858 fence and wall permits were issued in the City of Spokane, April 2024 through March 2026: about 429 a year and 2% of all permits. 418 fence and wall permits in the last 12 months on file (Apr 2025–Mar 2026), 5% fewer than the 440 in the 12 months before. The busiest month is June.

858permits issued
418last 12 months on file
Junbusiest month
59%finished
Mar 2026records through

Fence and wall permits by month

Permits issued each month, April 2024 through March 2026.

Apr 2024: 56Apr2024May 2024: 49Jun 2024: 58Jul 2024: 42JulAug 2024: 52Sep 2024: 44Oct 2024: 43Nov 2024: 20Dec 2024: 11Jan 2025: 17Jan2025Feb 2025: 12Mar 2025: 36Apr 2025: 37May 2025: 58Jun 2025: 50Jul 2025: 39JulAug 2025: 47Sep 2025: 46Oct 2025: 38Nov 2025: 12Dec 2025: 23Jan 2026: 14Jan2026Feb 2026: 19Mar 2026: 35
The same numbers as a table
MonthPermits
Apr 202456
May 202449
Jun 202458
Jul 202442
Aug 202452
Sep 202444
Oct 202443
Nov 202420
Dec 202411
Jan 202517
Feb 202512
Mar 202536
Apr 202537
May 202558
Jun 202550
Jul 202539
Aug 202547
Sep 202546
Oct 202538
Nov 202512
Dec 202523
Jan 202614
Feb 202619
Mar 202635

Download this table (CSV)

When fence and wall permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (151), January the quietest (43). A busy month at the permit counter usually means a longer wait for a contractor.

January: 43 (100 = an average month)February: 43 (100 = an average month)March: 99 (100 = an average month)April: 130 (100 = an average month)May: 150 (100 = an average month)June: 151 (100 = an average month)151July: 113 (100 = an average month)August: 138 (100 = an average month)September: 126 (100 = an average month)October: 113 (100 = an average month)November: 45 (100 = an average month)December: 48 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January43
February43
March99
April130
May150
June151
July113
August138
September126
October113
November45
December48

Download this table (CSV)

How many fence and wall permits get finished

Permits issued Apr 2024–Mar 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Apr 2024–Mar 2025440
Finished59.3%

Download this table (CSV)

How these numbers are made

Source: City of Spokane GIS, Permit (Building and Engineering Permits) layer behind the Permit Activity Map, read 19 Oct 2026. We count permits issued April 2024 through March 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Spokane issues inside city limits: residential and commercial building, electrical, mechanical, plumbing, roofing/siding/window, solar, fence, demolition, pool, manufactured-home and sign permits. Side sewer, water and right-of-way permits from the city's Engineering side, planning cases and short-term rental licences are not counted. Spokane Valley, Liberty Lake and unincorporated Spokane County run their own permit offices and are not in this file.

  • The city's layer names no contractor, so there are no contractor lists, rankings or firm pages for Spokane.
  • The layer has no issue date, so a permit is dated by the day it was opened; permits the layer still shows in review are not counted.
  • The city keeps only the last three calendar years in this layer and last refreshed it in April 2026, so these pages end with March 2026.
  • The layer has no job value and no final inspection date, so we show no costs and no time to final. A permit counts as finished when the city marks it final, finaled or closed.
  • Electrical, mechanical and plumbing permits are separate from the building permit for the same job, so one project can count several times.
  • Homes are residential building permits, manufactured-home permits and trade permits on parcels the Spokane County Assessor classes as one to four homes. The layer has no ZIP code, so there is no split by ZIP code.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Fence and wall permits in the City of Spokane, WA", https://contractorrecords.com/spokane/fence-permits, data through March 2026, from City of Spokane Development Services Center building-permit records.

Link to a table: By month · Season · How many get finished.

Download the tables (CSV): Fences & walls permits by month · Fences & walls permits by calendar month (index) · Fences & walls permits: finished share.

Common questions

  • How many fence and wall permits does Spokane issue a year?About 429 a year in the City of Spokane: 858 permits issued April 2024 through March 2026, 418 of them in the last 12 months on file (to March 2026).
  • When do people in Spokane file the most fence and wall permits?June (151 against an average month of 100); January is the quietest (43). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.