Contractor Records
Home › Los Angeles › ZIP 91304

Building permits in 91304, the City of Los Angeles

Data through September 2026 · updated 18 Oct 2026

1,170 building permits were issued in ZIP code 91304 by the City of Los Angeles Department of Building and Safety, October 2024 through September 2026: 1% of the 99,412 in the City of Los Angeles, the 31st busiest ZIP code. Roofing permits lead with 432. 634 permits in the last 12 months (Oct 2025–Sep 2026), 18% more than the 536 in the 12 months before. Permits from a city that runs its own permit office are not counted.

1,170permits in 91304
634last 12 months
83%for homes
57days, usual issue to final
Sep 2026records through

Permits in 91304 by kind of work

Share here is the part of the 1,170 permits in 91304; citywide is the same for all of the City of Los Angeles.

Kind of workPermitsShare hereCitywide
Roofing43237%26%
Remodels & repairs26723%22%
ADUs & casitas21118%13%
Additions494%5%
Pools & spas353%4%
New homes10under 1%3%
Fences & walls8under 1%2%
Demolition8under 1%3%
Garages, sheds & shade structures4under 1%under 1%
Solar4under 1%under 1%
HVAC3under 1%under 1%
Other13912%20%

Download this table (CSV)

Permits in 91304 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)3149596
202512556556
2026 (through September)9465620

Download this table (CSV)

How permits in 91304 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure91304Citywide
Permits issued Oct 2024–Sep 202553649,737
Finished71.1%67.4%
Expired0.0%0.1%
Usual days, issue to final5790

Download this table (CSV)

How these numbers are made

Source: LADBS, Building and Safety - Building Permits Issued from 2020 to Present (N), data.lacity.org, read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building permits the City of Los Angeles Department of Building and Safety (LADBS) issues inside the city limits only. Other cities in Los Angeles County (Long Beach, Pasadena, Santa Monica, Glendale and the rest) and unincorporated county land run their own permit offices and are not in this file. Electrical, plumbing and mechanical permits are kept by LADBS in separate files and are not counted here, so those trades show only when a building permit names them.

  • The city's open permit file names no contractor, so there are no contractor lists, rankings or firm pages for Los Angeles.
  • Only building permits are counted. LADBS keeps electrical and mechanical (heating, air conditioning, plumbing) permits in separate files, so solar, HVAC, plumbing and electrical work is undercounted: it shows only when a building permit names it.
  • Supplemental permits (a revision or transfer of an earlier permit) and grading permits are left out.
  • The value is the job valuation the permit was issued on, which sets the fee. It is not a final cost.
  • A final date is the date the permit was finaled or its certificate of occupancy issued.
  • Permits after the January 2025 wildfires include rebuilding work in Pacific Palisades and other burn areas.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 91304, the City of Los Angeles", https://contractorrecords.com/los-angeles/zip/91304, data through September 2026, from the City of Los Angeles Department of Building and Safety building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 91304 by kind of work · Permits in 91304 by year · Permits in 91304: finished and days to final.

Common questions

  • How many building permits were issued in 91304?1,170 permits issued by the city in ZIP code 91304, October 2024 through September 2026: 432 roofing, 267 remodels & repairs, 211 ADUs & casitas. 634 were in the last 12 months.
  • What is built most in 91304?Roofing: 432 of the 1,170 permits (37%), against 26% citywide.
  • How long does a permit take in 91304?The usual permit issued here Oct 2024–Sep 2025 took 57 days from issue to final (381 permits with a final date), against 90 days citywide.
  • Who did the work in 91304?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.