Plumbing permits in the City of Kennewick, WA

Data through September 2026 · updated 19 Oct 2026

609 plumbing permits were issued in the City of Kennewick, October 2024 through September 2026: about 304 a year and 13% of all permits. 309 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 3% more than the 300 in the 12 months before. The busiest month is March. The usual one took 18 days from issue to the city's final.

609permits issued
309last 12 months
Marbusiest month
18days, usual issue to final
73%finished
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 23Oct2024Nov 2024: 22Dec 2024: 18Jan 2025: 26Jan2025Feb 2025: 28Mar 2025: 34Apr 2025: 30May 2025: 16Jun 2025: 20Jul 2025: 33JulAug 2025: 22Sep 2025: 28Oct 2025: 21Nov 2025: 29Dec 2025: 26Jan 2026: 18Jan2026Feb 2026: 23Mar 2026: 43Apr 2026: 34May 2026: 18Jun 2026: 20Jul 2026: 31JulAug 2026: 22Sep 2026: 24
The same numbers as a table
MonthPermits
Oct 202423
Nov 202422
Dec 202418
Jan 202526
Feb 202528
Mar 202534
Apr 202530
May 202516
Jun 202520
Jul 202533
Aug 202522
Sep 202528
Oct 202521
Nov 202529
Dec 202526
Jan 202618
Feb 202623
Mar 202643
Apr 202634
May 202618
Jun 202620
Jul 202631
Aug 202622
Sep 202624

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (152), May the quietest (67). A busy month at the permit counter usually means a longer wait for a contractor.

January: 87 (100 = an average month)February: 100 (100 = an average month)March: 152 (100 = an average month)152April: 126 (100 = an average month)May: 67 (100 = an average month)June: 79 (100 = an average month)July: 126 (100 = an average month)August: 87 (100 = an average month)September: 102 (100 = an average month)October: 87 (100 = an average month)November: 100 (100 = an average month)December: 87 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January87
February100
March152
April126
May67
June79
July126
August87
September102
October87
November100
December87

Download this table (CSV)

How long a plumbing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 220 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025300
Finished73.3%
Expired20.7%
Usual days, issue to final18
Middle half, days7–101

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Plumbing - Residential35658%
Commercial Plumbing - Commercial20534%
Residential Mechanical - Residential244%
Residential Plumbing - Residential Plumbing Sewer Connection203%
Commercial Mechanical - Commercial4under 1%

Download this table (CSV)

How Kennewick compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in the Tri-Cities. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Kennewick EnerGov public permit layer (Public/EnerGovPublicInspection, EnerGovPermits), behind the city's Permit & Plan Explorer, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, mechanical, plumbing, sign and fire-system permits the City of Kennewick issues inside the city limits only. Richland, Pasco, West Richland and unincorporated Benton County run their own permit offices and are not in this file. Public works, utility-connection, right-of-way and grading permits are left out. Electrical permits in Washington are issued by the state Department of Labor & Industries, not the city, so they are not in this file.

  • The city's public permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Kennewick.
  • The layer has no declared job value, so we show no costs.
  • The layer has no street address or ZIP code, so there are no ZIP code pages for Kennewick.
  • Electrical permits are issued by Washington's Department of Labor & Industries, not the city, so electrical and most solar work does not appear here.
  • A final date is the date the city finalized the permit; permits the city voided, cancelled or denied are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in the City of Kennewick, WA", https://contractorrecords.com/kennewick/plumbing-permits, data through September 2026, from the City of Kennewick Building Safety Division building-permit records.

Link to a table: By month · Season · Days to final · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Kennewick issue a year?About 304 a year in the City of Kennewick: 609 permits issued October 2024 through September 2026, 309 of them in the last 12 months.
  • How long does a plumbing permit take in Kennewick?The usual one took 18 days from issue to the city's final inspection, and the middle half took 7 to 101 days (220 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Kennewick file the most plumbing permits?March (152 against an average month of 100); May is the quietest (67). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.