Contractor Records
Home › Philadelphia › HVAC

HVAC permits in Philadelphia, PA

Data through September 2026 · updated 19 Oct 2026

6,884 HVAC permits were issued in Philadelphia, October 2024 through September 2026: about 3,442 a year and 12% of all permits. 3,510 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 4% more than the 3,374 in the 12 months before. The busiest month is January. The usual one took 162 days from issue to the city's final. 19146 has the most, 480.

6,884permits issued
3,510last 12 months
Janbusiest month
162days, usual issue to final
66%finished
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 232Oct2024Nov 2024: 284Dec 2024: 340Jan 2025: 396Jan2025Feb 2025: 293Mar 2025: 346Apr 2025: 329May 2025: 277Jun 2025: 232Jul 2025: 212JulAug 2025: 215Sep 2025: 218Oct 2025: 300Nov 2025: 285Dec 2025: 306Jan 2026: 330Jan2026Feb 2026: 332Mar 2026: 336Apr 2026: 321May 2026: 345Jun 2026: 242Jul 2026: 262JulAug 2026: 246Sep 2026: 205
The same numbers as a table
MonthPermits
Oct 2024232
Nov 2024284
Dec 2024340
Jan 2025396
Feb 2025293
Mar 2025346
Apr 2025329
May 2025277
Jun 2025232
Jul 2025212
Aug 2025215
Sep 2025218
Oct 2025300
Nov 2025285
Dec 2025306
Jan 2026330
Feb 2026332
Mar 2026336
Apr 2026321
May 2026345
Jun 2026242
Jul 2026262
Aug 2026246
Sep 2026205

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). January is the busiest (127), September the quietest (74). A busy month at the permit counter usually means a longer wait for a contractor.

January: 127 (100 = an average month)127February: 109 (100 = an average month)March: 119 (100 = an average month)April: 113 (100 = an average month)May: 108 (100 = an average month)June: 83 (100 = an average month)July: 83 (100 = an average month)August: 80 (100 = an average month)September: 74 (100 = an average month)October: 93 (100 = an average month)November: 99 (100 = an average month)December: 113 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January127
February109
March119
April113
May108
June83
July83
August80
September74
October93
November99
December113

Download this table (CSV)

How long an HVAC permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 2,199 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20253,374
Finished65.8%
Expired21.0%
Usual days, issue to final162
Middle half, days83–253

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 6,884 HVAC permits.

ZIP codePermitsShare
191464807%
191434206%
191254006%
191483275%
191343255%
191313084%
191213064%
191402614%
191452604%
191322584%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Mechanical: Addition and/or Alterations5,38378%
Mechanical: New Construction1,50122%

Download this table (CSV)

How Philadelphia compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Philadelphia, Licenses and Inspections Building and Zoning Permits, 2007 to present (OpenDataPhilly; Carto table permits), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Philadelphia Department of Licenses and Inspections (L&I) issues inside the city, which is also Philadelphia County: building, plumbing, electrical, mechanical, EZ minor-work, demolition and solar permits for homes. Commercial permits, zoning and use permits, excavation and site permits, certificates of occupancy and event permits in the same file are not counted. Suburbs in Bucks, Montgomery and Delaware counties run their own permit offices and are not in this file.

  • The city's file lists a contractor on most permits, but these pages show permit counts only: there are no contractor lists, rankings or firm pages for Philadelphia.
  • We count residential permits only, as the city's file marks them; a home job filed as a commercial permit is not counted.
  • The city's open permit file has no declared job value, so we show no costs.
  • A new house gets separate building, plumbing, electrical and mechanical permits, so one project can count several times, once under each kind of work.
  • A final date is the day the city marked the permit completed. Permits that expired or were cancelled carry no final date even where the file shows one, because that date is when they lapsed.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in Philadelphia, PA", https://contractorrecords.com/philadelphia/hvac-permits, data through September 2026, from the City of Philadelphia Department of Licenses and Inspections building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: days to final · HVAC permits by ZIP code · HVAC permits by permit type.

Common questions

  • How many HVAC permits does Philadelphia issue a year?About 3,442 a year in Philadelphia: 6,884 permits issued October 2024 through September 2026, 3,510 of them in the last 12 months.
  • How long does an HVAC permit take in Philadelphia?The usual one took 162 days from issue to the city's final inspection, and the middle half took 83 to 253 days (2,199 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Philadelphia file the most HVAC permits?January (127 against an average month of 100); September is the quietest (74). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Philadelphia?19146, with 480 of the 6,884 (7%); then 19143 (420).