Electrical permits in Lynchburg, VA

Data through September 2026 · updated 20 Oct 2026

651 electrical permits were issued in Lynchburg, October 2024 through September 2026: about 326 a year and 22% of all permits. 347 electrical permits in the last 12 months (Oct 2025–Sep 2026), 14% more than the 304 in the 12 months before. The busiest month is July. The usual one took 14 days from issue to the city's final.

651permits issued
347last 12 months
Julbusiest month
14days, usual issue to final
88%finished
$2,500usual declared value
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 30Oct2024Nov 2024: 17Dec 2024: 22Jan 2025: 36Jan2025Feb 2025: 21Mar 2025: 27Apr 2025: 39May 2025: 18Jun 2025: 11Jul 2025: 28JulAug 2025: 29Sep 2025: 26Oct 2025: 31Nov 2025: 32Dec 2025: 30Jan 2026: 28Jan2026Feb 2026: 23Mar 2026: 31Apr 2026: 29May 2026: 24Jun 2026: 28Jul 2026: 41JulAug 2026: 19Sep 2026: 31
The same numbers as a table
MonthPermits
Oct 202430
Nov 202417
Dec 202422
Jan 202536
Feb 202521
Mar 202527
Apr 202539
May 202518
Jun 202511
Jul 202528
Aug 202529
Sep 202526
Oct 202531
Nov 202532
Dec 202530
Jan 202628
Feb 202623
Mar 202631
Apr 202629
May 202624
Jun 202628
Jul 202641
Aug 202619
Sep 202631

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (127), June the quietest (72). A busy month at the permit counter usually means a longer wait for a contractor.

January: 118 (100 = an average month)February: 81 (100 = an average month)March: 107 (100 = an average month)April: 125 (100 = an average month)May: 77 (100 = an average month)June: 72 (100 = an average month)July: 127 (100 = an average month)127August: 88 (100 = an average month)September: 105 (100 = an average month)October: 112 (100 = an average month)November: 90 (100 = an average month)December: 96 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January118
February81
March107
April125
May77
June72
July127
August88
September105
October112
November90
December96

Download this table (CSV)

How long an electrical permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 267 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025304
Finished87.8%
Expired0.0%
Usual days, issue to final14
Middle half, days5–73

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 637 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$2,500
Middle half$1,000–$5,300

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical residential EZ permit40562%
Electrical24437%
Electrical commercial online permit2under 1%

Download this table (CSV)

How Lynchburg compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Lynchburg GIS open data, Building Permits - Tabluar (ODPDynamic MapServer layer 37, from the city's TRAKiT permit system), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Lynchburg Department of Community Development issued inside the city. Lynchburg is an independent city; homes with a Lynchburg mailing address in Bedford, Campbell or Amherst County get their permits from those counties and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Lynchburg.
  • The file has no homes-versus-other flag on building permits, so a permit counts as a home when its parcel is a residential property class (or when it is a residential EZ permit).
  • Kinds of work within building permits (roofing, decks and garages, pools, fences) are picked out by the short job name.
  • Job value is the value declared on the permit; many trade permits carry none. A final date is the city's end date on a finaled permit.
  • The file has no ZIP code, so there are no ZIP code pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Lynchburg, VA", https://contractorrecords.com/lynchburg/electrical-permits, data through September 2026, from City of Lynchburg Community Development building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits: declared value · Electrical permits by permit type.

Common questions

  • How many electrical permits does Lynchburg issue a year?About 326 a year in Lynchburg: 651 permits issued October 2024 through September 2026, 347 of them in the last 12 months.
  • How long does an electrical permit take in Lynchburg?The usual one took 14 days from issue to the city's final inspection, and the middle half took 5 to 73 days (267 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Lynchburg file the most electrical permits?July (127 against an average month of 100); June is the quietest (72). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.