Contractor Records
Home › Lynchburg › Plumbing

Plumbing permits in Lynchburg, VA

Data through September 2026 · updated 20 Oct 2026

240 plumbing permits were issued in Lynchburg, October 2024 through September 2026: about 120 a year and 8% of all permits. 158 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 93% more than the 82 in the 12 months before. The busiest month is July. The usual one took 10 days from issue to the city's final.

240permits issued
158last 12 months
Julbusiest month
10days, usual issue to final
$4,500usual declared value
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 9Oct2024Nov 2024: 4Dec 2024: 7Jan 2025: 5Jan2025Feb 2025: 8Mar 2025: 4Apr 2025: 5May 2025: 5Jun 2025: 6Jul 2025: 15JulAug 2025: 6Sep 2025: 8Oct 2025: 17Nov 2025: 10Dec 2025: 14Jan 2026: 4Jan2026Feb 2026: 12Mar 2026: 18Apr 2026: 15May 2026: 15Jun 2026: 9Jul 2026: 11JulAug 2026: 15Sep 2026: 18
The same numbers as a table
MonthPermits
Oct 20249
Nov 20244
Dec 20247
Jan 20255
Feb 20258
Mar 20254
Apr 20255
May 20255
Jun 20256
Jul 202515
Aug 20256
Sep 20258
Oct 202517
Nov 202510
Dec 202514
Jan 20264
Feb 202612
Mar 202618
Apr 202615
May 202615
Jun 20269
Jul 202611
Aug 202615
Sep 202618

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (130), January the quietest (45). A busy month at the permit counter usually means a longer wait for a contractor.

January: 45 (100 = an average month)February: 100 (100 = an average month)March: 110 (100 = an average month)April: 100 (100 = an average month)May: 100 (100 = an average month)June: 75 (100 = an average month)July: 130 (100 = an average month)130August: 105 (100 = an average month)September: 130 (100 = an average month)October: 130 (100 = an average month)November: 70 (100 = an average month)December: 105 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January45
February100
March110
April100
May100
June75
July130
August105
September130
October130
November70
December105

Download this table (CSV)

How long a plumbing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 73 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 202582
Usual days, issue to final10
Middle half, days3–38

Download this table (CSV)

What a plumbing permit is declared at

The value written on the permit at application, from 238 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$4,500
Middle half$3,000–$7,311

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Plumbing residential EZ permit14460%
Plumbing6728%
Mechanical / Gas2310%
Mechanical residential EZ permit62%

Download this table (CSV)

How Lynchburg compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Lynchburg GIS open data, Building Permits - Tabluar (ODPDynamic MapServer layer 37, from the city's TRAKiT permit system), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Lynchburg Department of Community Development issued inside the city. Lynchburg is an independent city; homes with a Lynchburg mailing address in Bedford, Campbell or Amherst County get their permits from those counties and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Lynchburg.
  • The file has no homes-versus-other flag on building permits, so a permit counts as a home when its parcel is a residential property class (or when it is a residential EZ permit).
  • Kinds of work within building permits (roofing, decks and garages, pools, fences) are picked out by the short job name.
  • Job value is the value declared on the permit; many trade permits carry none. A final date is the city's end date on a finaled permit.
  • The file has no ZIP code, so there are no ZIP code pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in Lynchburg, VA", https://contractorrecords.com/lynchburg/plumbing-permits, data through September 2026, from City of Lynchburg Community Development building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits: declared value · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Lynchburg issue a year?About 120 a year in Lynchburg: 240 permits issued October 2024 through September 2026, 158 of them in the last 12 months.
  • How long does a plumbing permit take in Lynchburg?The usual one took 10 days from issue to the city's final inspection, and the middle half took 3 to 38 days (73 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Lynchburg file the most plumbing permits?July (130 against an average month of 100); January is the quietest (45). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.