Contractor Records
Home › Lynchburg › Remodels & repairs

Remodel and repair permits in Lynchburg, VA

Data through September 2026 · updated 20 Oct 2026

426 remodel and repair permits were issued in Lynchburg, October 2024 through September 2026: about 213 a year and 14% of all permits. 207 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 5% fewer than the 219 in the 12 months before. The busiest month is October. The usual one took 119 days from issue to the city's final.

426permits issued
207last 12 months
Octbusiest month
119days, usual issue to final
77%finished
$16,808usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 23Oct2024Nov 2024: 11Dec 2024: 14Jan 2025: 20Jan2025Feb 2025: 14Mar 2025: 26Apr 2025: 20May 2025: 20Jun 2025: 21Jul 2025: 14JulAug 2025: 11Sep 2025: 25Oct 2025: 22Nov 2025: 20Dec 2025: 12Jan 2026: 8Jan2026Feb 2026: 24Mar 2026: 16Apr 2026: 22May 2026: 17Jun 2026: 14Jul 2026: 14JulAug 2026: 24Sep 2026: 14
The same numbers as a table
MonthPermits
Oct 202423
Nov 202411
Dec 202414
Jan 202520
Feb 202514
Mar 202526
Apr 202520
May 202520
Jun 202521
Jul 202514
Aug 202511
Sep 202525
Oct 202522
Nov 202520
Dec 202512
Jan 20268
Feb 202624
Mar 202616
Apr 202622
May 202617
Jun 202614
Jul 202614
Aug 202624
Sep 202614

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (127), December the quietest (73). A busy month at the permit counter usually means a longer wait for a contractor.

January: 79 (100 = an average month)February: 107 (100 = an average month)March: 118 (100 = an average month)April: 118 (100 = an average month)May: 104 (100 = an average month)June: 99 (100 = an average month)July: 79 (100 = an average month)August: 99 (100 = an average month)September: 110 (100 = an average month)October: 127 (100 = an average month)127November: 87 (100 = an average month)December: 73 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January79
February107
March118
April118
May104
June99
July79
August99
September110
October127
November87
December73

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 169 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025219
Finished77.2%
Expired1.4%
Usual days, issue to final119
Middle half, days55–213

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 426 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$16,808
Middle half$8,036–$45,000

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building / Renovation30471%
Building / Repair12229%

Download this table (CSV)

How Lynchburg compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Lynchburg GIS open data, Building Permits - Tabluar (ODPDynamic MapServer layer 37, from the city's TRAKiT permit system), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Lynchburg Department of Community Development issued inside the city. Lynchburg is an independent city; homes with a Lynchburg mailing address in Bedford, Campbell or Amherst County get their permits from those counties and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Lynchburg.
  • The file has no homes-versus-other flag on building permits, so a permit counts as a home when its parcel is a residential property class (or when it is a residential EZ permit).
  • Kinds of work within building permits (roofing, decks and garages, pools, fences) are picked out by the short job name.
  • Job value is the value declared on the permit; many trade permits carry none. A final date is the city's end date on a finaled permit.
  • The file has no ZIP code, so there are no ZIP code pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Lynchburg, VA", https://contractorrecords.com/lynchburg/remodel-permits, data through September 2026, from City of Lynchburg Community Development building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits: declared value · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Lynchburg issue a year?About 213 a year in Lynchburg: 426 permits issued October 2024 through September 2026, 207 of them in the last 12 months.
  • How long does a remodel and repair permit take in Lynchburg?The usual one took 119 days from issue to the city's final inspection, and the middle half took 55 to 213 days (169 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Lynchburg file the most remodel and repair permits?October (127 against an average month of 100); December is the quietest (73). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.