HVAC permits in the City of Kennewick, WA

Data through September 2026 · updated 19 Oct 2026

1,108 HVAC permits were issued in the City of Kennewick, October 2024 through September 2026: about 554 a year and 24% of all permits. 527 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 9% fewer than the 581 in the 12 months before. The busiest month is July. The usual one took 20 days from issue to the city's final.

1,108permits issued
527last 12 months
Julbusiest month
20days, usual issue to final
74%finished
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 44Oct2024Nov 2024: 36Dec 2024: 42Jan 2025: 45Jan2025Feb 2025: 33Mar 2025: 39Apr 2025: 55May 2025: 60Jun 2025: 63Jul 2025: 77JulAug 2025: 41Sep 2025: 46Oct 2025: 40Nov 2025: 32Dec 2025: 38Jan 2026: 24Jan2026Feb 2026: 28Mar 2026: 63Apr 2026: 51May 2026: 56Jun 2026: 64Jul 2026: 74JulAug 2026: 32Sep 2026: 25
The same numbers as a table
MonthPermits
Oct 202444
Nov 202436
Dec 202442
Jan 202545
Feb 202533
Mar 202539
Apr 202555
May 202560
Jun 202563
Jul 202577
Aug 202541
Sep 202546
Oct 202540
Nov 202532
Dec 202538
Jan 202624
Feb 202628
Mar 202663
Apr 202651
May 202656
Jun 202664
Jul 202674
Aug 202632
Sep 202625

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (164), February the quietest (66). A busy month at the permit counter usually means a longer wait for a contractor.

January: 75 (100 = an average month)February: 66 (100 = an average month)March: 110 (100 = an average month)April: 115 (100 = an average month)May: 126 (100 = an average month)June: 138 (100 = an average month)July: 164 (100 = an average month)164August: 79 (100 = an average month)September: 77 (100 = an average month)October: 91 (100 = an average month)November: 74 (100 = an average month)December: 87 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January75
February66
March110
April115
May126
June138
July164
August79
September77
October91
November74
December87

Download this table (CSV)

How long an HVAC permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 427 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025581
Finished73.5%
Expired23.9%
Usual days, issue to final20
Middle half, days8–61

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Mechanical - Residential78271%
Commercial Mechanical - Commercial32629%

Download this table (CSV)

How Kennewick compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

HVAC permits for other places in the Tri-Cities. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Kennewick EnerGov public permit layer (Public/EnerGovPublicInspection, EnerGovPermits), behind the city's Permit & Plan Explorer, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, mechanical, plumbing, sign and fire-system permits the City of Kennewick issues inside the city limits only. Richland, Pasco, West Richland and unincorporated Benton County run their own permit offices and are not in this file. Public works, utility-connection, right-of-way and grading permits are left out. Electrical permits in Washington are issued by the state Department of Labor & Industries, not the city, so they are not in this file.

  • The city's public permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Kennewick.
  • The layer has no declared job value, so we show no costs.
  • The layer has no street address or ZIP code, so there are no ZIP code pages for Kennewick.
  • Electrical permits are issued by Washington's Department of Labor & Industries, not the city, so electrical and most solar work does not appear here.
  • A final date is the date the city finalized the permit; permits the city voided, cancelled or denied are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in the City of Kennewick, WA", https://contractorrecords.com/kennewick/hvac-permits, data through September 2026, from the City of Kennewick Building Safety Division building-permit records.

Link to a table: By month · Season · Days to final · Permit types.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: days to final · HVAC permits by permit type.

Common questions

  • How many HVAC permits does Kennewick issue a year?About 554 a year in the City of Kennewick: 1,108 permits issued October 2024 through September 2026, 527 of them in the last 12 months.
  • How long does an HVAC permit take in Kennewick?The usual one took 20 days from issue to the city's final inspection, and the middle half took 8 to 61 days (427 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Kennewick file the most HVAC permits?July (164 against an average month of 100); February is the quietest (66). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.