Roofing permits in the City of Kennewick, WA

Data through September 2026 · updated 19 Oct 2026

603 roofing permits were issued in the City of Kennewick, October 2024 through September 2026: about 302 a year and 13% of all permits. 340 roofing permits in the last 12 months (Oct 2025–Sep 2026), 29% more than the 263 in the 12 months before. The busiest month is March. The usual one took 18 days from issue to the city's final.

603permits issued
340last 12 months
Marbusiest month
18days, usual issue to final
64%finished
Sep 2026records through

Roofing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 25Oct2024Nov 2024: 6Dec 2024: 8Jan 2025: 16Jan2025Feb 2025: 10Mar 2025: 30Apr 2025: 25May 2025: 33Jun 2025: 43Jul 2025: 19JulAug 2025: 28Sep 2025: 20Oct 2025: 22Nov 2025: 13Dec 2025: 28Jan 2026: 8Jan2026Feb 2026: 13Mar 2026: 49Apr 2026: 41May 2026: 42Jun 2026: 30Jul 2026: 27JulAug 2026: 26Sep 2026: 41
The same numbers as a table
MonthPermits
Oct 202425
Nov 20246
Dec 20248
Jan 202516
Feb 202510
Mar 202530
Apr 202525
May 202533
Jun 202543
Jul 202519
Aug 202528
Sep 202520
Oct 202522
Nov 202513
Dec 202528
Jan 20268
Feb 202613
Mar 202649
Apr 202641
May 202642
Jun 202630
Jul 202627
Aug 202626
Sep 202641

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (157), November the quietest (38). A busy month at the permit counter usually means a longer wait for a contractor.

January: 48 (100 = an average month)February: 46 (100 = an average month)March: 157 (100 = an average month)157April: 131 (100 = an average month)May: 149 (100 = an average month)June: 145 (100 = an average month)July: 92 (100 = an average month)August: 107 (100 = an average month)September: 121 (100 = an average month)October: 94 (100 = an average month)November: 38 (100 = an average month)December: 72 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January48
February46
March157
April131
May149
June145
July92
August107
September121
October94
November38
December72

Download this table (CSV)

How long a roofing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 168 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025263
Finished63.9%
Expired35.7%
Usual days, issue to final18
Middle half, days9–48

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential - Reroof53889%
Commercial - Reroof6511%

Download this table (CSV)

How Kennewick compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Roofing permits for other places in the Tri-Cities. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Kennewick EnerGov public permit layer (Public/EnerGovPublicInspection, EnerGovPermits), behind the city's Permit & Plan Explorer, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, mechanical, plumbing, sign and fire-system permits the City of Kennewick issues inside the city limits only. Richland, Pasco, West Richland and unincorporated Benton County run their own permit offices and are not in this file. Public works, utility-connection, right-of-way and grading permits are left out. Electrical permits in Washington are issued by the state Department of Labor & Industries, not the city, so they are not in this file.

  • The city's public permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Kennewick.
  • The layer has no declared job value, so we show no costs.
  • The layer has no street address or ZIP code, so there are no ZIP code pages for Kennewick.
  • Electrical permits are issued by Washington's Department of Labor & Industries, not the city, so electrical and most solar work does not appear here.
  • A final date is the date the city finalized the permit; permits the city voided, cancelled or denied are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in the City of Kennewick, WA", https://contractorrecords.com/kennewick/roofing-permits, data through September 2026, from the City of Kennewick Building Safety Division building-permit records.

Link to a table: By month · Season · Days to final · Permit types.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: days to final · Roofing permits by permit type.

Common questions

  • How many roofing permits does Kennewick issue a year?About 302 a year in the City of Kennewick: 603 permits issued October 2024 through September 2026, 340 of them in the last 12 months.
  • How long does a roofing permit take in Kennewick?The usual one took 18 days from issue to the city's final inspection, and the middle half took 9 to 48 days (168 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Kennewick file the most roofing permits?March (157 against an average month of 100); November is the quietest (38). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.