Demolition permits in the City of Spokane, WA

Data through March 2026 · updated 19 Oct 2026

215 demolition permits were issued in the City of Spokane, April 2024 through March 2026: about 108 a year and under 1% of all permits. 90 demolition permits in the last 12 months on file (Apr 2025–Mar 2026), 28% fewer than the 125 in the 12 months before. The busiest month is October.

215permits issued
90last 12 months on file
Octbusiest month
73%finished
Mar 2026records through

Demolition permits by month

Permits issued each month, April 2024 through March 2026.

Apr 2024: 8Apr2024May 2024: 13Jun 2024: 20Jul 2024: 4JulAug 2024: 10Sep 2024: 3Oct 2024: 14Nov 2024: 20Dec 2024: 8Jan 2025: 14Jan2025Feb 2025: 0Mar 2025: 11Apr 2025: 8May 2025: 1Jun 2025: 5Jul 2025: 8JulAug 2025: 13Sep 2025: 11Oct 2025: 17Nov 2025: 7Dec 2025: 1Jan 2026: 13Jan2026Feb 2026: 4Mar 2026: 2
The same numbers as a table
MonthPermits
Apr 20248
May 202413
Jun 202420
Jul 20244
Aug 202410
Sep 20243
Oct 202414
Nov 202420
Dec 20248
Jan 202514
Feb 20250
Mar 202511
Apr 20258
May 20251
Jun 20255
Jul 20258
Aug 202513
Sep 202511
Oct 202517
Nov 20257
Dec 20251
Jan 202613
Feb 20264
Mar 20262

Download this table (CSV)

When demolition permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (173), February the quietest (22). A busy month at the permit counter usually means a longer wait for a contractor.

January: 151 (100 = an average month)February: 22 (100 = an average month)March: 73 (100 = an average month)April: 89 (100 = an average month)May: 78 (100 = an average month)June: 140 (100 = an average month)July: 67 (100 = an average month)August: 128 (100 = an average month)September: 78 (100 = an average month)October: 173 (100 = an average month)173November: 151 (100 = an average month)December: 50 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January151
February22
March73
April89
May78
June140
July67
August128
September78
October173
November151
December50

Download this table (CSV)

How many demolition permits get finished

Permits issued Apr 2024–Mar 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Apr 2024–Mar 2025125
Finished72.8%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Demolition Permit20997%
Residential Building Permit63%

Download this table (CSV)

How these numbers are made

Source: City of Spokane GIS, Permit (Building and Engineering Permits) layer behind the Permit Activity Map, read 19 Oct 2026. We count permits issued April 2024 through March 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Spokane issues inside city limits: residential and commercial building, electrical, mechanical, plumbing, roofing/siding/window, solar, fence, demolition, pool, manufactured-home and sign permits. Side sewer, water and right-of-way permits from the city's Engineering side, planning cases and short-term rental licences are not counted. Spokane Valley, Liberty Lake and unincorporated Spokane County run their own permit offices and are not in this file.

  • The city's layer names no contractor, so there are no contractor lists, rankings or firm pages for Spokane.
  • The layer has no issue date, so a permit is dated by the day it was opened; permits the layer still shows in review are not counted.
  • The city keeps only the last three calendar years in this layer and last refreshed it in April 2026, so these pages end with March 2026.
  • The layer has no job value and no final inspection date, so we show no costs and no time to final. A permit counts as finished when the city marks it final, finaled or closed.
  • Electrical, mechanical and plumbing permits are separate from the building permit for the same job, so one project can count several times.
  • Homes are residential building permits, manufactured-home permits and trade permits on parcels the Spokane County Assessor classes as one to four homes. The layer has no ZIP code, so there is no split by ZIP code.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Demolition permits in the City of Spokane, WA", https://contractorrecords.com/spokane/demolition-permits, data through March 2026, from City of Spokane Development Services Center building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits: finished share · Demolition permits by permit type.

Common questions

  • How many demolition permits does Spokane issue a year?About 108 a year in the City of Spokane: 215 permits issued April 2024 through March 2026, 90 of them in the last 12 months on file (to March 2026).
  • When do people in Spokane file the most demolition permits?October (173 against an average month of 100); February is the quietest (22). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.