first.
  • The value is the valuation on the permit. The ZIP code comes from the Metropolitan Council's 2025 parcel points for the permit's parcel.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in Edina, MN", https://contractorrecords.com/edina/roofing-permits, data through September 2026, from the City of Edina Building Inspections building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: days to final · Roofing permits: declared value · Roofing permits by ZIP code · Roofing permits by permit type.

Common questions

  • How many roofing permits does Edina issue a year?About 344 a year in Edina: 689 permits issued October 2024 through September 2026, 328 of them in the last 12 months.
  • How long does a roofing permit take in Edina?The usual one took 41 days from issue to the city's final inspection, and the middle half took 16 to 91 days (286 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Edina file the most roofing permits?October (207 against an average month of 100); February is the quietest (14). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most roofing permits in Edina?55424, with 176 of the 689 (26%); then 55436 (176).