New home permits in Philadelphia, PA

Data through September 2026 · updated 19 Oct 2026

1,334 new home permits were issued in Philadelphia, October 2024 through September 2026: about 667 a year and 2% of all permits. 684 new home permits in the last 12 months (Oct 2025–Sep 2026), 5% more than the 650 in the 12 months before. The busiest month is September. The usual one took 303 days from issue to the city's final. 19125 has the most, 197.

1,334permits issued
684last 12 months
Sepbusiest month
303days, usual issue to final
62%finished
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 57Oct2024Nov 2024: 35Dec 2024: 37Jan 2025: 63Jan2025Feb 2025: 54Mar 2025: 65Apr 2025: 50May 2025: 55Jun 2025: 66Jul 2025: 26JulAug 2025: 62Sep 2025: 80Oct 2025: 73Nov 2025: 39Dec 2025: 42Jan 2026: 63Jan2026Feb 2026: 57Mar 2026: 45Apr 2026: 68May 2026: 65Jun 2026: 60Jul 2026: 67JulAug 2026: 44Sep 2026: 61
The same numbers as a table
MonthPermits
Oct 202457
Nov 202435
Dec 202437
Jan 202563
Feb 202554
Mar 202565
Apr 202550
May 202555
Jun 202566
Jul 202526
Aug 202562
Sep 202580
Oct 202573
Nov 202539
Dec 202542
Jan 202663
Feb 202657
Mar 202645
Apr 202668
May 202665
Jun 202660
Jul 202667
Aug 202644
Sep 202661

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (127), November the quietest (67). A busy month at the permit counter usually means a longer wait for a contractor.

January: 113 (100 = an average month)February: 100 (100 = an average month)March: 99 (100 = an average month)April: 106 (100 = an average month)May: 108 (100 = an average month)June: 113 (100 = an average month)July: 84 (100 = an average month)August: 95 (100 = an average month)September: 127 (100 = an average month)127October: 117 (100 = an average month)November: 67 (100 = an average month)December: 71 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January113
February100
March99
April106
May108
June113
July84
August95
September127
October117
November67
December71

Download this table (CSV)

How long a new home permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 398 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025650
Finished62.5%
Expired1.8%
Usual days, issue to final303
Middle half, days242–399

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the city's 1,334 new home permits.

ZIP codePermitsShare
1912519715%
1913317213%
1914615111%
191211138%
191221038%
19134846%
19123675%
19144645%
19148625%
19131393%

Download this table (CSV)

How Philadelphia compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Philadelphia, Licenses and Inspections Building and Zoning Permits, 2007 to present (OpenDataPhilly; Carto table permits), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Philadelphia Department of Licenses and Inspections (L&I) issues inside the city, which is also Philadelphia County: building, plumbing, electrical, mechanical, EZ minor-work, demolition and solar permits for homes. Commercial permits, zoning and use permits, excavation and site permits, certificates of occupancy and event permits in the same file are not counted. Suburbs in Bucks, Montgomery and Delaware counties run their own permit offices and are not in this file.

  • The city's file lists a contractor on most permits, but these pages show permit counts only: there are no contractor lists, rankings or firm pages for Philadelphia.
  • We count residential permits only, as the city's file marks them; a home job filed as a commercial permit is not counted.
  • The city's open permit file has no declared job value, so we show no costs.
  • A new house gets separate building, plumbing, electrical and mechanical permits, so one project can count several times, once under each kind of work.
  • A final date is the day the city marked the permit completed. Permits that expired or were cancelled carry no final date even where the file shows one, because that date is when they lapsed.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in Philadelphia, PA", https://contractorrecords.com/philadelphia/new-home-permits, data through September 2026, from the City of Philadelphia Department of Licenses and Inspections building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: days to final · New homes permits by ZIP code.

Common questions

  • How many new home permits does Philadelphia issue a year?About 667 a year in Philadelphia: 1,334 permits issued October 2024 through September 2026, 684 of them in the last 12 months.
  • How long does a new home permit take in Philadelphia?The usual one took 303 days from issue to the city's final inspection, and the middle half took 242 to 399 days (398 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Philadelphia file the most new home permits?September (127 against an average month of 100); November is the quietest (67). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Philadelphia?19125, with 197 of the 1,334 (15%); then 19133 (172).