Plumbing permits in the City of Spokane, WA

Data through March 2026 · updated 19 Oct 2026

3,628 plumbing permits were issued in the City of Spokane, April 2024 through March 2026: about 1,814 a year and 9% of all permits. 1,692 plumbing permits in the last 12 months on file (Apr 2025–Mar 2026), 13% fewer than the 1,936 in the 12 months before. The busiest month is October.

3,628permits issued
1,692last 12 months on file
Octbusiest month
75%finished
Mar 2026records through

Plumbing permits by month

Permits issued each month, April 2024 through March 2026.

Apr 2024: 152Apr2024May 2024: 182Jun 2024: 154Jul 2024: 197JulAug 2024: 147Sep 2024: 172Oct 2024: 212Nov 2024: 135Dec 2024: 130Jan 2025: 190Jan2025Feb 2025: 123Mar 2025: 142Apr 2025: 153May 2025: 161Jun 2025: 155Jul 2025: 144JulAug 2025: 142Sep 2025: 145Oct 2025: 148Nov 2025: 103Dec 2025: 122Jan 2026: 137Jan2026Feb 2026: 136Mar 2026: 146
The same numbers as a table
MonthPermits
Apr 2024152
May 2024182
Jun 2024154
Jul 2024197
Aug 2024147
Sep 2024172
Oct 2024212
Nov 2024135
Dec 2024130
Jan 2025190
Feb 2025123
Mar 2025142
Apr 2025153
May 2025161
Jun 2025155
Jul 2025144
Aug 2025142
Sep 2025145
Oct 2025148
Nov 2025103
Dec 2025122
Jan 2026137
Feb 2026136
Mar 2026146

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (119), November the quietest (79). A busy month at the permit counter usually means a longer wait for a contractor.

January: 108 (100 = an average month)February: 86 (100 = an average month)March: 95 (100 = an average month)April: 101 (100 = an average month)May: 113 (100 = an average month)June: 102 (100 = an average month)July: 113 (100 = an average month)August: 96 (100 = an average month)September: 105 (100 = an average month)October: 119 (100 = an average month)119November: 79 (100 = an average month)December: 83 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January108
February86
March95
April101
May113
June102
July113
August96
September105
October119
November79
December83

Download this table (CSV)

How many plumbing permits get finished

Permits issued Apr 2024–Mar 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Apr 2024–Mar 20251,936
Finished75.4%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Plumbing Permit2,60172%
Mechanical Permit1,01928%
Medical Gas Permit8under 1%

Download this table (CSV)

How Spokane compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Spokane GIS, Permit (Building and Engineering Permits) layer behind the Permit Activity Map, read 19 Oct 2026. We count permits issued April 2024 through March 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Spokane issues inside city limits: residential and commercial building, electrical, mechanical, plumbing, roofing/siding/window, solar, fence, demolition, pool, manufactured-home and sign permits. Side sewer, water and right-of-way permits from the city's Engineering side, planning cases and short-term rental licences are not counted. Spokane Valley, Liberty Lake and unincorporated Spokane County run their own permit offices and are not in this file.

  • The city's layer names no contractor, so there are no contractor lists, rankings or firm pages for Spokane.
  • The layer has no issue date, so a permit is dated by the day it was opened; permits the layer still shows in review are not counted.
  • The city keeps only the last three calendar years in this layer and last refreshed it in April 2026, so these pages end with March 2026.
  • The layer has no job value and no final inspection date, so we show no costs and no time to final. A permit counts as finished when the city marks it final, finaled or closed.
  • Electrical, mechanical and plumbing permits are separate from the building permit for the same job, so one project can count several times.
  • Homes are residential building permits, manufactured-home permits and trade permits on parcels the Spokane County Assessor classes as one to four homes. The layer has no ZIP code, so there is no split by ZIP code.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in the City of Spokane, WA", https://contractorrecords.com/spokane/plumbing-permits, data through March 2026, from City of Spokane Development Services Center building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: finished share · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Spokane issue a year?About 1,814 a year in the City of Spokane: 3,628 permits issued April 2024 through March 2026, 1,692 of them in the last 12 months on file (to March 2026).
  • When do people in Spokane file the most plumbing permits?October (119 against an average month of 100); November is the quietest (79). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.