Remodel and repair permits in the City of Spokane, WA

Data through March 2026 · updated 19 Oct 2026

1,942 remodel and repair permits were issued in the City of Spokane, April 2024 through March 2026: about 971 a year and 5% of all permits. 883 remodel and repair permits in the last 12 months on file (Apr 2025–Mar 2026), 17% fewer than the 1,059 in the 12 months before. The busiest month is October.

1,942permits issued
883last 12 months on file
Octbusiest month
67%finished
Mar 2026records through

Remodel and repair permits by month

Permits issued each month, April 2024 through March 2026.

Apr 2024: 82Apr2024May 2024: 106Jun 2024: 104Jul 2024: 96JulAug 2024: 80Sep 2024: 87Oct 2024: 97Nov 2024: 70Dec 2024: 80Jan 2025: 83Jan2025Feb 2025: 84Mar 2025: 90Apr 2025: 78May 2025: 74Jun 2025: 82Jul 2025: 73JulAug 2025: 80Sep 2025: 88Oct 2025: 94Nov 2025: 50Dec 2025: 58Jan 2026: 89Jan2026Feb 2026: 60Mar 2026: 57
The same numbers as a table
MonthPermits
Apr 202482
May 2024106
Jun 2024104
Jul 202496
Aug 202480
Sep 202487
Oct 202497
Nov 202470
Dec 202480
Jan 202583
Feb 202584
Mar 202590
Apr 202578
May 202574
Jun 202582
Jul 202573
Aug 202580
Sep 202588
Oct 202594
Nov 202550
Dec 202558
Jan 202689
Feb 202660
Mar 202657

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (118), November the quietest (74). A busy month at the permit counter usually means a longer wait for a contractor.

January: 106 (100 = an average month)February: 89 (100 = an average month)March: 91 (100 = an average month)April: 99 (100 = an average month)May: 111 (100 = an average month)June: 115 (100 = an average month)July: 104 (100 = an average month)August: 99 (100 = an average month)September: 108 (100 = an average month)October: 118 (100 = an average month)118November: 74 (100 = an average month)December: 85 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January106
February89
March91
April99
May111
June115
July104
August99
September108
October118
November74
December85

Download this table (CSV)

How many remodel and repair permits get finished

Permits issued Apr 2024–Mar 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Apr 2024–Mar 20251,059
Finished67.3%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Building Permit1,36370%
Roofing, Siding, Window57930%

Download this table (CSV)

How Spokane compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Spokane GIS, Permit (Building and Engineering Permits) layer behind the Permit Activity Map, read 19 Oct 2026. We count permits issued April 2024 through March 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Spokane issues inside city limits: residential and commercial building, electrical, mechanical, plumbing, roofing/siding/window, solar, fence, demolition, pool, manufactured-home and sign permits. Side sewer, water and right-of-way permits from the city's Engineering side, planning cases and short-term rental licences are not counted. Spokane Valley, Liberty Lake and unincorporated Spokane County run their own permit offices and are not in this file.

  • The city's layer names no contractor, so there are no contractor lists, rankings or firm pages for Spokane.
  • The layer has no issue date, so a permit is dated by the day it was opened; permits the layer still shows in review are not counted.
  • The city keeps only the last three calendar years in this layer and last refreshed it in April 2026, so these pages end with March 2026.
  • The layer has no job value and no final inspection date, so we show no costs and no time to final. A permit counts as finished when the city marks it final, finaled or closed.
  • Electrical, mechanical and plumbing permits are separate from the building permit for the same job, so one project can count several times.
  • Homes are residential building permits, manufactured-home permits and trade permits on parcels the Spokane County Assessor classes as one to four homes. The layer has no ZIP code, so there is no split by ZIP code.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in the City of Spokane, WA", https://contractorrecords.com/spokane/remodel-permits, data through March 2026, from City of Spokane Development Services Center building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: finished share · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Spokane issue a year?About 971 a year in the City of Spokane: 1,942 permits issued April 2024 through March 2026, 883 of them in the last 12 months on file (to March 2026).
  • When do people in Spokane file the most remodel and repair permits?October (118 against an average month of 100); November is the quietest (74). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.