438 garage, shed and shade structure permits were issued in the City of Spokane, April 2024 through March 2026: about 219 a year and 1% of all permits. 192 garage, shed and shade structure permits in the last 12 months on file (Apr 2025–Mar 2026), 22% fewer than the 246 in the 12 months before. The busiest month is May.

438permits issued
192last 12 months on file
Maybusiest month
71%finished
Mar 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, April 2024 through March 2026.

Apr 2024: 19Apr2024May 2024: 23Jun 2024: 15Jul 2024: 26JulAug 2024: 26Sep 2024: 26Oct 2024: 31Nov 2024: 11Dec 2024: 15Jan 2025: 11Jan2025Feb 2025: 11Mar 2025: 32Apr 2025: 26May 2025: 29Jun 2025: 14Jul 2025: 23JulAug 2025: 19Sep 2025: 13Oct 2025: 19Nov 2025: 12Dec 2025: 6Jan 2026: 9Jan2026Feb 2026: 7Mar 2026: 15
The same numbers as a table
MonthPermits
Apr 202419
May 202423
Jun 202415
Jul 202426
Aug 202426
Sep 202426
Oct 202431
Nov 202411
Dec 202415
Jan 202511
Feb 202511
Mar 202532
Apr 202526
May 202529
Jun 202514
Jul 202523
Aug 202519
Sep 202513
Oct 202519
Nov 202512
Dec 20256
Jan 20269
Feb 20267
Mar 202615

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). May is the busiest (142), February the quietest (49). A busy month at the permit counter usually means a longer wait for a contractor.

January: 55 (100 = an average month)February: 49 (100 = an average month)March: 129 (100 = an average month)April: 123 (100 = an average month)May: 142 (100 = an average month)142June: 79 (100 = an average month)July: 134 (100 = an average month)August: 123 (100 = an average month)September: 107 (100 = an average month)October: 137 (100 = an average month)November: 63 (100 = an average month)December: 58 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January55
February49
March129
April123
May142
June79
July134
August123
September107
October137
November63
December58

Download this table (CSV)

How many garage, shed and shade structure permits get finished

Permits issued Apr 2024–Mar 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Apr 2024–Mar 2025246
Finished71.1%

Download this table (CSV)

How these numbers are made

Source: City of Spokane GIS, Permit (Building and Engineering Permits) layer behind the Permit Activity Map, read 19 Oct 2026. We count permits issued April 2024 through March 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Spokane issues inside city limits: residential and commercial building, electrical, mechanical, plumbing, roofing/siding/window, solar, fence, demolition, pool, manufactured-home and sign permits. Side sewer, water and right-of-way permits from the city's Engineering side, planning cases and short-term rental licences are not counted. Spokane Valley, Liberty Lake and unincorporated Spokane County run their own permit offices and are not in this file.

  • The city's layer names no contractor, so there are no contractor lists, rankings or firm pages for Spokane.
  • The layer has no issue date, so a permit is dated by the day it was opened; permits the layer still shows in review are not counted.
  • The city keeps only the last three calendar years in this layer and last refreshed it in April 2026, so these pages end with March 2026.
  • The layer has no job value and no final inspection date, so we show no costs and no time to final. A permit counts as finished when the city marks it final, finaled or closed.
  • Electrical, mechanical and plumbing permits are separate from the building permit for the same job, so one project can count several times.
  • Homes are residential building permits, manufactured-home permits and trade permits on parcels the Spokane County Assessor classes as one to four homes. The layer has no ZIP code, so there is no split by ZIP code.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in the City of Spokane, WA", https://contractorrecords.com/spokane/accessory-permits, data through March 2026, from City of Spokane Development Services Center building-permit records.

Link to a table: By month · Season · How many get finished.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: finished share.

Common questions

  • How many garage, shed and shade structure permits does Spokane issue a year?About 219 a year in the City of Spokane: 438 permits issued April 2024 through March 2026, 192 of them in the last 12 months on file (to March 2026).
  • When do people in Spokane file the most garage, shed and shade structure permits?May (142 against an average month of 100); February is the quietest (49). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.