Contractor Records
Home › Richmond

Richmond, CA building permits

Data through April 2025 · updated 21 Oct 2026

6,783 building permits were issued in Richmond from May 2023 to April 2025, about 3,392 a year. Electrical permits lead with 1,176, then remodels & repairs (1,159) and roofing (1,054). 79% were for homes. The city's file doesn't name contractors, so we can't rank, compare or profile firms here: these pages show what was built, where, when and how fast the city signed it off.

6,783permits issued
3,392a year
79%for homes
76%finished (May 2023–Apr 2024 permits)
60days, usual issue to final
Apr 2025records through

What gets built here

What this page can and can't show

  • ✓Permits the city issued, by kind of work, month and ZIP code.
  • ✓How long a permit takes from issue to the city's final inspection.
  • ✓Which permits finished, are still open or expired.
  • ✓What the job was declared at on the permit.
  • Who did the work. The city's file doesn't name contractors, so we can't rank, compare or profile firms here.
  • Street addresses or owners. We publish counts and permit rows without them.

Building and trade permits the City of Richmond issued inside the city limits, including SolarAPP+ solar permits; a few city parcels carry an El Sobrante or San Pablo mailing address. Encroachment, fire, wastewater, rent-control and business permits, plan-check records and revisions of earlier permits are left out. Unincorporated North Richmond and El Sobrante are permitted by Contra Costa County and are not in this file.

Hiring someone here?

The permit file can't tell you who does good work. Ask for the contractor's license number and look it up at the California Contractors State License Board, then ask the city whether they pulled the permit for your job.

How to check a contractor's license in California →

Permits by kind of work

Permits issued May 2023 through April 2025, every kind of work with 100 or more. Last 12 months on file is May 2024–Apr 2025. Homes is the share issued as residential permits.

Kind of workPermitsShareLast 12 mo
Electrical1,17617%585
Remodels & repairs1,15917%531
Roofing1,05416%525
Solar1,00115%497
Plumbing72611%322
HVAC5498%271
New homes1482%76
ADUs & casitas1352%59
Other75611%400

Fewer than 100 permits, so no row: additions (47), demolition (17), fences & walls (9), garages, sheds & shade structures (4), pools & spas (2).

Download this table (CSV)

Guides for Richmond

Local permit rules and lookups, each with Richmond's own permit numbers.

Nearby permit data

Permit data for other places in the Bay Area. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Transparent Richmond, PermitTrak (Socrata dataset qg2r-652v), read 21 Oct 2026. We count permits issued May 2023 through April 2025; denied and withdrawn permits are left out.

Building and trade permits the City of Richmond issued inside the city limits, including SolarAPP+ solar permits; a few city parcels carry an El Sobrante or San Pablo mailing address. Encroachment, fire, wastewater, rent-control and business permits, plan-check records and revisions of earlier permits are left out. Unincorporated North Richmond and El Sobrante are permitted by Contra Costa County and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Richmond.
  • The city's published file holds no building permit issued after April 2025, although it is still updated for other permit kinds, so these pages end with April 2025.
  • Finished means the city's status is Finaled or Closed; a final date comes from the city's finaled date. Expired permits lapsed without a final inspection; cancelled permits are not counted.
  • The value is the job value declared on the permit.
  • Homes are the permits the city files as residential (building, electrical, plumbing and mechanical) plus SolarAPP+ rooftop solar permits.
  • Solar battery (Powerwall) permits without panels count as electrical; seismic retrofits and alteration or repair permits count as remodels.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Richmond, CA building permits", https://contractorrecords.com/richmond-ca/, data through April 2025, from City of Richmond Building Services building-permit records.

Link to a table: By kind of work · Browse the permits · Permits each month.

Download the tables (CSV): Permits by kind of work · Permits in the last 12 months on file.

Common questions

  • How many building permits does Richmond issue a year?About 3,392 a year in Richmond: 6,783 permits issued May 2023 through April 2025, 3,298 of them in the last 12 months on file (to April 2025). That counts the permits the city issued, homes and commercial, not denied or withdrawn applications.
  • Can I find a contractor's permits in Richmond?Not from this file: the city publishes its permits without the contractor's name, so we can't list or rank firms. Check a license at the California Contractors State License Board and ask the contractor for the permit number of a past job.
  • What do people build most in Richmond?Electrical: 1,176 of the 6,783 permits (17%), then remodels & repairs (1,159), roofing (1,054), May 2023 through April 2025.
  • How long does a building permit take in Richmond?The usual permit took 60 days from issue to the city's final (middle half: 27 to 147 days), from 2,631 permits issued May 2023–Apr 2024 that reached a final. Each kind of work →
  • How do I look up a building permit in Richmond?Filter the permit list on this page by month, kind of work and ZIP code to see what was issued. For one property's permits, search the city's own records by address or permit number; we don't publish addresses. How to look up a permit in Richmond →
  • How many permits were issued in Richmond last month?248 in April 2025, the last full month on file; 3,298 over the last 12 months on file (to April 2025).

Browse the permits

Browse 6,783 permits

Every permit in the file issued May 2023 through April 2025, newest first. Pick a month, a kind of work, a ZIP code or a status. Each row is one permit: no street address, no names.

The list loads as you reach it (6,783 permits).

IssuedKind of workCity permit typeStatusZIP

Permits each month, the last 12 months on file

Permits issued each month and the kind of work with the most. A month opens its permits in the list above.

MonthPermitsTop kind of work
Apr 2025248Solar (60)
Mar 2025254Remodels & repairs (50)
Feb 2025273Electrical (57)
Jan 2025267Roofing (59)
Dec 2024196Remodels & repairs (40)
Nov 2024227Electrical (40)
Oct 2024355Electrical (63)
Sep 2024315Solar (70)
Aug 2024341Remodels & repairs (64)
Jul 2024338Solar (50)
Jun 2024213Remodels & repairs (51)
May 2024271Electrical (53)

Download this table (CSV)