Contractor Records
Home › Riverside County › Garages, sheds & shade structures

Garage, shed and shade structure permits in unincorporated Riverside County, CA

Data through September 2026 · updated 23 Oct 2026

1,657 garage, shed and shade structure permits were issued in unincorporated Riverside County, October 2024 through September 2026: about 828 a year and 6% of all permits. 757 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 16% fewer than the 900 in the 12 months before. The busiest month is April. The usual one took 56 days from issue to the county's final.

1,657permits issued
757last 12 months
Aprbusiest month
56days, usual issue to final
78%finished
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 72Oct2024Nov 2024: 72Dec 2024: 79Jan 2025: 62Jan2025Feb 2025: 80Mar 2025: 90Apr 2025: 71May 2025: 93Jun 2025: 59Jul 2025: 75JulAug 2025: 64Sep 2025: 83Oct 2025: 50Nov 2025: 57Dec 2025: 51Jan 2026: 52Jan2026Feb 2026: 50Mar 2026: 78Apr 2026: 102May 2026: 45Jun 2026: 70Jul 2026: 66JulAug 2026: 62Sep 2026: 74
The same numbers as a table
MonthPermits
Oct 202472
Nov 202472
Dec 202479
Jan 202562
Feb 202580
Mar 202590
Apr 202571
May 202593
Jun 202559
Jul 202575
Aug 202564
Sep 202583
Oct 202550
Nov 202557
Dec 202551
Jan 202652
Feb 202650
Mar 202678
Apr 2026102
May 202645
Jun 202670
Jul 202666
Aug 202662
Sep 202674

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (125), January the quietest (83). A busy month at the permit counter usually means a longer wait for a contractor.

January: 83 (100 = an average month)February: 94 (100 = an average month)March: 122 (100 = an average month)April: 125 (100 = an average month)125May: 100 (100 = an average month)June: 93 (100 = an average month)July: 102 (100 = an average month)August: 91 (100 = an average month)September: 114 (100 = an average month)October: 88 (100 = an average month)November: 93 (100 = an average month)December: 94 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January83
February94
March122
April125
May100
June93
July102
August91
September114
October88
November93
December94

Download this table (CSV)

How long a garage, shed and shade structure permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 699 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025900
Finished77.7%
Expired13.8%
Usual days, issue to final56
Middle half, days25–146

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Patio Cover - Engineered90755%
Bbq Island22514%
Accessory Building 1,000 Sq Ft19212%
Accessory Building 1,001-3,000 Sq Ft1429%
Solid Patio Cover - County Standard543%
Accessory Building Over 3,000 Sq Ft382%
Accessory Building Final Inspection241%
Accessory Attached Mobile221%
Accessory Detached Residential14under 1%
Patio Cover Final Inspection13under 1%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Los Angeles and the Inland Empire. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Riverside County GIS Open Data, PLUS_ACTIVITIES (Public Land Use System), Building department records, read 23 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits Riverside County Building and Safety issues for unincorporated land only: places such as Thermal, Mecca, Winchester, French Valley, Mead Valley, Anza, Aguanga, Temescal Valley and the Temecula wine country. Riverside, Moreno Valley, Corona, Temecula, Murrieta, Palm Springs and the county's other incorporated cities (28 in all) run their own permit offices and are not in this file. Blythe permits, which the county keeps under their own permit type, are left out too.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Riverside County.
  • The file has no declared job value, so we show no costs.
  • The file gives a parcel number but no ZIP code, so there are no ZIP code pages.
  • Tract builders file one permit per house, so a new subdivision shows as many new-home permits, often with a matching repeat-production wall permit for each lot.
  • Battery storage permits are counted as electrical; rooftop and ground-mount solar as solar.
  • A final date is the county's completed date on a permit marked Final. Administratively closed permits count as expired.
  • Grading, hourly inspection, agricultural fee-only and legacy converted records are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in unincorporated Riverside County, CA", https://contractorrecords.com/riverside-county/accessory-permits, data through September 2026, from Riverside County Building and Safety building-permit records.

Link to a table: By month · Season · Days to final · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: days to final · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Riverside County issue a year?About 828 a year in unincorporated Riverside County: 1,657 permits issued October 2024 through September 2026, 757 of them in the last 12 months.
  • How long does a garage, shed and shade structure permit take in Riverside County?The usual one took 56 days from issue to the county's final inspection, and the middle half took 25 to 146 days (699 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Riverside County file the most garage, shed and shade structure permits?April (125 against an average month of 100); January is the quietest (83). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.