Contractor Records
Home › Philadelphia › Plumbing

Plumbing permits in Philadelphia, PA

Data through September 2026 · updated 19 Oct 2026

20,008 plumbing permits were issued in Philadelphia, October 2024 through September 2026: about 10,004 a year and 35% of all permits. 10,244 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 5% more than the 9,764 in the 12 months before. The busiest month is March. The usual one took 41 days from issue to the city's final. 19146 has the most, 1,188.

20,008permits issued
10,244last 12 months
Marbusiest month
41days, usual issue to final
78%finished
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 835Oct2024Nov 2024: 719Dec 2024: 794Jan 2025: 848Jan2025Feb 2025: 689Mar 2025: 1,007Apr 2025: 902May 2025: 820Jun 2025: 903Jul 2025: 795JulAug 2025: 746Sep 2025: 706Oct 2025: 1,055Nov 2025: 666Dec 2025: 806Jan 2026: 701Jan2026Feb 2026: 786Mar 2026: 1,058Apr 2026: 963May 2026: 893Jun 2026: 877Jul 2026: 870JulAug 2026: 829Sep 2026: 740
The same numbers as a table
MonthPermits
Oct 2024835
Nov 2024719
Dec 2024794
Jan 2025848
Feb 2025689
Mar 20251,007
Apr 2025902
May 2025820
Jun 2025903
Jul 2025795
Aug 2025746
Sep 2025706
Oct 20251,055
Nov 2025666
Dec 2025806
Jan 2026701
Feb 2026786
Mar 20261,058
Apr 2026963
May 2026893
Jun 2026877
Jul 2026870
Aug 2026829
Sep 2026740

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (124), November the quietest (83). A busy month at the permit counter usually means a longer wait for a contractor.

January: 93 (100 = an average month)February: 88 (100 = an average month)March: 124 (100 = an average month)124April: 112 (100 = an average month)May: 103 (100 = an average month)June: 107 (100 = an average month)July: 100 (100 = an average month)August: 94 (100 = an average month)September: 87 (100 = an average month)October: 113 (100 = an average month)November: 83 (100 = an average month)December: 96 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January93
February88
March124
April112
May103
June107
July100
August94
September87
October113
November83
December96

Download this table (CSV)

How long a plumbing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 7,479 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20259,764
Finished78.0%
Expired12.4%
Usual days, issue to final41
Middle half, days13–190

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the city's 20,008 plumbing permits.

ZIP codePermitsShare
191461,1886%
191341,0835%
191431,0075%
191489385%
191258894%
191408204%
191317904%
191217504%
191327094%
191456813%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Plumbing: Alterations15,72279%
Plumbing: New Construction or Additions4,28621%

Download this table (CSV)

How Philadelphia compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Philadelphia, Licenses and Inspections Building and Zoning Permits, 2007 to present (OpenDataPhilly; Carto table permits), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Philadelphia Department of Licenses and Inspections (L&I) issues inside the city, which is also Philadelphia County: building, plumbing, electrical, mechanical, EZ minor-work, demolition and solar permits for homes. Commercial permits, zoning and use permits, excavation and site permits, certificates of occupancy and event permits in the same file are not counted. Suburbs in Bucks, Montgomery and Delaware counties run their own permit offices and are not in this file.

  • The city's file lists a contractor on most permits, but these pages show permit counts only: there are no contractor lists, rankings or firm pages for Philadelphia.
  • We count residential permits only, as the city's file marks them; a home job filed as a commercial permit is not counted.
  • The city's open permit file has no declared job value, so we show no costs.
  • A new house gets separate building, plumbing, electrical and mechanical permits, so one project can count several times, once under each kind of work.
  • A final date is the day the city marked the permit completed. Permits that expired or were cancelled carry no final date even where the file shows one, because that date is when they lapsed.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in Philadelphia, PA", https://contractorrecords.com/philadelphia/plumbing-permits, data through September 2026, from the City of Philadelphia Department of Licenses and Inspections building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits by ZIP code · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Philadelphia issue a year?About 10,004 a year in Philadelphia: 20,008 permits issued October 2024 through September 2026, 10,244 of them in the last 12 months.
  • How long does a plumbing permit take in Philadelphia?The usual one took 41 days from issue to the city's final inspection, and the middle half took 13 to 190 days (7,479 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Philadelphia file the most plumbing permits?March (124 against an average month of 100); November is the quietest (83). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in Philadelphia?19146, with 1,188 of the 20,008 (6%); then 19134 (1,083).