Home addition permits in the City of Los Angeles, CA

Data through September 2026 · updated 18 Oct 2026

4,718 home addition permits were issued in the City of Los Angeles, October 2024 through September 2026: about 2,359 a year and 5% of all permits. 2,179 home addition permits in the last 12 months (Oct 2025–Sep 2026), 14% fewer than the 2,539 in the 12 months before. The busiest month is February. The usual one took 293 days from issue to the city's final. 90066 has the most, 151.

What this file covers: This is the LADBS building-permit file. Electrical, plumbing and mechanical permits are kept in separate files and not counted, so those trades show only when a building permit names them.

4,718permits issued
2,179last 12 months
Febbusiest month
293days, usual issue to final
51%finished
$70,000usual declared value
Sep 2026records through

Home addition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 219Oct2024Nov 2024: 205Dec 2024: 212Jan 2025: 195Jan2025Feb 2025: 229Mar 2025: 211Apr 2025: 234May 2025: 199Jun 2025: 204Jul 2025: 232JulAug 2025: 224Sep 2025: 175Oct 2025: 194Nov 2025: 151Dec 2025: 161Jan 2026: 168Jan2026Feb 2026: 207Mar 2026: 212Apr 2026: 165May 2026: 196Jun 2026: 199Jul 2026: 188JulAug 2026: 173Sep 2026: 165
The same numbers as a table
MonthPermits
Oct 2024219
Nov 2024205
Dec 2024212
Jan 2025195
Feb 2025229
Mar 2025211
Apr 2025234
May 2025199
Jun 2025204
Jul 2025232
Aug 2025224
Sep 2025175
Oct 2025194
Nov 2025151
Dec 2025161
Jan 2026168
Feb 2026207
Mar 2026212
Apr 2026165
May 2026196
Jun 2026199
Jul 2026188
Aug 2026173
Sep 2026165

Download this table (CSV)

When home addition permits are filed

By calendar month, 100 = an average month (the thin line). February is the busiest (111), September the quietest (86). A busy month at the permit counter usually means a longer wait for a contractor.

January: 92 (100 = an average month)February: 111 (100 = an average month)111March: 108 (100 = an average month)April: 101 (100 = an average month)May: 100 (100 = an average month)June: 103 (100 = an average month)July: 107 (100 = an average month)August: 101 (100 = an average month)September: 86 (100 = an average month)October: 105 (100 = an average month)November: 91 (100 = an average month)December: 95 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January92
February111
March108
April101
May100
June103
July107
August101
September86
October105
November91
December95

Download this table (CSV)

How long a home addition permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,290 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20252,539
Finished50.8%
Expired0.0%
Usual days, issue to final293
Middle half, days198–398

Download this table (CSV)

What a home addition permit is declared at

The value written on the permit at application, from 4,708 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$70,000
Middle half$35,000–$150,000

Download this table (CSV)

ZIP codes with the most home addition permits

Counted at the property's ZIP code. Share is the part of the city's 4,718 home addition permits.

ZIP codePermitsShare
900661513%
913441503%
913671443%
900451413%
913351243%
900491142%
902721072%
91331982%
90064962%
91316932%

Download this table (CSV)

Nearby permit data

Home addition permits for other places in Los Angeles and the Inland Empire. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: LADBS, Building and Safety - Building Permits Issued from 2020 to Present (N), data.lacity.org, read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building permits the City of Los Angeles Department of Building and Safety (LADBS) issues inside the city limits only. Other cities in Los Angeles County (Long Beach, Pasadena, Santa Monica, Glendale and the rest) and unincorporated county land run their own permit offices and are not in this file. Electrical, plumbing and mechanical permits are kept by LADBS in separate files and are not counted here, so those trades show only when a building permit names them.

  • The city's open permit file names no contractor, so there are no contractor lists, rankings or firm pages for Los Angeles.
  • Only building permits are counted. LADBS keeps electrical and mechanical (heating, air conditioning, plumbing) permits in separate files, so solar, HVAC, plumbing and electrical work is undercounted: it shows only when a building permit names it.
  • Supplemental permits (a revision or transfer of an earlier permit) and grading permits are left out.
  • The value is the job valuation the permit was issued on, which sets the fee. It is not a final cost.
  • A final date is the date the permit was finaled or its certificate of occupancy issued.
  • Permits after the January 2025 wildfires include rebuilding work in Pacific Palisades and other burn areas.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Home addition permits in the City of Los Angeles, CA", https://contractorrecords.com/los-angeles/addition-permits, data through September 2026, from the City of Los Angeles Department of Building and Safety building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code.

Download the tables (CSV): Additions permits by month · Additions permits by calendar month (index) · Additions permits: days to final · Additions permits: declared value · Additions permits by ZIP code.

Common questions

  • How many home addition permits does Los Angeles issue a year?About 2,359 a year in the City of Los Angeles: 4,718 permits issued October 2024 through September 2026, 2,179 of them in the last 12 months.
  • How long does a home addition permit take in Los Angeles?The usual one took 293 days from issue to the city's final inspection, and the middle half took 198 to 398 days (1,290 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Los Angeles file the most home addition permits?February (111 against an average month of 100); September is the quietest (86). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most home addition permits in Los Angeles?90066, with 151 of the 4,718 (3%); then 91344 (150).