892 building permits were issued in ZIP code 90011 by the City of Los Angeles Department of Building and Safety, October 2024 through September 2026: under 1% of the 99,412 in the City of Los Angeles, the 57th busiest ZIP code. ADU and casita permits lead with 199. 432 permits in the last 12 months (Oct 2025–Sep 2026), 6% fewer than the 460 in the 12 months before. Permits from a city that runs its own permit office are not counted.

892permits in 90011
432last 12 months
75%for homes
97days, usual issue to final
Sep 2026records through

Permits in 90011 by kind of work

Share here is the part of the 892 permits in 90011; citywide is the same for all of the City of Los Angeles.

Kind of workPermitsShare hereCitywide
ADUs & casitas19922%13%
Roofing19422%26%
Remodels & repairs17720%22%
Demolition728%3%
Additions344%5%
New homes324%3%
Fences & walls7under 1%2%
Garages, sheds & shade structures5under 1%under 1%
HVAC3under 1%under 1%
Solar2under 1%under 1%
Other16719%20%

Download this table (CSV)

Permits in 90011 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)399396
202512455455
2026 (through September)9338451

Download this table (CSV)

How permits in 90011 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure90011Citywide
Permits issued Oct 2024–Sep 202546049,737
Finished63.5%67.4%
Expired0.0%0.1%
Usual days, issue to final9790

Download this table (CSV)

How these numbers are made

Source: LADBS, Building and Safety - Building Permits Issued from 2020 to Present (N), data.lacity.org, read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building permits the City of Los Angeles Department of Building and Safety (LADBS) issues inside the city limits only. Other cities in Los Angeles County (Long Beach, Pasadena, Santa Monica, Glendale and the rest) and unincorporated county land run their own permit offices and are not in this file. Electrical, plumbing and mechanical permits are kept by LADBS in separate files and are not counted here, so those trades show only when a building permit names them.

  • The city's open permit file names no contractor, so there are no contractor lists, rankings or firm pages for Los Angeles.
  • Only building permits are counted. LADBS keeps electrical and mechanical (heating, air conditioning, plumbing) permits in separate files, so solar, HVAC, plumbing and electrical work is undercounted: it shows only when a building permit names it.
  • Supplemental permits (a revision or transfer of an earlier permit) and grading permits are left out.
  • The value is the job valuation the permit was issued on, which sets the fee. It is not a final cost.
  • A final date is the date the permit was finaled or its certificate of occupancy issued.
  • Permits after the January 2025 wildfires include rebuilding work in Pacific Palisades and other burn areas.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 90011, the City of Los Angeles", https://contractorrecords.com/los-angeles/zip/90011, data through September 2026, from the City of Los Angeles Department of Building and Safety building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 90011 by kind of work · Permits in 90011 by year · Permits in 90011: finished and days to final.

Common questions

  • How many building permits were issued in 90011?892 permits issued by the city in ZIP code 90011, October 2024 through September 2026: 199 ADUs & casitas, 194 roofing, 177 remodels & repairs. 432 were in the last 12 months.
  • What is built most in 90011?ADUs & casitas: 199 of the 892 permits (22%), against 13% citywide.
  • How long does a permit take in 90011?The usual permit issued here Oct 2024–Sep 2025 took 97 days from issue to final (292 permits with a final date), against 90 days citywide.