Building permits in 55410, Edina

Data through September 2026 · updated 19 Oct 2026

862 building permits were issued in ZIP code 55410 by the City of Edina Building Inspections, October 2024 through September 2026: 8% of the 11,087 in Edina, the 5th busiest ZIP code. Plumbing permits lead with 292. 438 permits in the last 12 months (Oct 2025–Sep 2026), 3% more than the 424 in the 12 months before. Permits from a city that runs its own permit office are not counted.

862permits in 55410
438last 12 months
100%for homes
44days, usual issue to final
Sep 2026records through

Permits in 55410 by kind of work

Share here is the part of the 862 permits in 55410; citywide is the same for all of Edina.

Kind of workPermitsShare hereCitywide
Plumbing29234%36%
HVAC22826%26%
Remodels & repairs17020%24%
Roofing627%6%
New homes303%1%
Demolition243%1%
Additions101%under 1%
Pools & spas3under 1%under 1%
Garages, sheds & shade structures3under 1%under 1%
Other405%5%

Download this table (CSV)

Permits in 55410 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)3106424
202512431431
2026 (through September)9325433

Download this table (CSV)

How permits in 55410 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure55410Citywide
Permits issued Oct 2024–Sep 20254245,629
Finished73.1%72.4%
Expired0.0%0.1%
Usual days, issue to final4443

Download this table (CSV)

How these numbers are made

Source: City of Edina Permit Finder, PIMS Permits table (ArcGIS Building/Permit_Finder FeatureServer layer 5), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Edina issues for houses, townhouses and two-family homes inside the city: building, remodel, reroof, siding, deck and addition permits, mechanical and plumbing permits, home sewer and water work, and solar. Commercial, institutional and apartment (3+ unit) permits, signs, driveways, grading and tree escrows in the same table are not counted. Minneapolis, Bloomington, Richfield and the other Hennepin County cities run their own permit offices and are not in this file.

  • The city's permit table names no contractor, so there are no contractor lists, rankings or firm pages for Edina.
  • The table has no electrical permits, so there are no electrical counts here.
  • The table has no status column. A permit with a final date counts as finished, one with a dead date as expired and one with a cancelled date is left out; all others are open.
  • The city files most furnace, air conditioner, water heater, softener and gas piping permits under one broad residential type. We sort them into HVAC and plumbing by their work description; a permit that names both counts under the trade it names first.
  • The value is the valuation on the permit. The ZIP code comes from the Metropolitan Council's 2025 parcel points for the permit's parcel.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 55410, Edina", https://contractorrecords.com/edina/zip/55410, data through September 2026, from the City of Edina Building Inspections building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 55410 by kind of work · Permits in 55410 by year · Permits in 55410: finished and days to final.

Common questions

  • How many building permits were issued in 55410?862 permits issued by the city in ZIP code 55410, October 2024 through September 2026: 292 plumbing, 228 HVAC, 170 remodels & repairs. 438 were in the last 12 months.
  • What is built most in 55410?Plumbing: 292 of the 862 permits (34%), against 36% citywide.
  • How long does a permit take in 55410?The usual permit issued here Oct 2024–Sep 2025 took 44 days from issue to final (310 permits with a final date), against 43 days citywide.
  • Who did the work in 55410?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.