Contractor Records
Home › Spokane › Electrical

Electrical permits in the City of Spokane, WA

Data through March 2026 · updated 19 Oct 2026

15,771 electrical permits were issued in the City of Spokane, April 2024 through March 2026: about 7,886 a year and 40% of all permits. 7,235 electrical permits in the last 12 months on file (Apr 2025–Mar 2026), 15% fewer than the 8,536 in the 12 months before. The busiest month is July.

15,771permits issued
7,235last 12 months on file
Julbusiest month
85%finished
Mar 2026records through

Electrical permits by month

Permits issued each month, April 2024 through March 2026.

Apr 2024: 751Apr2024May 2024: 763Jun 2024: 753Jul 2024: 818JulAug 2024: 719Sep 2024: 673Oct 2024: 802Nov 2024: 636Dec 2024: 652Jan 2025: 722Jan2025Feb 2025: 563Mar 2025: 684Apr 2025: 645May 2025: 618Jun 2025: 676Jul 2025: 789JulAug 2025: 627Sep 2025: 639Oct 2025: 648Nov 2025: 522Dec 2025: 512Jan 2026: 519Jan2026Feb 2026: 502Mar 2026: 538
The same numbers as a table
MonthPermits
Apr 2024751
May 2024763
Jun 2024753
Jul 2024818
Aug 2024719
Sep 2024673
Oct 2024802
Nov 2024636
Dec 2024652
Jan 2025722
Feb 2025563
Mar 2025684
Apr 2025645
May 2025618
Jun 2025676
Jul 2025789
Aug 2025627
Sep 2025639
Oct 2025648
Nov 2025522
Dec 2025512
Jan 2026519
Feb 2026502
Mar 2026538

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (122), February the quietest (81). A busy month at the permit counter usually means a longer wait for a contractor.

January: 94 (100 = an average month)February: 81 (100 = an average month)March: 93 (100 = an average month)April: 106 (100 = an average month)May: 105 (100 = an average month)June: 109 (100 = an average month)July: 122 (100 = an average month)122August: 102 (100 = an average month)September: 100 (100 = an average month)October: 110 (100 = an average month)November: 88 (100 = an average month)December: 89 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January94
February81
March93
April106
May105
June109
July122
August102
September100
October110
November88
December89

Download this table (CSV)

How many electrical permits get finished

Permits issued Apr 2024–Mar 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Apr 2024–Mar 20258,536
Finished84.8%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical ePermit - Remodels12,00276%
Limited Energy ePermit1,69111%
Electrical ePermit-New Bldgs & Addtns1,1367%
Electrical Permit9426%

Download this table (CSV)

How Spokane compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Spokane GIS, Permit (Building and Engineering Permits) layer behind the Permit Activity Map, read 19 Oct 2026. We count permits issued April 2024 through March 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Spokane issues inside city limits: residential and commercial building, electrical, mechanical, plumbing, roofing/siding/window, solar, fence, demolition, pool, manufactured-home and sign permits. Side sewer, water and right-of-way permits from the city's Engineering side, planning cases and short-term rental licences are not counted. Spokane Valley, Liberty Lake and unincorporated Spokane County run their own permit offices and are not in this file.

  • The city's layer names no contractor, so there are no contractor lists, rankings or firm pages for Spokane.
  • The layer has no issue date, so a permit is dated by the day it was opened; permits the layer still shows in review are not counted.
  • The city keeps only the last three calendar years in this layer and last refreshed it in April 2026, so these pages end with March 2026.
  • The layer has no job value and no final inspection date, so we show no costs and no time to final. A permit counts as finished when the city marks it final, finaled or closed.
  • Electrical, mechanical and plumbing permits are separate from the building permit for the same job, so one project can count several times.
  • Homes are residential building permits, manufactured-home permits and trade permits on parcels the Spokane County Assessor classes as one to four homes. The layer has no ZIP code, so there is no split by ZIP code.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in the City of Spokane, WA", https://contractorrecords.com/spokane/electrical-permits, data through March 2026, from City of Spokane Development Services Center building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: finished share · Electrical permits by permit type.

Common questions

  • How many electrical permits does Spokane issue a year?About 7,886 a year in the City of Spokane: 15,771 permits issued April 2024 through March 2026, 7,235 of them in the last 12 months on file (to March 2026).
  • When do people in Spokane file the most electrical permits?July (122 against an average month of 100); February is the quietest (81). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.