HVAC permits in unincorporated Riverside County, CA

Data through September 2026 · updated 23 Oct 2026

1,833 HVAC permits were issued in unincorporated Riverside County, October 2024 through September 2026: about 916 a year and 7% of all permits. 939 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 5% more than the 894 in the 12 months before. The busiest month is July. The usual one took 68 days from issue to the county's final.

1,833permits issued
939last 12 months
Julbusiest month
68days, usual issue to final
45%finished
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 90Oct2024Nov 2024: 56Dec 2024: 68Jan 2025: 55Jan2025Feb 2025: 59Mar 2025: 54Apr 2025: 73May 2025: 91Jun 2025: 77Jul 2025: 107JulAug 2025: 79Sep 2025: 85Oct 2025: 50Nov 2025: 64Dec 2025: 60Jan 2026: 49Jan2026Feb 2026: 57Mar 2026: 75Apr 2026: 85May 2026: 82Jun 2026: 81Jul 2026: 142JulAug 2026: 104Sep 2026: 90
The same numbers as a table
MonthPermits
Oct 202490
Nov 202456
Dec 202468
Jan 202555
Feb 202559
Mar 202554
Apr 202573
May 202591
Jun 202577
Jul 2025107
Aug 202579
Sep 202585
Oct 202550
Nov 202564
Dec 202560
Jan 202649
Feb 202657
Mar 202675
Apr 202685
May 202682
Jun 202681
Jul 2026142
Aug 2026104
Sep 202690

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (163), January the quietest (68). A busy month at the permit counter usually means a longer wait for a contractor.

January: 68 (100 = an average month)February: 76 (100 = an average month)March: 84 (100 = an average month)April: 103 (100 = an average month)May: 113 (100 = an average month)June: 103 (100 = an average month)July: 163 (100 = an average month)163August: 120 (100 = an average month)September: 115 (100 = an average month)October: 92 (100 = an average month)November: 79 (100 = an average month)December: 84 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January68
February76
March84
April103
May113
June103
July163
August120
September115
October92
November79
December84

Download this table (CSV)

How long an HVAC permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 403 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025894
Finished45.1%
Expired54.3%
Usual days, issue to final68
Middle half, days35–148

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Mechanical1,80498%
Commercial Mechanical282%
Other Construction1under 1%

Download this table (CSV)

How Riverside County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

HVAC permits for other places in Los Angeles and the Inland Empire. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Riverside County GIS Open Data, PLUS_ACTIVITIES (Public Land Use System), Building department records, read 23 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits Riverside County Building and Safety issues for unincorporated land only: places such as Thermal, Mecca, Winchester, French Valley, Mead Valley, Anza, Aguanga, Temescal Valley and the Temecula wine country. Riverside, Moreno Valley, Corona, Temecula, Murrieta, Palm Springs and the county's other incorporated cities (28 in all) run their own permit offices and are not in this file. Blythe permits, which the county keeps under their own permit type, are left out too.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Riverside County.
  • The file has no declared job value, so we show no costs.
  • The file gives a parcel number but no ZIP code, so there are no ZIP code pages.
  • Tract builders file one permit per house, so a new subdivision shows as many new-home permits, often with a matching repeat-production wall permit for each lot.
  • Battery storage permits are counted as electrical; rooftop and ground-mount solar as solar.
  • A final date is the county's completed date on a permit marked Final. Administratively closed permits count as expired.
  • Grading, hourly inspection, agricultural fee-only and legacy converted records are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in unincorporated Riverside County, CA", https://contractorrecords.com/riverside-county/hvac-permits, data through September 2026, from Riverside County Building and Safety building-permit records.

Link to a table: By month · Season · Days to final · Permit types.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: days to final · HVAC permits by permit type.

Common questions

  • How many HVAC permits does Riverside County issue a year?About 916 a year in unincorporated Riverside County: 1,833 permits issued October 2024 through September 2026, 939 of them in the last 12 months.
  • How long does an HVAC permit take in Riverside County?The usual one took 68 days from issue to the county's final inspection, and the middle half took 35 to 148 days (403 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Riverside County file the most HVAC permits?July (163 against an average month of 100); January is the quietest (68). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.