Contractor Records
Home › Guides › Do I need a permit for a screen enclosure in Cape Coral? New vs rescreen, who applies, fees and inspections

Do I need a permit for a screen enclosure in Cape Coral? New vs rescreen, who applies, fees and inspections

Yes: Cape Coral requires a permit both to build a new screen enclosure and to replace an existing one, and both need an architectural structural plan; the 2026 fees are $168 for a new residential enclosure and $284 for a replacement or screen room pan, plus the state's 2.5% surcharge. The City issued 2,115 screen enclosure permits on homes from January 2025 to September 2026; the usual one was filed at $20,250 and closed 52 days after issue.

By Contractor Records · data through October 19, 2026

The Cape Coral rule: new vs replacement

Both guidelines are on the City's Permit Document Center (revised January 2026, read 23 October 2026). They use the same "Screen Enclosure" application on the CSS portal, "With or without a pan roof":

Item New enclosure Replacement
"Replacement" field in the application No Yes
Who can apply CGC, CBC, CRC, structural aluminum or screen enclosure specialty contractor (SCC), owner-builder Same
Always required Site plan, architectural structural plan, impervious surface calculation worksheet, burrowing owl/gopher tortoise affidavit Site plan, architectural structural plan
May be required Notice of Commencement; FEMA packet or elevation certificate if pan roof; eagle management affidavit Same
Review Building, zoning, floodplain if pan roof, environmental if applicable Same
Inspections Notice of Commencement if applicable; Concrete Slab if applicable; Aluminum Structure Notice of Commencement if applicable; Aluminum Structure

A new enclosure "can include a concrete slab and footers" on the same permit. The impervious surface worksheet and the wildlife affidavit apply to new ones only, because a new cage and slab add coverage to the lot. A solid pan roof brings the floodplain review and flood documents into it.

Neither guideline mentions swapping screen panels alone. If that is all your job is, ask the Permitting Services Division before treating it as exempt.

What it costs

From the City's Miscellaneous Permit Fee Schedule, effective 1 January 2026; both enclosure lines are marked for the 2.5% state surcharge:

Fee Amount
Enclosure – Residential (New Construction) $168.00 + 2.5%
Enclosure Replacement/Screen Room Pan $284.00 + 2.5%
Floodplain review (pan roof) $55.00 per review
Slabs – Residential (other than new construction), if permitted separately $113.00
Re-inspection, first / second $48.00 / $67.00

The schedule takes 15% off building permit fees when a private provider is used for plan review or inspections.

How to apply

  1. Get the architectural structural plan and site plan from the enclosure company or your designer.
  2. In EnerGov Citizen Self-Service, choose Screen Enclosure and answer the replacement question. Owner-builders add the owner-builder affidavit.
  3. Book the slab inspection (new cage with slab) and the Aluminum Structure inspection in the same portal.

What 2,115 Cape Coral screen enclosure permits show

Measure Cape Coral screen enclosures
Permits on homes, January 2025 to September 2026 2,115
Firms 235
Firms with a permit in the last 12 months 184
Usual filed value (middle half of firms) $20,250 ($14,400 to $22,037)
Closed (permits a year or more old) 97.9%
Usual days from issue to close 52
Share of permits held by the 5 busiest firms 45.8%
Firms matched to an active DBPR license 97.9%
Busiest / quietest month April (116) / December (71)

Nearly every enclosure permit here closes: 97.9%, usually 52 days after issue. Some of the busiest firms on this list are pool builders, so ask a pool builder whether the cage is on its own permit or on the pool's. April runs at 116 against an average month of 100 and December at 71. Monthly counts are on Cape Coral permit statistics.

See every Cape Coral screen enclosure company by permits closed →

Before you hire

Compare firms on the Cape Coral screen enclosure list and check the license in the Cape Coral contractor license lookup. If the cage comes with a new pool, the pool permit is covered in Cape Coral pool permit and hiring a pool builder in Cape Coral. Past permits on your house are in Cape Coral building permit search.

What this does not tell you

The City's open permit file starts in January 2025, so the closed share rests on 2025 permits only. Filed values are the contractor's figure. A closed permit means the Aluminum Structure inspection passed.

How we know this

Permit requirements, applicants and inspections are quoted from the City of Cape Coral's residential Screen Enclosure (New) and (Replacement) guidelines, revised January 2026 and read 23 October 2026; fees from the Miscellaneous Permit Fee Schedule effective 1 January 2026. Counts are City of Cape Coral permits on residential parcels classified as screen enclosures, January 2025 to September 2026; closed share uses permits a year or more old.

Numbers come from City of Cape Coral building permits (the city's open permit table starts January 2025), data through October 19, 2026. Nobody paid to be on this page and nobody can.

Questions

  • Do I need a permit for a screen enclosure in Cape Coral?

    Yes, for a new enclosure and for replacing an existing one. Both use the City's Screen Enclosure application in EnerGov, answering No or Yes to the replacement question, and both need a site plan and an architectural structural plan.

  • How much is a screen enclosure permit in Cape Coral?

    The City's 2026 schedule lists Enclosure – Residential (New Construction) at $168 and Enclosure Replacement/Screen Room Pan at $284, both plus the 2.5% state surcharge. A floodplain review, needed with a pan roof, is $55.

  • Who can pull a screen enclosure permit in Cape Coral?

    A general, building or residential contractor, a structural aluminum or screen enclosure specialty contractor, or the owner as owner-builder.

  • Do I need a permit to rescreen a pool cage in Cape Coral?

    The City's guidelines cover building a new enclosure and replacing an existing one; neither mentions replacing screen panels alone. Ask the Permitting Services Division before assuming a rescreen is exempt.

  • How long does a screen enclosure permit take in Cape Coral?

    The usual Cape Coral screen enclosure permit in our file closed 52 days after it was issued, and 97.9% of those a year or more old were closed.

Build your own list

Every firm with that kind of permit on record. Pick what you value. The list moves.