HVAC permits in Edina, MN

Data through September 2026 · updated 19 Oct 2026

2,872 HVAC permits were issued in Edina, October 2024 through September 2026: about 1,436 a year and 26% of all permits. 1,473 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 5% more than the 1,399 in the 12 months before. The busiest month is July. The usual one took 30 days from issue to the city's final. 55436 has the most, 875.

2,872permits issued
1,473last 12 months
Julbusiest month
30days, usual issue to final
76%finished
$6,855usual declared value
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 134Oct2024Nov 2024: 108Dec 2024: 129Jan 2025: 127Jan2025Feb 2025: 94Mar 2025: 77Apr 2025: 92May 2025: 126Jun 2025: 127Jul 2025: 152JulAug 2025: 122Sep 2025: 111Oct 2025: 160Nov 2025: 114Dec 2025: 145Jan 2026: 128Jan2026Feb 2026: 84Mar 2026: 88Apr 2026: 99May 2026: 100Jun 2026: 149Jul 2026: 168JulAug 2026: 112Sep 2026: 126
The same numbers as a table
MonthPermits
Oct 2024134
Nov 2024108
Dec 2024129
Jan 2025127
Feb 202594
Mar 202577
Apr 202592
May 2025126
Jun 2025127
Jul 2025152
Aug 2025122
Sep 2025111
Oct 2025160
Nov 2025114
Dec 2025145
Jan 2026128
Feb 202684
Mar 202688
Apr 202699
May 2026100
Jun 2026149
Jul 2026168
Aug 2026112
Sep 2026126

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (134), March the quietest (69). A busy month at the permit counter usually means a longer wait for a contractor.

January: 107 (100 = an average month)February: 74 (100 = an average month)March: 69 (100 = an average month)April: 80 (100 = an average month)May: 94 (100 = an average month)June: 115 (100 = an average month)July: 134 (100 = an average month)134August: 98 (100 = an average month)September: 99 (100 = an average month)October: 123 (100 = an average month)November: 93 (100 = an average month)December: 114 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January107
February74
March69
April80
May94
June115
July134
August98
September99
October123
November93
December114

Download this table (CSV)

How long an HVAC permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,062 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,399
Finished75.9%
Expired0.0%
Usual days, issue to final30
Middle half, days14–112

Download this table (CSV)

What an HVAC permit is declared at

The value written on the permit at application, from 2,872 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$6,855
Middle half$4,000–$10,500

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 2,872 HVAC permits.

ZIP codePermitsShare
5543687530%
5542468424%
5543955519%
5543535012%
554102288%
55416903%
55343773%
554234under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Maintenance/Repair/Replace: Residential2,32081%
Alteration/Remodel: Residential41314%
New: Residential1124%
Addition: Residential27under 1%

Download this table (CSV)

How Edina compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

HVAC permits for other places in the Twin Cities. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Edina Permit Finder, PIMS Permits table (ArcGIS Building/Permit_Finder FeatureServer layer 5), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Edina issues for houses, townhouses and two-family homes inside the city: building, remodel, reroof, siding, deck and addition permits, mechanical and plumbing permits, home sewer and water work, and solar. Commercial, institutional and apartment (3+ unit) permits, signs, driveways, grading and tree escrows in the same table are not counted. Minneapolis, Bloomington, Richfield and the other Hennepin County cities run their own permit offices and are not in this file.

  • The city's permit table names no contractor, so there are no contractor lists, rankings or firm pages for Edina.
  • The table has no electrical permits, so there are no electrical counts here.
  • The table has no status column. A permit with a final date counts as finished, one with a dead date as expired and one with a cancelled date is left out; all others are open.
  • The city files most furnace, air conditioner, water heater, softener and gas piping permits under one broad residential type. We sort them into HVAC and plumbing by their work description; a permit that names both counts under the trade it names first.
  • The value is the valuation on the permit. The ZIP code comes from the Metropolitan Council's 2025 parcel points for the permit's parcel.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in Edina, MN", https://contractorrecords.com/edina/hvac-permits, data through September 2026, from the City of Edina Building Inspections building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: days to final · HVAC permits: declared value · HVAC permits by ZIP code · HVAC permits by permit type.

Common questions

  • How many HVAC permits does Edina issue a year?About 1,436 a year in Edina: 2,872 permits issued October 2024 through September 2026, 1,473 of them in the last 12 months.
  • How long does an HVAC permit take in Edina?The usual one took 30 days from issue to the city's final inspection, and the middle half took 14 to 112 days (1,062 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Edina file the most HVAC permits?July (134 against an average month of 100); March is the quietest (69). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Edina?55436, with 875 of the 2,872 (30%); then 55424 (684).